HomeMy WebLinkAboutagendapacket__03-11-24_0508_581
NOTICE OF MEETING
REGULAR MEETING
FOUNTAIN HILLS PLANNING AND ZONING COMMISSION
Chairperson Peter Gray
Vice Chairperson Rick Watts
Commissioner Patrick Dapaah
Commissioner Clayton Corey
Commissioner Susan Dempster
Commissioner Dan Kovacevic
Commissioner Scott Schlossberg
TIME:6:00 P.M. – REGULAR MEETING
WHEN:MONDAY, MARCH 11, 2024
WHERE:FOUNTAIN HILLS COUNCIL CHAMBERS
16705 E. AVENUE OF THE FOUNTAINS, FOUNTAIN HILLS, AZ
Commissioners of the Town of Fountain Hills will attend either in person or by telephone conference call; a quorum of the
Town’s Council, various Commission, Committee or Board members may be in attendance at the Commission meeting.
Notice is hereby given that pursuant to A.R.S. §1-602.A.9, subject to certain specified statutory exceptions, parents have a
right to consent before the State or any of its political subdivisions make a video or audio recording of a minor child. Meetings
of the Commission are audio and/or video recorded and, as a result, proceedings in which children are present may be subject
to such recording. Parents, in order to exercise their rights may either file written consent with the Town Clerk to such
recording, or take personal action to ensure that their child or children are not present when a recording may be made. If a
child is present at the time a recording is made, the Town will assume that the rights afforded parents pursuant to A.R.S.
§1-602.A.9 have been waived.
REQUEST TO COMMENT
The public is welcome to participate in Commission meetings.
TO SPEAK TO AN AGENDA ITEM, please complete a Request to Comment card, located in the back of
the Council Chambers, and hand it to the Executive Assistant prior to discussion of that item, if
possible. Include the agenda item on which you wish to comment. Speakers will be allowed three
contiguous minutes to address the Commission. Verbal comments should be directed through the
Presiding Officer and not to individual Commissioners.
TO COMMENT ON AN AGENDA ITEM IN WRITING ONLY, please complete a Request to Comment card,
indicating it is a written comment, and check the box on whether you are FOR or AGAINST and agenda
item, and hand it to the Executive Assistant prior to discussion, if possible.
REGULAR MEETING
REGULAR MEETING
1.CALL TO ORDER, PLEDGE OF ALLEGIANCE AND MOMENT OF SILENCE – Chair Gray
2.ROLL CALL – Chair Gray
3.CALL TO THE PUBLIC
Pursuant to A.R.S. §38-431.01(H), public comment is permitted (not required) on matters NOT listed on the agenda.
Any such comment (i) must be within the jurisdiction of the Commission, and (ii) is subject to reasonable time,
place, and manner restrictions. The Commission will not discuss or take legal action on matters raised during Call
to the Public unless the matters are properly noticed for discussion and legal action. At the conclusion of the Call to
the Public, individual commissioners may (i) respond to criticism, (ii) ask staff to review a matter, or (iii) ask that
the matter be placed on a future Commission agenda.
4.CONSIDERATION AND POSSIBLE ACTION: approving the regular meeting minutes of the
Planning and Zoning Commission February 12, 2024.
5.REVIEW, DISCUSS, AND PROVIDE COMMENTS: Possible amendments to Chapter 17, Wireless
Telecommunication Towers and Antenna
6.COMMISSION DISCUSSION/REQUEST FOR RESEARCH to staff.
7.SUMMARY OF COMMISSION REQUESTS from Development Services Director.
8.REPORT from Development Services Director.
9.ADJOURNMENT
CERTIFICATE OF POSTING OF NOTICE
The undersigned hereby certifies that a copy of the foregoing notice was duly posted in accordance with the statement filed
by the Planning and Zoning Commission with the Town Clerk.
Dated this ______ day of ____________________, 2024.
_____________________________________________
Paula Woodward, Executive Assistant
The Town of Fountain Hills endeavors to make all public meetings accessible to persons with disabilities. Please call 480-816-5199 (voice) or
1-800-367-8939 (TDD) 48 hours prior to the meeting to request a reasonable accommodation to participate in the meeting or to obtain
agenda information in large print format. Supporting documentation and staff reports furnished the Commission with this agenda are
available for review in the Development Services' Office.
Planning and Zoning Commission Meeting of March 11, 2024 2 of 2
ITEM 4.
TOWN OF FOUNTAIN HILLS
STAFF REPORT
Meeting Date: 03/11/2024 Meeting Type: Planning and Zoning Commission
Agenda Type: Submitting Department: Development Services
Prepared by: Paula Woodward, Executive Assistant
Staff Contact Information: John Wesley, Development Services Director
Request to Planning and Zoning Commission (Agenda Language): CONSIDERATION AND
POSSIBLE ACTION: approving the regular meeting minutes of the Planning and Zoning Commission
February 12, 2024.
Staff Summary (Background)
The intent of approving meeting minutes is to ensure an accurate account of the discussion and action
that took place at the meeting for archival purposes. Approved minutes are placed on the Town's
website and maintained as permanent records in compliance with state law.
Related Ordinance, Policy or Guiding Principle
N/A
Risk Analysis
N/A
Recommendation(s) by Board(s) or Commission(s)
N/A
Staff Recommendation(s)
Staff recommends approving the meeting minutes of the regular meeting minutes of the Planning and
Zoning Commission February 12, 2024.
SUGGESTED MOTION
MOVE to approve the regular meeting minutes of the Planning and Zoning Commission February 12,
2024.
Attachments
Summary Minutes & Verbatim Transcript
Planning and Zoning Commission February 12, 2024 1 of 2
TOWN OF FOUNTAIN HILLS SUMMARY MINUTES OF THE REGULAR MEETING OF
THE PLANNING AND ZONING COMMISSION FEBRUARY 12, 2024
1. CALL TO ORDER, PLEDGE OF ALLEGIANCE AND MOMENT OF SILENCE Chairperson Gray called the Regular Meeting of the Fountain Hills Planning and Zoning Commission held on February 12, 2024, to order at 6:09 p.m. and led the Commission and audience in the Pledge of Allegiance and Moment of Silence. 2. ROLLCALL
Commissioners Present: Chairperson Peter Gray; Vice Chairperson Rick Watts; Commissioner Clayton Corey (telephonically); Commissioner Patrick Dapaah (telephonically); Commissioner Susan Dempster Commissioner Dan Kovacevic; Commissioner Scott Schlossberg Staff Present: Development Services Director John Wesley (telephonically); Senior Planner Farhad Tavassoli and Executive Assistant Paula Woodward.
3. CALL TO THE PUBLIC
None 4. CONSIDERATION AND POSSIBLE ACTION: approving the regular meeting minutes of the Planning and Zoning January 8, 2024. MOVED BY Commissioner Dempster to approve the regular meeting minutes of the Planning and Zoning January 8, 2024. SECONDED BY Commissioner Kovacevic. Vote:7-0 Unanimously
5. PUBLIC HEARING, CONSIDERATION, AND POSSIBLE ACTION: Amending Zoning Ordinance Sections 1.12, Definitions, Section 5.14, Home Occupations, Section 10.02,
Permitted Uses, and Section 11.02 Permitted Uses as they pertain to prohibited uses. The following resident addressed the Commission: Larry Meyers MOVED BY Chair Gray to recommend the Town Council approve Amending Zoning Ordinance Sections 1.12, Definitions, Section 5.14, Home Occupations, Section 10.02, Permitted Uses, and Section 11.02 Permitted Uses as they pertain to prohibited uses with modifications recapped by Chair Gray. SECONDED BY Commissioner Kovacevic. Vote:7-0 Unanimously Commissioner Corey Aye Commissioner Dapaah Aye
Commissioner Dempster Aye Commissioner Kovacevic Aye Commissioner Schlossberg Aye
Vice Chair Watts Aye Chair Gray Aye 6. PUBLIC HEARING, CONSIDERATION, AND POSSIBLE ACTION: Ordinance 24-02 amending Zoning Ordinance Section 5.13, Community Residences, to provide for re-inspection of homes for compliance with ordinance requirements.
Planning and Zoning Commission February 12, 2024 2 of 2
The following residents addressed the Commission: Larry Meyers
Crystal Cavanaugh The following residents provided written statements stating that they were for the request: Liz Gildersleeve MOVED BY Vice Chair Watts to continue agenda item, #6, to the next scheduled Planning and Zoning Commission meeting, March 11, 2024. SECONDED BY Commissioner Kovacevic. Vote:7-0 Unanimously Commissioner Corey Aye Commissioner Dapaah Aye Commissioner Dempster Aye Commissioner Kovacevic Aye
Commissioner Schlossberg Aye Vice Chair Watts Aye Chair Gray Aye
7. COMMISSION DISCUSSION/REQUEST FOR RESEARCH to staff. 8. SUMMARY OF COMMISSION REQUESTS from Development Services Director. 9. REPORT from Development Services Director. 10. ADJOURNMENT Chair Gray adjourned the Regular meeting of the Fountain Hills Planning and Zoning Commission held on February 12, 2024 at 7:58 p.m. PLANNING AND ZONING COMMISSION
Chairperson Peter Gray
ATTESTED AND PREPARED BY
Paula Woodward, Executive Assistant
CERTIFICATION
I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the Regular Meeting held by the Planning and Zoning Commission, Fountain Hills in the Town Hall
Council Chambers on February 12, 2024 I further certify that the meeting was duly called and that a quorum was present. DATED this day of February 12, 2024
Paula Woodward, Executive Assistant
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 1 of 44
Post-Production File
Town of Fountain Hills
Planning and Zoning Commission Meeting Minutes
February 12, 2024
Transcription Provided By:
eScribers, LLC
* * * * *
Transcription is provided in order to facilitate communication accessibility and may not
be a totally verbatim record of the proceedings.
* * * * *
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 2 of 44
CHAIR GRAY: Let's go ahead and call this meeting to order with the Pledge of Allegiance
and a moment of silence, please.
ALL: I pledge allegiance to the flag of the United States of America and to the Republic
for which it stands, one nation under God, indivisible, with liberty and justice for all.
CHAIR GRAY: Thank you. All right. With two absent, let's go ahead and do roll call,
Paula.
WOODWARD: Commissioner Corey?
COREY: Here.
WOODWARD: Commissioner Dapaah?
DAPAAH: Here.
WOODWARD: Commissioner Dempster?
DEMPSTER: Here.
WOODWARD: Commissioner Kovacevic?
KOVACEVIC: Here.
WOODWARD: Commissioner Schlossberg?
SCHLOSSBERG: Here.
WOODWARD: Vice Chairman Watts?
VICE CHAIR WATTS: Here.
WOODWARD: CHAIR GRAY?
CHAIR GRAY: Here. Thank you, Paula. Agenda item 3, call to the public. Paula, any
speaker cards or written comments?
WOODWARD: No, Chairman.
CHAIR GRAY: Thank you. Agenda item 4, consideration and action on the January 8th
meeting minutes. Commissioners, any discussion or a motion, please? Commissioner
Dempster?
DEMPSTER: I'd like to move to approve the regular meeting minutes of the Planning
and Zoning Commission January 8th, 2024.
DAPAAH: Chairman, I have a question about this minutes, and just for the record, if I
misunderstood something, I heard the applicant's attorney mentioning to the mayor
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 3 of 44
and council that our discussion -- that we actually asked her extend the delivery time to
11. But according to the minutes, which I agree with, which is my understanding that
we actually requested for her to apply to extend the storefront hours. Was that the
understanding?
CHAIR GRAY: There was discussion. Yeah, there was discussion on both fronts. But I
don't recall asking the applicant to reapply or modify their application.
VICE CHAIR WATTS: We offered.
CHAIR GRAY: We offered?
DAPAAH: And she declined.
CHAIR GRAY: Right. Is that clarified, Commissioner?
DAPAAH: Okay. Well, was that for delivery -- extension of the delivery time or the
storefront hours?
CHAIR GRAY: Storefront hours.
DAPAAH: Okay. Okay. Good. Okay. So she stated it wrong to the council, just for the
record. All right. Thank you.
CHAIR GRAY: Thank you. Commissioner. Commissioner Dempster has a motion on the
table. Is there a second? Commissioner Kovacevic?
KOVACEVIC: Second.
CHAIR GRAY: All in favor?
ALL: Aye.
WOODWARD: Seven-zero.
CHAIR GRAY: All right. Agenda item 5, public hearing consideration and potential action
on several sections related to home occupations, permitted uses, and prohibited uses.
Director Wesley, are you giving the presentation on this?
WOODWARD: John.
CHAIR GRAY: Uh oh.
WESLEY: There we go. I guess we got to unmute this, hadn't I?
CHAIR GRAY: There you are.
WESLEY: (Indiscernible) the presentation, couldn't hear it.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 4 of 44
CHAIR GRAY: Yes, sir.
WESLEY: Okay. Yeah. Farhad's going to adjust the slides for me, and I'm going to give
the presentation. So hopefully, you can hear and it comes across. I apologize for not
being able to be there this evening, but hopefully we can move through these anyway.
So Farhad, hopefully, you're there, ready to move. There's a delay in the TV, so if I get
too far off or anything, let me know.
So this first text amendment is about our home occupation regulations. We've had a
few challenges come up recently that we've been dealing with, in particular a situation
where a home is being used. I'm going to describe this somewhat generally because it's
still an active, ongoing issue we're dealing with, but it's being used by some people who
are basically social media influencers. And every night a group of them will show up at
the home, which is otherwise we're not sure being occupied. And photographers show
up, and they take various pictures in and around the property. And activity occurs kind
of through the night. And then they're all gone.
And it doesn't neatly fit any of our current regulations and definitions. Because it's not
really, truly a home occupation, but got us looking at those regulations and trying to
make some adjustments. So hopefully we can address this type of thing and other
changes that might occur in the future as technologies change and different types of
activities change.
So basically a little background, residential zoning districts, both single and multifamily,
allow for home occupations. They're defined in section 1.12 of the zoning ordinance.
Regulations are contained in 5.14. And again, these regulations have not been updated
for a while to keep current with different technologies and do have some specific issues
that we're trying to cover that are not adequately covered by the current codes.
So moving to the next slide the definitions. Section 1.12, first change is a very minor
change, but thought it may be helpful as we deal with these things. The current
definition talks about the building being designed for residential uses but doesn't
necessarily say they're being used for residential purposes. So I thought that would be
helpful to add that language in there. In going back through the presentation and
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 5 of 44
looking at this definition, I think we may also want to take where it has single-family and
multifamily and actually change that to an "or". So that's if that's agreeable, we'll
probably make that change, and Chair, it might be helpful as we go through these, if
anybody has any questions that we go ahead and handle them at the time as we're
looking at each of these different proposed changes.
CHAIR GRAY: Commissioners, any conversation on 1.12? Commissioner Dempster?
DEMPSTER: Sorry, John. You said to change it to single-family or multifamily?
WESLEY: Correct.
DEMPSTER: You have and on here. Okay.
WESLEY: Right. Yeah. "And" is in there. "And" is in the current ordinance, as I was
reading back through that again, I thought "or" probably fits better.
DEMPSTER: Okay.
WESLEY: So that's another change that's not shown there.
CHAIR GRAY: Commissioner Dapaah or Corey, you're going to have to flag me if you
want to chime in here, please.
DAPAAH: Okay.
COREY: Okay.
WESLEY: Moving on to the next one. Again, after I sent out the staff report going back
through our ordinances, I'd forgotten that we actually had a definition of home
occupation in the code. And so I've added that into the presentation this evening and
would add it into the ordinance when it goes to council. I'm proposing to make some
changes here. As you can see on the screen, the occupation or profession carried out in
a dwelling unit by residents thereof, which user activity and then goes on with the same.
So providing a, hopefully, a clear definition of what a home occupation is. The rest of
that statement goes on and starts to provide some of these standards beyond the
definition, which are contained in 5.14. And so I'm proposing to remove those and keep
the standards in one place separate from the definition. It can be confusing when you
forget you have them in two places to keep them the same. Plus, general practice is
best to have definitions be definitions and standards be elsewhere in an ordinance.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 6 of 44
CHAIR GRAY: So John, under 1.12 here, the intent is to enhance this language to where
the primary use -- it has to be the -- it has to be the place of domicile for the business
owner. Correct? Primary place of domicile.
WESLEY: Okay.
CHAIR GRAY: Correct.
WESLEY: You have questions about that definition? Okay. We'll move on then.
CHAIR GRAY: John, hold one second. Vice Chair Watts?
WESLEY: Okay.
VICE CHAIR WATTS: Does that mean that the resident has to reside there?
CHAIR GRAY: Yes.
VICE CHAIR WATTS: A hundred percent of the time?
CHAIR GRAY: It has to be a registered physical address.
VICE CHAIR WATTS: Okay. So what about winter visitors?
WESLEY: Right. So that means they can -- then when they're living someplace else,
have the same home occupation, wherever they're living at the time.
VICE CHAIR WATTS: John, say that one again for me, please.
WESLEY: So yeah. So a person living at -- at, you know, home A while, they're living
there, they can occupy conduct the home occupation in that home. Somebody who
doesn't live there can't conduct a home occupation there, or when if they're winter
visitors and they go away for six months, that home occupation should cease at that
dwelling during that time because they're not there.
VICE CHAIR WATTS: Okay. So no activity when the resident isn't there?
CHAIR GRAY: Well, there's several definitions that intertwine here. So.
WESLEY: Right.
CHAIR GRAY: Other employees needing to be members of the immediate family, et
cetera.
VICE CHAIR WATTS: But that goes back to the family. So as long as the family is
represented there?
WESLEY: Right.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 7 of 44
CHAIR GRAY: So is a group of social media influencers family?
VICE CHAIR WATTS: Could be.
CHAIR GRAY: Could be.
WESLEY: If they actually lived there and there were only four of them, they could.
CHAIR GRAY: What if I lived there in spirit, John?
WESLEY: We'll think on that one.
CHAIR GRAY: Okay. Thanks.
WESLEY: Any other questions on this one? Now moving to section 5.14, the next slide.
And so this section provides actual standards associated with the occupation of --
operation of a home occupation. So again, trying to tighten it up a little bit in the first
statement there about the home occupation shall be conducted only by persons who
live at the property. And conducted in a manner clearly incidental when not the
current. And B limits it to 25 percent. That's, honestly difficult to enforce. You really
don't know how much of the home is being used. But sometimes as we get different
applications in, we will raise the question because it's something that could easily
exceed that. And so we'll make sure that they understand that provision. And then
again trying to reinforce in C that any employees involved can't be working in the home.
So I'm a contractor, and I work out of my home to schedule all my work and manage my
contract business. But all the people who work for me on site, I'll meet them at site.
They can't work at the home.
Questions there?
CHAIR GRAY: Vice chair Watts.
VICE CHAIR WATTS: Chair and John, in C, no employees. But is there another section?
As I recall, there was some other section that qualified the community homes and
allowed for employees to be there. And then, we would defer back to another
definition in the ordinance that established the number of employees that could be
there at that given time.
WESLEY: Correct. That's correct.
VICE CHAIR WATTS: Should we have a reference --
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 8 of 44
WESLEY: (Indiscernible).
VICE CHAIR WATTS: Okay.
CHAIR GRAY: Commissioner Dempster?
DEMPSTER: I have a couple questions. Sorry. Going back to A, I missed a note that I
made for myself. So with dwellings and sometimes homes have casitas and they have
businesses or home offices, home occupations. They work out of their casita. When
you have accessory buildings, does that cover casitas?
WESLEY: So we're going to see a provision come up here a minute that limits the home
occupation to be in the primary structure or in the garage. It's not supposed to be an
accessory structure or in the yard.
DEMPSTER: Okay. And then, I thought there was something contradictory. So with
employees, there shall be no employees working at the home other than the members
of the immediate family. But does that -- what happens when and you go on to say
when the workers come to get assignments and equipment. So when they're coming to
pick up equipment and get assignments and such, that is not considered work, correct?
WESLEY: So that wouldn't be working at the home, necessarily. But that is covered
under the trip generation. So there can't be a whole lot of employees coming and going
to get assignments.
DEMPSTER: So that would cover -- that would be counted under the six vehicle trips per
day?
WESLEY: Correct.
DEMPSTER: Okay.
WESLEY: Which we'll talk about a little bit more in a minute what that means.
DEMPSTER: Okay. Thank you.
WESLEY: There no other questions there, we can go to the next slide. So moving on.
With the delivery vehicles, added a little bit of language there. Again, with the thing
within C, a bunch of vehicles come, photographers come and go, people come and go
carrying suitcases and whatever. So that's some vehicular activity that's really not
customary to our residents. Right now we wouldn't even consider it a home occupation.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 9 of 44
But in case they do some things that start to qualify it that way, just trying to cover
more bases with that one. And then nuisances and signs, no proposed changes in those.
Coming down to traffic, adding another provision for parking. But here's where we do
have the six vehicle trips per day.
Currently that says five trips, but when we look at the definitions and what that means,
it's talking about a vehicle trips. Every time a vehicle moves, that's a trip. So I come --
I'm a worker, and I come to the property to pick up an assignment. That's one vehicle
trip. When I leave, that's a second vehicle trip. So that's really three vehicles coming
and going, is what that limits it to. And at five, that's two-and-a-half. So that was odd.
And so it seemed like it ought to go to an even number either four or six. And we went
up to six. But we wouldn't have a problem necessarily going down to four. But if you
think of that contractor who lived there you know, four barely covers them. They leave
in the morning, come back at lunch, leave again, come back in the evening. If they had
any other reason to come back to the site, or if you think of some other ones. So it's
maybe a realtor that's working from home, how many times might they come and go
during the day? So six seemed more reasonable to us.
And then we've had some challenges with the regulations in town code section twelve
12.310 with regard to commercial vehicles parked on the property. And again, thinking
of people who don't even have a home occupation, but they work for a company that
provides for them a work vehicle. And so they bring that home. So that's already
happening with the commercial vehicle being parked on the property, or I'm the pool
contractor or again, the realtor and I park my vehicle at my home. So I want to be a
little bit more clear and reasonable with that. So certainly allowing for one commercial
vehicle to be parked associated with the business perhaps to comply with the other
section of town code, which we'll talk about a little bit later, because we're proposing
some amendments there.
Any questions on those?
CHAIR GRAY: Commissioner Dempster?
DEMPSTER: Yes. One quick question. So would the deliveries be included in the trip
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 10 of 44
total?
WESLEY: Yes. That's customer patron and shipping receiving.
DEMPSTER: Okay. Thank you.
COREY: Chair?
CHAIR GRAY: Commissioner Corey.
COREY: All right. Thank you. So I agree with and definitely support your
recommendations here, John. I'm curious, could you elaborate on, like, how would
these trips and parking be monitored and enforced?
WESLEY: Sure. So certainly on an ongoing basis, we don't have enough code officers to
be around town checking everyone. And so it would be on a complaint basis. If we have
somebody informing us that they're seeing a lot of vehicles coming and going, and we
would start to investigate, monitor the property, make sure the owner of the business is
aware of the ordinance requirements and go from there.
COREY: Okay. Now I also work from home, so it sounds like I'm going to have to start
tracking when I go to the coffee shop, and then when I go get my sub sandwich at
lunchtime. And so what is it, six?
WESLEY: Yeah. And certainly, that that is a challenge here. And all these things kind of
come together, and you know, what needs to be enforced and what's really causing a
problem. But you know, when you are a person that works at home because you're
going, to the to get them lunch, is that a work trip or is that just because you live there
trip. And it does get to be a little bit of a challenge. And it does say the customer
patron and the shipping receiving, it doesn't necessarily say the resident trips.
CHAIR GRAY: Commissioner Corey, you get that? You get that AI, assistant
commissioner, then you just make one trip because she'd schedule it for you.
COREY: Oh, All right. I like it.
DEMPSTER: John, that was you kind of touched upon my clarification because, I do
work from home at times. I also go to the office. But how -- I might get a delivery that's
directly related to my business. But then I might get a delivery because I need, a new
flower pot for my house. How do you differentiate between personal and your
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 11 of 44
business?
WESLEY: And certainly that's a challenge with this. There's a lot of little challenges in
here when you're mixing these two activities. And so, again, we would look at it, if
somebody's seen enough trips coming and going that they're complaining, then we
would monitor it and we would talk to the business and try to get a handle on what's
going on. If they're just passionate Amazon shoppers and have lots of different
Amazon's for personal reasons come and going, you know, it -- this would -- could be a
challenge.
CHAIR GRAY: John, any opinion from the chamber on the proposed amendment?
WESLEY: We have not specifically run it by them. We could reach out to them before
we go to council, if you'd like.
Ready to go to the next slide?
So going on here then to H is the exceptions that Commissioner VICE CHAIR WATTS
brought up earlier, which does allow for the operation of the group home for the
handicapped. That's another one that maybe could be amended here to say community
residence. But to be consistent with other parts of the code today. But does allow the,
those exceptions to some of the requirements in the code because they're just naturally
going to not fit the standard type of home occupation being regulated.
And then under hazardous materials. Again, reading through this today, I recognized
another minor change ought to be made. It references the fire district, and that was
written when we didn't have our own in-house fire department. So I'll tweak that
language a little bit as I take it on to council something about the town fire marshal
being assured that proper handling and storage and disposal. Yeah.
And then in J, uses not permitted. We've had some situations recently we've dealt with,
particularly with animals, people trying to run some animal boarding types of things,
animal daycare things out of their home and caused some issues in the neighborhood.
So we wanted to add that to a use not permitted to make that clear. Hmm.
Any questions on those?
KOVACEVIC: Sure.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 12 of 44
CHAIR GRAY: Commissioner Kovacevic.
KOVACEVIC: Yeah. The temporary overnight keeping of animals, where they keeping
more than -- were they keeping a lot of dogs or cats or whatever?
WESLEY: Yes.
KOVACEVIC: So aren't we already in the other ordinances limited to four animals in a
residence?
WESLEY: Yes.
KOVACEVIC: So isn't this kind of duplicative?
WESLEY: Well, but here they were claiming they were only keeping four animals, which
is what was allowed. But then they actually had their own. And at times there would
be, five, six, eight animals running around the property. Some, they claimed, were
theirs. Some they were caring for. Anyway, we just felt it would be better to add this
extra enforcement tool when it was clear that they were taking care of other people's
animals.
KOVACEVIC: Well, I don't know, I guess I'm still wrestling with it. I mean, if they've got
eight animals on the property, they're breaking the law outside of section 5.14.
WESLEY: Correct.
KOVACEVIC: So is this necessary?
WESLEY: Well, by allowing the opportunity for someone to keep animals at their home,
if we could be confident they'd always keep it at the four, I guess we'd be okay, but it
just opens that door for them to start keeping them, and having their own, and it just
becomes more confusing.
CHAIR GRAY: I think it's fine to keep it a prohibited use in a residence. If you've got
your own animals at home, you've got control of them. You can control the barking and
everything else. When you're boarding, it's a different ballgame.
KOVACEVIC: Yeah, but if I'm traveling and I drop my dog off at my neighbor's and slip
the ten-year-old that's going to walk the dog every day, 20 bucks.
CHAIR GRAY: Don't tell anybody.
KOVACEVIC: Well, yeah, but I don't want to be a scofflaw. I mean, I don't like this.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 13 of 44
WESLEY: Yeah. That's not a home occupation being set up for an ongoing job. That's a
temporary -- having a neighbor do something for you.
KOVACEVIC: Well, that's what it says. Temporary.
WESLEY: Right. So we're under the definition of home occupation. And so is that
somebody getting a business license to do that and operate an ongoing business out of
their home?
KOVACEVIC: Okay.
CHAIR GRAY: Vice Chair Watts?
VICE CHAIR WATTS: I've got a similar concern, but it's -- couldn't we alleviate some of
the concerns by referencing the other component of the ordinance that's already
established ,and I think that applies to the keeping of the animals because we could
rather than prohibit it here. But in a temporary situation you've got the number of four.
So you reference another piece of the ordinance somewhere else. So we make some
references.
And it's kind of like in the hazardous materials component. Pool companies have
hazardous materials, flooring contractors, air conditioning contractors, welding
companies that work out of their house. How do we regulate hazardous material
today? Is there something in the ordinance that says they have to have the inspection?
Because all of those are fairly volatile. And if we do, then we should have something
that references here consistent with whatever that particular ordinance is. That make
any sense?
WESLEY: Well, sure. When a person applies for their business license to operate their
home occupation, one of the people that gets notification of that business license is the
fire marshal. And if he has any concerns about the business and what types of products
they may have, then he can investigate it at the time.
VICE CHAIR WATTS: Okay.
CHAIR GRAY: I think we're okay to keep moving, John.
WESLEY: Okay. And if you know, if there's a desire to take the animal piece out, we can
do that. That was not one of the primary issues in bringing this forward, but we were
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 14 of 44
taking advantage of this to address some challenges we've had. But moving on then to
sections 10.02 and 11.02, which provide for the permitted uses in the residential and
multifamily zoning districts. In 10.02 item 9, proposing a slight wording change there,
adding some words that are in the 11.02. Just to be clear on the section of the code for
home occupations, that's a pretty minor change. But the bigger thing is to add in each
of those. The new C on prohibited uses.
So except for items listed above, which again, is a list of allowed uses, nonresidential
uses, or activities of property or dwellings and associated structures are prohibited. So
this is the one that we really are hoping to be able to use for some of the activities we're
seeing, because it really isn't a home occupation that's happening. But it is definitely
not a nonresidential activity going on. And so we want to clearly label that as being
prohibited, so we can follow up, hopefully enforce that on the property owner and the
people conducting those activities.
CHAIR GRAY: No comments here, John.
WESLEY: Okay. So related, I mentioned earlier, this isn't technically your item because
it's not in the zoning ordinance, but I mentioned before section 12.310 of the town code
dealing with parking of vehicles in residential areas. Want to clarify that one
commercial vehicle can be allowed either on the driveway or behind a wall. Not in the
street, not on the gravel.
CHAIR GRAY: Commissioner Kovacevic?
KOVACEVIC: Does this supersede or could this supersede any HOA requirements to the
contrary?
WESLEY: So they are different. Whatever we say that might be different than an HOA,
it's always up to them to enforce their rules. So if the HOA has stricter rules, they can
still enforce their stricter rules.
CHAIR GRAY: Vice Chair Watts?
VICE CHAIR WATTS: Is there any need for a height requirement on those vehicles?
Some vehicles get fairly tall, and when they wrap them with advertisement, is that
something to at least consider?
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 15 of 44
WESLEY: Possibly. And we have to consider the person that's driving their work vehicle
home, whatever that might be. Don't want to necessarily pick on any business but a
plumbing company or a whatever that is a chain plumbing company, and they send their
employees home with their vehicles. So because they're on call, you know, standard
vehicle, however tall that is, I'm not sure if we'd get things that are exceptionally tall
semi-sized vehicles.
VICE CHAIR WATTS: I'm thinking more about all the Peterbilt tractor trailers that are
parked all around town.
WESLEY: Right.
VICE CHAIR WATTS: Maybe not too many.
CHAIR GRAY: No other comments, John.
WESLEY: Yeah. We haven't thought about that one. I think there's a need to add
something there, we could take a look at that. But otherwise that's it for this
presentation.
DEMPSTER: Just one last comment, John. To clarify it states that it should be parked on
the driveway or completely enclosed with the wall, blah, blah, blah, but that has to be
on a solid surface, correct? Don't we have that rule in another section?
WESLEY: Yeah. We have that in the RV language. I see that that doesn't say that here
specifically. We could add that.
DEMPSTER: The point to have it in the RV language is environmental or what?
WESLEY: Well, yeah. I can only maybe speculate a little bit, since I didn't write that, it's
been in the code for a while. But you got that bigger vehicle that's going to have a little
bit more impact on the surface of the ground over time and doesn't maybe move it
often. So making sure it has a solid base that it's parked on.
DEMPSTER: Thank you.
CHAIR GRAY: Vice Chair Watts?
VICE CHAIR WATTS: One more. I think that where each of these items is enhanced or
enforced, there ought to be a corresponding reference to another section of town
ordinance. And if for no other reason than to make it easy for people to cross check
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 16 of 44
before they make a mistake, or for the inspector to be able to reference it, now they
know, but the homeowner doesn't necessarily know. So we've talked a number of times
about it's covered elsewhere in the ordinances. Shouldn't we have a reference in there
that says where in the other ordinances so that it's easy to go double-check?
WESLEY: Certainly would like to make it user friendly in that regard. Most of that is in
5.14, so they're all together. It probably would be good. Or we could come back to the
definition of home occupation and put a reference in there to 5.14, so they know where
to go for any details in case somebody just looked at that definition and thinks that's all
there is. That would be a good modification to make.
VICE CHAIR WATTS: Well, when you talk about the parking, where does it cross over to
to parking in an ordinance? Where are the things like hazardous material referenced
for, again, for ease of interpretation. I spent a couple hours going back and forth
between these into the various, and I should have written them down, so I could tell you
exactly where they were. But to look at the ordinance and look at the specifics of what
you can and can't do in relationship to the changes that we're making.
WESLEY: Yeah. I guess, maybe I'd like to see your list of what all it is that you had to go
back and forth to.
VICE CHAIR WATTS: You're going to make me do the list, are you?
WESLEY: So I guess to get into hazardous materials because it makes a reference to
special use permits. So maybe a reference there to section 2.0, whichever one it is for
special use permits, if that's where you go to find out how to apply for one of those, that
type of thing.
VICE CHAIR WATTS: Yeah, yeah. Something to make it a little easier and user friendly
from a readability standpoint.
WESLEY: So we can certainly look for any further enhancements of that as we prepare a
final ordnance to take to council.
CHAIR GRAY: Commissioner Kovacevic?
KOVACEVIC: The ordinance revision as written and that we're voting on or may vote on
tonight, has a reference all of the zoning categories it applies to. It does not list
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 17 of 44
residential P.A.D.s. Are these activities permissible in the P.A.D. residences?
WESLEY: It would depend upon how the P.A.D. language was written. So if a P.A.D.
specifically says it's -- a, whatever, an R-135 zoning district with the following
modifications and doesn't modify anything about home occupations. And yes, it would
be allowed. If it says it doesn't allow home occupations then it wouldn't.
KOVACEVIC: So how would it affect Park Place?
WESLEY: Park Place is zoned C-2. It's not zoned residential. But still as a residence, it
would apply. Yeah. It's still regulated by trying to operate a home occupation out of a
residence.
KOVACEVIC: And how would it affect the Four Peaks Plaza proposed apartments?
WESLEY: Right. So residents there could also have home occupations.
KOVACEVIC: Because that's still going to be zoned C1?
WESLEY: No. It will be zoned P.A.D.
KOVACEVIC: So there's no underlying zoning?
CHAIR GRAY: Not anymore.
WESLEY: Yeah.
KOVACEVIC: So it's zoned --
CHAIR GRAY: Don't worry. There's no parks and no dog parks there. So there'll be no
boarding to happen at that P.A.D.
KOVACEVIC: Huh? All right. I don't know if I like that either. But -- all right.
CHAIR GRAY: So to Commissioner Kovacevic's point, though, John, if there's no -- in that
scenario where there's no underlying zoning to default to, if there's no carve-out, I think
that's the gap he's highlighting there, right.
WESLEY: Well, the home occupations take place in a dwelling unit. So if you've got a
dwelling unit, you can have a home occupation.
CHAIR GRAY: Well, that's the catch-all to it.
KOVACEVIC: You can have the home occupation, but do the prohibited uses apply? I
don't know that the prohibited uses apply in a dwelling unit in a P.A.D.
WESLEY: Yes, they would. So because it doesn't reference zoning there. Following uses
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 18 of 44
are not permitted as a home occupation.
KOVACEVIC: Well, can we add P.A.D. to the section 5-A in the ordinance as proposed
and add P.A.D.? I can't tell 5.13 C-6 that lists all the R-1-190, R-1-143. Shouldn't P.A.D.
be listed there?
WESLEY: No. Because that's separate. But picking up on what you're saying, though, if
we look at the very beginning, even before the A, home occupations are permitted in
any residential zone. Okay. So we do have some things that aren't residential zones
that have dwellings. So that's where maybe a slight modification could occur to either
make sure it's clear that you can have the home occupation wherever you've got a
dwelling, regardless of the zoning. Or if there's a need to restrict it clearly that you
cannot have a home occupation if your dwelling is in a C-2 zone or a P.A.D. zone or
anything else.
KOVACEVIC: Yeah. My concern isn't that you -- my concern is not that it would prohibit
home occupations in the P.A.D. zoning. My concern is that the restrictions don't apply
because P.A.D. is not listed in the ordinance as amended here.
WESLEY: But I guess neither is any other zoning district here in the regulations in 5.14.
And the prohibition comes back to the home occupation. Following are not permitted
in home occupation, and home occupations occur in a dwelling regardless of what the
zoning is.
KOVACEVIC: Why do we list all of the zoning categories and not list P.A.D.?
WESLEY: So if you're talking about on the subsequent slide here with the 10.02 and
11.02, that's because those are the two zoning districts that specifically allow for
residential uses, and specifically then allow for home occupations as part of a residence.
KOVACEVIC: Do you have a slide with the ordinance on it?
WESLEY: The entire ordinance?
KOVACEVIC: The proposed -- no. The proposed ordinance that was in our packet.
WESLEY: So no, just the pieces here as shown in the PowerPoint slides.
KOVACEVIC: Commissioners, do you see what I'm referring to?
CHAIR GRAY: I mean, the two examples, I think that I can think of that potentially
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 19 of 44
expose what you're talking about are one we voted on Dan Kaufman's development
down in Kingstree and Saguaro, which was a residence above, commercial underneath.
And they were supposed to be these hybrid-type work-live environments. That's one
place that it could potentially be exposed because of the underlying zoning is CC. The
other is the Four Peaks condos because part of the presentation and the premise of that
whole development was that you could live upstairs, work upstairs, and then come
down and work in the open communal workspaces down below, which is by and large,
promoting this very scenario.
So I think I'm more in your -- from your position on this, wondering how how do you tie
that environment down? Not to exclude it, but how do you tie down the exclusions in
those two environments? So you either have to broaden the front end and say it applies
to any residential dwelling, regardless of type, across any zoning district. That's the easy
way to do it. Or you've got to over label the back end as you're suggesting.
VICE CHAIR WATTS: So you're saying you got a choice between striking A and A in both
sections, or changing the verbiage at the front end?
CHAIR GRAY: I -- yeah, to me it would be easier to change the verbiage in the front end
and say the following applies to any residential dwelling, regardless of type. And then
the only scenario where it could be carved out is in a P.U.D. scenario, if the P.U.D. said
this P.U.D. allows for boarding of animals. Well, then the P.U.D.'s underlying
characteristics would carve-out an exclusion from this. But notwithstanding that, I think
you have to say all residences, regardless of type.
KOVACEVIC: And regardless of underlying zoning.
CHAIR GRAY: Well, let's think about that. Let's go to the public hearing.
Paula, speaker cards.
WOODWARD: We have one speaker card for Larry Meyers.
MEYERS: Larry Meyers, Chair, Commissioners. I have more of a question. So the
number of trips and this is a specific business at a specific location that I'm talking
about, and we'll just leave that aside for now. So I know there's a parking regulation,
and it has nothing to do with commercial vehicles, about how many vehicles you can
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 20 of 44
have at your home occupation. I don't know what that is, but to the number of vehicles
that are convened at a home, is that limited? And what is that number? And do they
have to be on the premises, rather than on the street of where the home is? And do
those count as -- does each one of those count as a trip? Because the example that I'm
going to give you is probably ten vehicles on a given morning. And then they leave, and
then they reconvene sometime later in the day, particular days of the week. So that
would be -- I don't know whether the ordinance states any of that, and we're not
dealing with that. But that came to mind when the whole trip thing came up. And the
fact that we're only monitoring a commercial vehicle on the property. This particular
location has a pretty big driveway, which is typically filled up, and maybe ten cars on the
street. So that's all I would be wondering about. Thank you.
CHAIR GRAY: We'll close the public hearing. Back to discussion. I think Mr. Myer's
concern is probably mitigated by the family component. At least in this language. Do
you have to be a family member to work at an at-home business? And I think John, it's
family member who also is residing at the business, right? You can't bring family in.
WESLEY: Correct, Chair. 15.14C. No employees -- there shall be no employees working
at the home other than members of the immediate family residing in the dwelling. And
so Chair, I don't know if this is what Mr. MEYERS was referring to or not, but we do have
a provision of the code that limits the total number of vehicles parked at a dwelling for
more than 24 hours, at one for 750 square feet in the home. And that's in the driveway
and the street within, I believe it's 1,000 feet of the home. So that's just a general
parking requirement, it has nothing to do with whether a business is being conducted or
not.
VICE CHAIR WATTS: I think that's a good example of why we need the point of
reference in the ordinance that says refer to this particular ordinance section. So now
you've got some point of reference to say you can't. You can't have all of those cars,
you have to defer back to the 750 square feet per vehicle. So I think there's numerous
instances in here that there's another ordinance that kind of overshadows or defaults to
whether it's more restrictive, less restrictive doesn't really matter. But there's another
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 21 of 44
one that adds more clarity to what this is and what you can and can't do.
CHAIR GRAY: So you'd limit those supplemental references to the exclusion criteria.
Right?
VICE CHAIR WATTS: I think in some cases they could be a little more liberal. I'm not
sure of that, though. I didn't see any that were more liberal than what was here. I
mean, if somebody had a 6,000-square-foot house and you've got four-car garage, you
could have a lot more vehicles, so it could be applicable because of the code, the way it
sits today, but this could be more restrictive. I just think having that reference, that
further reference gives, again, ease of understanding and a point to go -- trying to go
through the ordinance sometimes is daunting. Staff works with the ordinances every
single day, but -- and maybe code works with them every single day. But I know
residents don't, and they want a point of reference to be, you know, directed to help
them do the interpretation as well. And I think it's just fair.
CHAIR GRAY: I think your point is valid, but I think the example maybe isn't the best
example. Because the 750 that John's referring to is 24-hour parking limitations.
Whereas Mr. Meyer's example is more about trip generation and customer traffic.
Right? So there's a -- it's a another gap, but your point is is is valid.
VICE CHAIR WATTS: I'm fine with that. But I'd also like either to whatever we do
moving forward, we either change the front end verbiage or we add some additional
verbiage to the zoning districts to Commissioner Kovacevic's point.
CHAIR GRAY: And I think two or three years ago, we did a lot more of that. And John,
tell me I'm wrong here. But I think we started to shy away from that because we were
starting up with circular, inaccurate references, and it was hard to clean up all over the
place, right?
WESLEY: Yes, chair, that's correct. There was a concern with that because when you
make a change one place, you've got to remember all the other places you have to
make the change.
CHAIR GRAY: I don't think this answers what your objective is, but what if we added
language to say, the more stringent shall apply type of language. It's not going to point
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 22 of 44
you to the other section, but it at least allows for the teeth to be used if necessary. I
think your ask is a big ask.
VICE CHAIR WATTS: Well, I think the asks should be asked to Farhad. How hard is that?
Is it a daunting task?
TAVASSOLI: Be difficult. I wouldn't go so far as to say daunting as in time that needs to
be put into it.
VICE CHAIR WATTS: Well, maybe even if we put a footnote on some of these that say,
please consult -- for further clarification, consult the corresponding ordinance. But
something that doesn't just set a trap for the homeowner or for the business. There's a
lot of punitive things that happen here that are detrimental to a business. But there's a
lot of good things that happened here as well. It depends on how you interpret it and
how familiar you are with the ordinances. I think that's the problem, to me, anyway.
DEMPSTER: Yes. I was going to clarify or make a suggestion because you don't know
what you don't know. Reading this I wouldn't know that there may be another piece in
another section, and I understand that it could be daunting to go back and write, you
know, 5-3.2, but maybe instead of the particular code, just note that further rules and
regulations surrounding parking may apply or may require more research.
CHAIR GRAY: Maybe we just need to change the preamble to say the underlying
utilization of this dwelling is a dwelling and dwelling codes, ordinances are applied first.
And this is a layer applied over top of its primary utilization. Right. This is a secondary
use. So you got to first understand the ordinances around living at the dwelling in the
first place. And then you can understand the nuances of operating a business out of it.
VICE CHAIR WATTS: It would certainly help.
TAVASSOLI: And Mr. Chairman if I may provide some context on what I was saying,
sometimes when you refer back and forth between different sections of the ordinance,
as they change over time, sometimes if you were to hyperlink it say in the ordinance and
they would refer back to an ordinance when, for example, one or two other provisions
were added in that section, it might throw some people off, but we need to keep track
of that wherever the changes take place and update those links accordingly.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 23 of 44
CHAIR GRAY: Commissioner?
KOVACEVIC: I also want to revisit the reference to accessory structures. If I'm a CPA
doing tax returns and I want to do them out of my casita, then -- so maybe in March, my
clients that aren't computer savvy want to drop off their tax information. I mean, I think
that's one thing. If I've got a material yard going on in my back yard, and I've got a barn
with all kinds of landscape equipment, and I'm trying to run a landscape business out of
my single-family house, I think that's a whole nother thing. And that's a different
accessory structure, but I think you should be able to -- I think Susan should be able to
work out of her casita if she wants to, as a realtor and and isn't generating a lot of
traffic. How can we get those differences recognized in this ordinance?
CHAIR GRAY: I think you can certainly allow it. But then are you also suggesting to
modify the trip generation limits?
KOVACEVIC: Not necessarily.
CHAIR GRAY: Because it's three, right? Three three trips. Six total. Probably fine for
the accountant, right? It's fine for most professional services.
KOVACEVIC: I would think so. Yeah. I but I just think that a casita, doing office work out
of a casita is a whole different story than manufacturing something out of an accessory
building.
CHAIR GRAY: And we're not going to open it up, in that case, to signage on the casita or
its own -- it's not getting anything special. It's just an accessory. Right?
KOVACEVIC: Right. No signage. It's just -- I mean, it's part of the house, but it's a -- I
mean, the homes have casitas, and a person should be able to choose to work out of
their casita rather than out of a bedroom.
CHAIR GRAY: I'd be fine with it as long as it's limited to dwelling and not the other -- not
the barn or the shed or whatever it's going to be.
KOVACEVIC: I agree. I think I may.
WESLEY: Chair, if I may?
CHAIR GRAY: John doesn't agree.
WESLEY: Well, I'm not sure whether I agree or disagree. Just want to, if I may, Chair.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 24 of 44
Typically, we talk about as far as our permitting processes, accessory structures or
accessory buildings. And we have certain parameters on those for location, size,
setbacks, whatever. But what that accessory structure ultimately gets used for is not
something we monitor. Is it a shed? Is it a casita? Is it a whatever, you're storing your
RV in it. We don't necessarily know that long term. Maybe we have some idea up front,
but so right now, from our perspective, it sounds like we would be allowing an accessory
structure to be used for office-type activities.
CHAIR GRAY: I think that's fair enough.
KOVACEVIC: Yeah, I would agree with that. I think they should be used for office-type
activities and the restriction in manufacturing or equipment intense service.
WESLEY: Nonstorage.
KOVACEVIC: Right.
CHAIR GRAY: What about hair salons?
KOVACEVIC: I think a hair salon would be hard pressed to survive six vehicle trips a day.
VICE CHAIR WATTS: I think, also, most casitas don't have driveways to them. Which is
somewhat indicative of professional services, or they're in the driveway of the primary
residence.
CHAIR GRAY: Accessory structures.
VICE CHAIR WATTS: The accessory structure issue, yes.
CHAIR GRAY: Commissioner. Any objection to extending to accessory structures? So
long as we keep the trip limitations in place. Another reference for Commissioner VICE
CHAIR WATTS to look up.
VICE CHAIR WATTS: Yeah, thanks.
CHAIR GRAY: Okay. Just want to call the discussion and start talking about motions?
Any proposed motions from the Commission?
WESLEY: Chair, if I may?
CHAIR GRAY: Of course.
WESLEY: So here's at least some of the things that I think I've heard that would go into a
motion for approval. One would be that in that introductory statement at the start of
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 25 of 44
5.14 that would be amended to clearly state it applies to any dwelling unit in any zoning
district. That we would amend A to provide for use of accessory structures to have
office-type home occupations within them. I think that, other than the things I've
already mentioned, is some slight changes to what you received, I think maybe those
would be the two modifications to what you were presented and what we've discussed.
CHAIR GRAY: John, what's the punitive side of -- I mean, we're really saying that the trip
generation is going to be what anchors the rest of this. So what does that look like from
a code enforcement perspective?
WESLEY: Let's see. I don't recall we have anything here that makes it criminal. So it
would be a civil citation. And so 183 of the town code, I think those start at 250 and go
up from there.
CHAIR GRAY: Okay. But one other -- we talked just briefly about it, but the branded
vehicles. Is there any thoughts on carving that out to certainly allow vehicles associated
with the business, but seeing other municipalities say you have to remove your magnet
branding when it's parked in the driveway, that kind of thing?
KOVACEVIC: Well, I think we're allowing residents who work for -- who bring home their
employers' vehicles that are already branded to keep them in their driveway. So I don't
know how you stop the home owner that's operating their business out of their home
from having their business identification on their car in the driveway.
CHAIR GRAY: I just don't like the idea of wrapped trailers and RVs being parked in
driveways for even 24 hours.
KOVACEVIC: But does this allow that?
CHAIR GRAY: Yeah.
KOVACEVIC: The trailers?
CHAIR GRAY: Well, you can leave a trailer parked for up to three days, I think anywhere.
Then you have to move it six inches, and it can sit there.
KOVACEVIC: But is that addressed in this ordinance?
CHAIR GRAY: No, it's in Commissioner VICE CHAIR WATTS' other references.
KOVACEVIC: Should it be addressed here?
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 26 of 44
CHAIR GRAY: I don't know. I think it probably should be addressed more holistically
elsewhere in the other ordinance. So maybe that's a takeaway later on in the agenda
here, but.
VICE CHAIR WATTS: I think you got to put it back in the parking ordinances.
CHAIR GRAY: Yeah.
VICE CHAIR WATTS: You got a lot of vehicles, even on Fountain Hills Boulevard, that
already have wrapped vehicles. They have signage. You get it on Saguaro, you get it all
over the place.
CHAIR GRAY: Yeah.
VICE CHAIR WATTS: And so it's primarily in commercial areas, but there's a lot in
residential areas as well, and I don't -- it's an overnight thing for the most part. And
HOAs really are strict on that. Much more so.
DEMPSTER: Yes.
VICE CHAIR WATTS: So do we really want to get involved in that? Not in this particular
document, but in a parking ordinance, maybe, in the future once we have more data.
Maybe.
DEMPSTER: Can we allow it?
VICE CHAIR WATTS: It's esthetics only on the property. So no. I mean, we don't get
involved in that. We would defer to parking code here.
CHAIR GRAY: Okay. So John's got 5.14, to modify the preamble and then modification
to A to allow accessory structure. Any others? I think we want to put an emphasis on
the hard cap on trip generation as this goes forward to council.
KOVACEVIC: Then the zoning categories.
CHAIR GRAY: That would be in the 5.14.
KOVACEVIC: Okay.
CHAIR GRAY: Right. Accessories is A, right, John.
WESLEY: Yeah.
CHAIR GRAY: And Commissioner Dapaah, Commissioner Corey?
COREY: No comments. I'm in agreement.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 27 of 44
DAPAAH: I'm in total agreement too, Chairman.
CHAIR GRAY: Commissioner Dempster?
DEMPSTER: What about the pet dog thing. I mean, do we have other exclusions or
would this be the only exclusion kind of pointed out? Do we want to take that out and
just leave our cap of four pets?
KOVACEVIC: That's what I would think is that you'd leave it. Rather than specify it. I
mean, there's a cap at four pets, and enforce that.
CHAIR GRAY: John, is there a way to bifurcate between Commissioner Kovacevic's
example of a neighbor watching a dog for a weekend versus somebody who's running a
daycare -- pet daycare business out of the home?
WESLEY: Chair, I don't know how we would do it, specifically in the code. I'd have to
think about that a little longer. But I can only go back, I think, to what we've already
talked about, that the person doing it occasionally for a neighbor, they're not trying to
operate a home occupation, they're not getting a business license and all those things
that would go in to this. And they do it for a weekend now and then, even if there were
some type of complaint by the time we would learn about it and investigate, it probably
already be over, so it wouldn't be really an opportunity to try and enforce something
like that.
KOVACEVIC: Did the person who was running this doggie daycare center get a business
license?
WESLEY: No. They never quite did. They talked about getting it like they were
supposed to.
KOVACEVIC: Well, that's kind of my point. I mean, a lot of these home businesses,
people don't get business licenses anyway. But there are ordinances in place that can
be enforced without calling them out in the home business. Because how are you going
to know? You're going to know by trip generation is one way. You're going to know by
dogs barking in the yard. That's another one.
WESLEY: Right.
KOVACEVIC: But they aren't necessarily --
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 28 of 44
WESLEY: We'll find out by their advertising.
KOVACEVIC: Right, by the advertising, but they aren't necessarily going to get business
licenses.
CHAIR GRAY: So what's the consensus amongst the commission? Remove it? So we're
looking for a carve-out to allow up to four animals.
KOVACEVIC: I don't think we need to say anything. We've got the restrictions on
activities of a home -- the physical activity around a home business with the trip
generation. And there's already an ordinance with a maximum of four animals in a
dwelling. So we don't need to say anything about it. Enforce the ordinance we already
have.
VICE CHAIR WATTS: I think in addition to that you've got that it's -- if the home is
operating in -- it's consistent with the neighborhood, doing a friend -- a favor for a friend
is consistent with neighbors.
CHAIR GRAY: That's not four -- that's not four animals, though. That's where I have a
little bit of heartburn with the removal.
VICE CHAIR WATTS: Well, I still would argue that it's it's not consistent with the
neighborhood if you have a business that boards animals and we have another
ordinance that supports that. So I think taking it out works.
CHAIR GRAY: But you don't have another ordinance that supports that.
VICE CHAIR WATTS: We do. The four. The maximum of four. By taking this particular --
CHAIR GRAY: So you're my neighbor and I board animals 360 days a year, and you're
good with that? Not my animals. I'm boarding four animals. I've got a rolling cadence
of animals coming in.
VICE CHAIR WATTS: What kind?
CHAIR GRAY: The worst kind you can imagine. I mean, that's my -- I'm really indifferent,
but I just -- I don't think you should be boarding in animals in a residential district.
That's what I think.
KOVACEVIC: As your neighbor, do I have recourse if they're in your backyard barking?
CHAIR GRAY: No.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 29 of 44
DEMPSTER: Even if there's only four.
CHAIR GRAY: I don't think so.
KOVACEVIC: Then let's leave it in.
CHAIR GRAY: No.
WESLEY: Chair, we do have separate ordinance about dog barking. It's a bit of a
challenge too sometimes to enforce, but there are ordinances about that. Disturbing
the peace.
CHAIR GRAY: But I'm just boarding. You can't come take an animal that I'm boarding on
someone else's behalf. I'm fine to take it out. I just --
DEMPSTER: (Indiscernible) having that business period.
CHAIR GRAY: Well, I just think that that having that business becomes potentially
detrimental to a neighborhood. So I think there's places to board animals in commercial
districts all over the place. I just don't think they probably belong in residential districts.
That's my thought. But I'm not going to hold it up for that. I mean, four new dogs a day,
every day.
DEMPSTER: Yeah.
CHAIR GRAY: And I even like dogs.
DEMPSTER: I do too.
CHAIR GRAY: It doesn't sound like it. I do like dogs. Just don't like other people's dogs.
All right. Well, I guess I would suggest let's just pull that language out to Commissioner
Kovacsevic's thoughts there. And then maybe John, in the council conversation, that
can come up or it can't. I'm indifferent. So I think the motion on the table is --
VICE CHAIR WATTS: One last thing. And John, you are going to look at the height
concern, whether it be an RV or a Peterbilt tractor trailer, at least?
WESLEY: Yeah. We can see -- was trying to look otherwise about the storage of
commercial vehicles. And we talk about the length. It's nothing that's ever been in the
code about the height.
VICE CHAIR WATTS: I think I hear more and more --
WESLEY: (Indiscernible) come up with what the height would be.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 30 of 44
VICE CHAIR WATTS: I hear more and more complaints about the visibility of RVs, in
particular behind the six-foot fence. And some are pretty exotic, and they just don't fit
in the neighborhood. They're contrasting colors to the desert muted colors that we're
looking for as a community. So there are some legitimate concerns. And when you've
got something in there that is pretty tall, and I don't know how to define tall at this
point, so I'm asking for you at least to consider it.
WESLEY: Right. Well, it sounds like the issue, if it's the RVs being parked in people's side
yards behind a six-foot wall and being very much taller than that six-foot wall, it sounds
like that's a different topic than a commercial vehicle in the driveway.
CHAIR GRAY: It's another one for our parking ordinance.
VICE CHAIR WATTS: It probably is, right. Yeah, but some commercial vehicles, some of
these vans are --
CHAIR GRAY: They're getting there.
VICE CHAIR WATTS: They're getting there. Right.
CHAIR GRAY: Twelve, twelve-six.
VICE CHAIR WATTS: Yeah.
CHAIR GRAY: Okay. So crafting a motion, recrafting a motion, motion is
recommendation to approve with the following modifications. So modification to 5.14,
adjusting the preamble to, essentially, stipulate any dwelling unit of any type.
Modification to A, to allow for, I'll say professional service uses in accessory structures.
Emphasis on a hard cap on the trip count generation and removal of the language
excluding animal boarding as we default to other ordinance sections.
Any others to add? Good. There a second commissioners?
KOVACEVIC: I'll second it.
CHAIR GRAY: Okay. Motion's on the table. Seconded by Commissioner Kovacevic. Let's
just do a roll call.
WOODWARD: Commissioner Corey?
COREY: Aye.
WOODWARD: Commissioner Dapaah?
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 31 of 44
DAPAAH: Aye.
WOODWARD: Commissioner Dempster?
DEMPSTER: Aye.
WOODWARD: Commissioner Kovacevic?
KOVACEVIC: Aye.
WOODWARD: Commissioner Schlossberg?
SCHLOSSBERG: Aye.
WOODWARD: Vice Chair Watts?
VICE CHAIR WATTS: Aye.
WOODWARD: Chair Gray?
CHAIR GRAY: Aye.
WOODWARD: Seven zero.
CHAIR GRAY: Thank you, Paula.
CHAIR GRAY: Okay. Number 6, ordinance section 5.13 community residences to
provide for re-inspection of homes for compliance with ordinance requirements.
WESLEY: Okay. Chair, hopefully, Farhad's got this one up, and background slide. The
council's requested that staff make this modification to our community residents
ordinance to allow for some other inspections of community residents. Current
regulations were approved about two years ago, in May. The goal is to provide some
increased oversight. Currently, we only have one home to which these regulations
would apply or this change would apply.
And so moving to the next slide we've got two places that we're proposing to add some
language to provide for additional inspections. The first one is under the registration
section number two, to add a new sentence. The follow-up inspections may be
conducted on a reasonable belief of noncompliance. We've had one comment from a
citizen asking what reasonable belief is, and thinking that might be a little bit vague. We
could look at something to try to tie that down, but I -- our attorneys are satisfied with
this language. And if we do anything to try to define it, we're sure to leave something
out that we wish we would have included. And so we think again, giving us kind of a
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 32 of 44
broad opportunity say an inspection is needed because we think there's something
going on that doesn't meet the codes that works.
And then the second one is under the reregistration provision. So number six on the list
about reregistration to make a slight change there to the re-inspection piece. And
clarify all the things we can look for in a re-inspection on the annual basis and to include
the occupancy limits. That was kind of the one thing that was missing from the previous
list. So those are the two proposed changes.
CHAIR GRAY: Commissioners, any discussion? Commissioner VICE CHAIR WATTS?
VICE CHAIR WATTS: Why does it say if applicable, on 6-B? Isn't it required?
WESLEY: 6-B. So an individual home does not require a license, a business license. A
business does. So if they operate more than one, they only need one license. So a given
home may not need a license if they don't have one.
VICE CHAIR WATTS: That's confusing. Can you give me an example of how that would
work or home and/or an operator?
WESLEY: So ABC assisted living home provider for seniors. And as a business, I operate
three, four different homes in Fountain Hills. I need one business license for my
business, but I don't need one for each home.
VICE CHAIR WATTS: That seems like something that we should --because any business
that has multiple branches works on its own basic budget and finances. Shouldn't they
each be required to have a license to operate?
WESLEY: We went through this discussion when we updated the code a couple of years
ago. And because the homes are homes, they're not businesses, that's why we ended
up where we're at. The business has a business license. The business happens to be
providing homes for people.
CHAIR GRAY: The other criteria pick up.
VICE CHAIR WATTS: The other criteria is what?
CHAIR GRAY: Well the other criteria, in C-1, 2, and 3. Or C-1 and 2, pick up. The
reasons to inspect. I mean, you're going to know if a home or business has a license,
that can be pulled remotely. This is all about physical presentation of a code
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 33 of 44
enforcement officer at a property. Right? So I think B is rather benign in the grand
scheme of things.
VICE CHAIR WATTS: How does the Code enforcement officer know which location holds
the permit? The business license.
WESLEY: They can find out if the business has a license or not.
CHAIR GRAY: His question is a little different, John. His question is, if there's one
business license operating two homes or three homes, how do you know the physical
address is associated with the business licenses?
WESLEY: When they would get their registration for the home that's one of the things
that they would have to document is what business license they have. If they're a single
entity, they would need a business license for that. If they're part of a larger entity,
then they would demonstrate that they have the business license as that larger entity.
CHAIR GRAY: So each home still carries its own registration?
WESLEY: Correct.
CHAIR GRAY: We're fine. I mean --
VICE CHAIR WATTS: I think it's --
CHAIR GRAY: Clinically, it's done the same way. They operate under one clinical license.
VICE CHAIR WATTS: I think that's something you ought to be revisited, because I think
there's another component of insurance and that sort of thing. Do we have all the
insurances on all of the properties that are under that particular license? So I think
there's more to the story. I'll leave it go for now, but I think we ought to visit at some
point in the future.
CHAIR GRAY: I think one -- two years ago we we did have insurance language in, and
then it was stripped out as it swam upstream, right?
VICE CHAIR WATTS: Yeah, I'm just talking about general business insurance. Not adding
an additional insurer like to the town or not. So yes, but I think that issue is going to
come back up as well. So I think in conjunction when it is reraised by council, they ought
to look at business licenses per location. One restaurant has to have its own license
over here. You don't have multiple restaurants under one license. So for now, if that
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 34 of 44
works, fine. But in the future, I think we ought to consider it.
CHAIR GRAY: What's the semantics of whether or not the home is a business or not.
And in our code application, it's being viewed as a residence, as a part of a business.
VICE CHAIR WATTS: Semantics.
CHAIR GRAY: Paula, we have any speaker cards?
WOODWARD: Yes, Chair, there's two. Larry Meyers is our first speaker, and Crystal
Cavanaugh is the second speaker.
MEYERS: Commissioners, Chair. So the insurance provision was general insurance, and
it was stripped out. And I think it needs to go back in, number one. Number two, I'm
dead set against one blanket license for unknown houses, because in the transitional
section of the community residents, you're not really supposed to know where these
are, and the only way you know where they are is after there's a problem, which there
has been, and we just found out about it because the sheriffs were called there because
there was an assault. And it was a transitional housing. And they don't have a business
license.
So the other part that I would like to see in this is I want to see what are the
ramifications for running a business without a license. It's sort of like back to the other
home business. What if you get caught running a business without a license? $250 is
just not going to cut it when it comes to this stuff, because you've got older folks and
who knows how good the care is for them. And then we all know about the other side
of this and what happens there. I mean, they're not in the Nicholas property anymore
because somebody probably set a fire in there and set off the house sprinklers. Which
didn't have any insurance because we stripped out the insurance program part of it.
And now they moved, and we didn't even know where they moved the people to
because we don't have any inspections. So I get it. You file a complaint, we should be
able to go in there and inspect, but there's no penalties for this. And now, they're not in
the other house that is currently grandfathered and licensed, but now they're
somewhere else, but they haven't applied for a business license.
Oh, I get it. They're blanketed under there one clinical license downtown. Excuse me?
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 35 of 44
Every house for every group home, whether it be community or transitional, should
have its own license, period. And that way they're all registered. The town knows
where they are. And when they get a complaint, they can go take care of the complaint.
And if they're operating without a license, please, they got to pay. That will deter
operating without the license and sort of make it easier on the town because they've
got to enforce it.
And then the other part of this whole thing who -- very quickly. So if you haven't
applied for the town business license, how do we know they're licensed with the state
for that particular location? Where's the chicken? Where's the egg? Who comes first,
Peter or Paul? Those are my questions. And none of them are addressed in here. And
this whole thing is designed to give us -- it says so, more oversight. I don't think we have
it. Thank you.
CAVANAUGH: Crystal Cavanaugh, community resident. Larry stole most of my thunder,
but it doesn't mean I'm not going to repeat some of it. Because actually, this is
occurring right now in my Sun Ridge Canyon community, which is an HOA community.
So you know, some people are thinking we're protected, but we are not protected. And
as I found out, this house on East Sundown, a very nice street, does not have a business
license.
And what I'm also wondering, does our state actually contact communities when one is
applied for at the state level? Because we're always going to be chasing these things as
it is. And I mean all group homes, not just the transitional community, they should have
this vital component of inspection. I was outraged, it was actually stripped out by our
town council in order to actually get the occupancy component through, which was
really important to reduce occupancy in both these types of settings. So some agreed to
do that. And I'm very happy this is back on the table with you guys. Because if you
don't have inspections, how do you ever know what the occupancy is and how do you
know if they're complying with other things?
And the only reason this Sundown location was discovered, our town didn't know about
it. But once again, the sheriffs were called. There was an assault. The neighbors
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 36 of 44
discovered it once again. And so now people are trying to play catch up and see if
there's licensure. So I don't even know if this one's licensed with the state. So what if it
isn't?
So I would love to see some consequences put in to some of our ordinances because
now it'll be like, okay, just apply for a license. I know you didn't, but let's apply, and you
can keep operating. No, they should be disqualified. I know the particular owner of this
property on Sundown owns nine properties in Fountain Hills, and so we may have to be
looking in -- I think she lives in one of them. I don't know what's happening in all the
others, but this stuff really needs to be clamped down on just for the protection of a
surrounding neighborhood. Thanks so much.
CHAIR GRAY: Just two cards, Paula?
WOODWARD: Yes, Chair. But there was a written comment from Liz Gildersleeve that
she was for -- she stated that she was for this particular ordinance.
CHAIR GRAY: Yeah. We received that earlier this week or last week even.
WOODWARD: Yes.
CHAIR GRAY: All right. John, on the registration versus business license. When we
wrote the ordinance up two years ago, it was all about registration of these addresses.
And I mean, I certainly appreciate the chicken or the egg component here, but I'm not
sure I understand why a business license is any more strict from a code enforcement
perspective than registration. So maybe you could touch on that, and then also, I think
we've got a basically a three-strike baseball policy in over the course of a rolling 13 or 14
months in the underlying ordinance. Could we look at failure to register as an automatic
first knock against that?
WESLEY: So Chair. Yes, to your first point. A resident would need both a business
license and to be registered. Both can be followed up on for code enforcement
activities. Probably the business license is actually the easier one of the two to get. It's
less involved, typically with a business license, but they both work together as if we
were to get a request for a business license for a community residence. We would look
as a part of approving that business license, to see if they had the registration, and if
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 37 of 44
they didn't, we would stop that process to get the registration. Or if somebody
registers, we would tell them they also need to get their business license to be
approved. So they work together when somebody is following the process. I
understand, we do have one -- we learned about it last week that has gotten started
over, as Krystal said. And so we are following up on that and going through the
enforcement procedures to get them properly licensed and registered.
And so you're right in F2B, it says property owner, community residents, operates any --
receives any combination of three violations within a 12-month period, they're -- it says
they can be required to vacate the property. So could this be a first one of those?
Possibly. I guess I'd have to think about it a little bit harder. Maybe talk to the attorney.
If you're not even registered yet, can you get a violation? . It seemed like you could --
but anyway, there's a little nuance there we'd have to talk through to make sure we
were on solid ground for that.
CHAIR GRAY: Well, I think that, I mean, the the scenario is generally that everybody
wants to open these residences, these homes, these profit centers, and they look to fly
under the radar until they get their knock. And so yeah, I mean I appreciate the
attorney would want to weigh in on that, but I think that the industry also talks a little
bit too. And if we become a municipality, who's going to take a little harder line there,
then maybe that serves us well longer term.
CHAIRPERSON GRAY: Correct.
CHAIR GRAY: Commissioner Dempster?
DEMPSTER: John, can you clarify? Does the violation go with the business license
applicant, or does it go with the location? Because if they move locations, but it's the
same person owns multiple houses. I mean, who --
WESLEY: Right.
DEMPSTER: How do you -- how is that calculated?
WESLEY: So again, Chair and Commissioner, in B, it says property owner or community
residence operator. So we could go after either one or both.
DEMPSTER: So if they move the location, it doesn't start back to zero?
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 38 of 44
WESLEY: Correct?
DEMPSTER: Right. Okay. Thank you.
WESLEY: Or if a property owner moves them from one of their properties to another
property, it's still the same property owner.
CHAIR GRAY: Vice Chair Watts?
VICE CHAIR WATTS: I think B should say each home or operator. And I understand what
you said about our council advising that we're making this as aggressive as we can. But I
would let it up to town council to say whether or not. But I think each home should
have a business license, just like every business branch or franchise, they all have their
own business licenses. So that's that's one thing. And I think I'd recommend to council,
again, to revisit the insurance issue because I think there's a lot to be missed by not
having insurance. But at this point, John, can we change the home or operator to each
home and/or operator has maintained a current town business license?
WESLEY: Let's see here.
CHAIR GRAY: What do we stand to gain by doing that?
VICE CHAIR WATTS: Accountability. Now I know where they're at. If nothing else, I've
got a little bit of revenue to pay for the code enforcement people. I can track them.
WESLEY: Let's see here. So unfortunately, I'm not where I can look at this as much as I
would like. We could potentially do that. It wasn't what we were asked to work on. I
can't remember and I can't get to it right now, unfortunately, how specific I was in my
public notice to see if we can get off into other sections of the code.
CHAIR GRAY: Is that synonymous with the agenda language, John?
WESLEY: It should be pretty close.
CHAIR GRAY: It only references 5.13 community residences to provide for re-inspection
of homes for compliance with ordinance requirements. It's pretty stringent.
WESLEY: Yeah. That's what I thought. So that would require new notice for that
additional language.
VICE CHAIR WATTS: So what you're saying is that it would have to be changed in the --
that 5.13 community residents in the ordinance itself, before we could address it on 6-B.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 39 of 44
CHAIR GRAY: To get it in, you would have to continue tonight and then re-notice for
March.
VICE CHAIR WATTS: Okay.
CHAIR GRAY: So my only reservation, to play devil's advocate, is we're in a scenario
where the closer we push to the line, eventually it's going to push someone to push
back, right? And so are we getting enough juice for the squeeze of wanting to add a
business license in on top? Because you're dealing with organizations that, one, claim to
be residences, right? And two, by and large, don't file with the state because they think
they can get away with it and collect revenue for X number of months before they
finally get picked up. They don't file their municipal home registrations. So why are
they going to go file for a town business license? That's my reservation.
So if we push that and we push this over the line to where we're saying we know you
say you're a residence, but we're going to push you to be a business, that to me, is
where we crossed into another arena to where someone can bat back at us.
I think if you want to do it, you got to go back to the mountains of research we did a
couple of years ago and say, okay, there's two paths here. There's the path where the
residences are a part of a business. Right? Which is by and large what we normally see.
And then there's all of the scenarios out there that end up in court. And those are the --
What's it called, John? The Harbor House model. Something like -- Oxford. Oxford
House model.
WESLEY: Yeah. Oxford. Yeah.
CHAIR GRAY: Which is basically a self-certifying self-chartered group of residents who
band together as a family and live together, not as a part of any business model. It's just
a cohabitation relationship. So if you're going to do it, you've got to carve-out to say if
you are self-certifying, self-chartering your residence, you do not require a business
license because that's where you tip that scale.
VICE CHAIR WATTS: I think any business that charges, that makes money, that has a
revenue stream should have a business license. And exclusive of just these -- these
types of homes. That home by its design has income. They charge for the residence. So
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 40 of 44
aside from aside from the harbor.
CHAIR GRAY: I agree with you. Most of the time that's going to be a true statement.
VICE CHAIR WATTS: Okay. So why shouldn't they have a business license, and why
shouldn't we have some degree of accountability?
CHAIR GRAY: Because you're collect -- well, they're service industries so you're not
collecting tax revenue. Theoretically, let's say you were, you would collect that, they
would report out under the parent business license. Same scenario as having a fleet of
vehicles, a fleet of busses, that you operate as a tour company. Each bus doesn't have
its own business license. The tour company has a business license. I'm with you. But
we've got to be really careful.
VICE CHAIR WATTS: In a consolidated financial statement, you're going to account for
each of the branches, and then you roll them up to the parent. That's true. But you're
also going to remit to the municipality that collected sales tax. So we don't get
anything. Why shouldn't they have a business license at least? It's a cost of doing
business.
WESLEY: They do have a business license.
VICE CHAIR WATTS: Each home?
CHAIR GRAY: What's the difference in the cost of a business license versus our cost of
registration?
WESLEY: Business license is $50. Registration, I don't recall what --
CHAIR GRAY: It's like 500. Wasn't it?
WESLEY: Business license?
CHAIR GRAY: No. I thought the registration license was closer -- I thought it was about
500 bucks.
WESLEY: Let's see here if I could get to that.
VICE CHAIR WATTS: Do we charge the same thing for a single business license as
opposed to multiple addresses? You were going under your theory of saying, okay, you
have one license, but multiple listings underneath that license, multiple branches. Or do
you have incremental increases?
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 41 of 44
CHAIR GRAY: So I would say the answer is, no. Because if I have --
WOODWARD: Chair. Excuse me. I found the pricing for the community residence
registration is 350, and then the annual renewal is 250.
CHAIR GRAY: And that's per address. But I think the answer to your question is no.
Because if I have two Subways, under my Subway holding company, the two Subways
are treated independently. So I lose the argument on that accord. But what you have
to remember here is these are, by and large, considered residential use as their
underlying use of the physical address, even though we disagree with that.
VICE CHAIR WATTS: I'd still ask John to talk to council about each home and/or operator
has maintained a current business license and see if we get any traction there. And at a
minimum, we're eventually going to get to suggestions by commissions for future work.
So take note.
CHAIR GRAY: So if you would like to see that under B, then we need to make a motion
to continue this tonight. Is there any pressing reason, John, that this could not be
continued for 30 days?
WESLEY: Not really, thinking about a calendar. You know, council asked us to work on
this, and I think they're anxious to see it come back. But as noted earlier, there's only
one home currently that would be subject to this, and I believe their renewal will be in
June. And so it won't impact that at this point.
CHAIR GRAY: The other. So if we go down the continuance path, John, the other thing
that I'd like to work the language in is, I'd like to make sure that the inspections are are
not announced or scheduled. Right?
WESLEY: Okay. Certainly the initial inspection that's done is announced because we
coordinate that. And with the reregistration, there'd be at least some level of
understanding what's coming up because they're going through the reregistration
process. If it's the new one being added for we think there's some causes of an issue.
Now, the inspector would show up at the door and knock on it and -- and you know, it's
unlikely to try to schedule it. Unless he's never able to find anybody home and
ultimately had to call somebody.
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 42 of 44
CHAIR GRAY: I mean, obviously, it becomes fairly self-fulfilling or satisfying, whatever
the words are, if we're scheduling the inspections, I'm going to set the home up to meet
your inspection criteria. I would think. So I think that we need to add a component in
here that -- I mean let's be upfront and transparent with it. You're going to get
inspected on the front and you're going to get inspected at the re-up interval. And then
there's a reservation of right. I think this is exactly how we worded it the first time.
There's a reservation of right to inspect on the basis of ordinance conformance or
ordinance violation. And that can be effectively unannounced. You certify as an
operator with your residence registration that you provision for unannounced
inspections.
WESLEY: Chair, it would seem that in the language proposed for number 2. Farhad, can
go back to that slide. So the follow-up inspections may be conducted upon a reasonable
belief of noncompliance, it would be pretty easy to work in unannounced in that
sentence.
CHAIR GRAY: Yeah. I think that's the operative word there for that to have value.
VICE CHAIR WATTS: I agree with that.
CHAIR GRAY: So John, if you have no reservation --
DEMPSTER: Well, just with that, how long? Do you need time frames on when they can
correct the deficiencies or is that in another section?
WESLEY: We don't have that covered here. That would just be typical part of the code
enforcement process given them -- depending on what the violation was, giving them
reasonable time to correct, whether that's a day or a week or whatever it may be,
depending upon the violation.
DEMPSTER: Okay.
WESLEY: And so Chair, coming back to your comment about making further changes. I
was given direction from council to do this. If the commission wants to do something
more, I would need clear direction about what all that is to bring back.
CHAIR GRAY: Well, is the council looking for us to stamp this and send it back to them,
or were they seeking input from the commission?
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 43 of 44
WESLEY: Well, they were seeking input from the commission on this issue of
inspections. They weren't seeking input on other changes to the code.
CHAIR GRAY: Commissioner VICE CHAIR WATTS, this is your call, sir.
VICE CHAIR WATTS: They asked for input on -- they didn't limit our input. If they had
said only on these things, then the onus would be on them. They asked us to look at
these and make our recommendations, and I would stick with that each home and/or
operator. I'm going to stick there.
CHAIR GRAY: Make a motion to continue, then.
VICE CHAIR WATTS: Do we have any more discussion? Any? No. Okay. With that then
I move to continue this to the next scheduled commission meeting.
CHAIR GRAY: John, are you able to pull the discussion from the verbatims, or do you
want us to outline them quickly?
WESLEY: Oh, even better, I'll rewatch the meeting.
KOVACEVIC: I'll second the motion.
CHAIR GRAY: Okay. Motion on the table to continue to the next regular zoning
meeting, which would be roughly March --
WOODWARD: --11th.
CHARIMAN GRAY: -- 11th, 2024. Seconded by Commissioner Kovacevic. All in favor?
IN UNISON: Aye.
WOODWARD: Seven-zero.
CHAIR GRAY: Thank you, Paula. All right. Number 7, Commission discussion or request
to staff. Commissioner VICE CHAIR WATTS.
VICE CHAIR WATTS: Not at this time.
CHAIR GRAY: All right. John, anything from you under requests from development
services?
WESLEY: No. Not specifically.
CHAIR GRAY: Okay.
VICE CHAIR WATTS: We got two more hours.
CHAIR GRAY: Yeah. I know. Agenda item 9 report. I assume that 9, John, is just a
TOWN OF FOUNTAIN HILLS
FEBRUARY 12, 2024 PLANNING AND ZONING COMMISSION MEETING MINUTES
Page 44 of 44
stipulation in the front end of the code, which is why it has to be in there. We always
seem --
WESLEY: Yeah. I'm not sure why. Yeah. We could probably look back at that someday
and maybe redo that last piece of the agenda. But it's been that way forever. Okay.
CHAIR GRAY: All right. We're adjourned. Thank you, thank you.
ITEM 5.
TOWN OF FOUNTAIN HILLS
STAFF REPORT
Meeting Date: 03/11/2024 Meeting Type: Planning and Zoning Commission
Agenda Type: Submitting Department: Development Services
Prepared by: John Wesley, Development Services Director
Staff Contact Information: John Wesley, Development Services Director
Request to Planning and Zoning Commission (Agenda Language): REVIEW, DISCUSS, AND
PROVIDE COMMENTS: Possible amendments to Chapter 17, Wireless Telecommunication Towers and
Antenna
Staff Summary (Background)
Based on comments and input from citizens, the Council has directed staff to look into and propose
amendments to our current regulations for wireless communication services in Town. Currently, Town
Code divides the regulations into two areas: Town Code Article 16-2 for Small Wireless in the ROW;
Chapter 17 for all other wireless communication towers and antenna.
As previously discussed, state statutes preempt the Town's ability to regulate wireless communication
facilities in the right-of-way which meet the definition of a Small Wireless Facility. As provided in state
statutes, a Small Wireless Facility is defined as:
"Small wireless facility" means a wireless facility that meets both of the following qualifications:
(a) All antennas are located inside an enclosure of not more than six cubic feet in volume or, in
the case of an antenna that has exposed elements, the antenna and all of the antenna's exposed
elements could fit within an imaginary enclosure of not more than six cubic feet in volume.
(b) All other wireless equipment associated with the facility is cumulatively not more than
twenty-eight cubic feet in volume, or fifty cubic feet in volume if the equipment was ground
mounted before August 9, 2017. The following types of associated ancillary equipment are not
included in the calculation of equipment volume pursuant to this subdivision:
(i) An electric meter.
(ii) Concealment elements.
(iii) A telecommunications demarcation box.
(iv) Grounding equipment.
(v) A power transfer switch.
(vi) A cutoff switch.
(vii) Vertical cable runs for the connection of power and other services.
Wireless communication facilities that meet this definition and do not exceed the height requirements
(40 or 50 feet depending on the circumstances) are exempt from any zoning requirements. In our code,
the regulations for small wireless facilities are in Town Code Chapter 16, Streets, because this section
the regulations for small wireless facilities are in Town Code Chapter 16, Streets, because this section
addresses activities within the Town's rights-of-way. Standards for these facilities are primarily applied
through the lease agreement with the Town for use of our ROW. At this time, no changes are being
proposed regarding small cell wireless facilities.
Chapter 17 of the Zoning Ordinance addresses all other towers and antennas used for wireless
communication. This includes all types of towers and antennas used to transmit either voice or data, or
both. Some challenges with the current ordinance include:
Has not kept up with all uses of wireless technology;
Does not have clear application to non-personal wireless communication facilities;
Not up to date with latest rulings regarding modifications;
Does not clearly describe tolling of shot clocks; and
Does not provide for ongoing regulation of RF radiation.
There was some discussion at the previous Planning and Zoning Commission meeting regarding the
desire to try and regulate broadband versus personal communication (voice) antennas or signals. It was
stated at the meeting that regulations from the Federal government specifically target personal
communication and leave more latitude to regulate broadband; therefore, there was interest expressed
in the meeting to focus on broadband. Following the Commission discussion, staff reviewed the
direction given by the Town Council regarding how to proceed. The Council's direction was specific and
did not include trying to address broadband versus cellular communication or hiring any additional
consultants. Based on the direction received, the draft ordinance modifications address towers and
antennas, not what "G" it is or whether the antennas are used for broadband or not.
Review of Draft Ordinance
To prepare the attached draft ordinance, staff reviewed the current ordinance, the concerns expressed
by citizens, ordinances from other communities (including Farragut, TN and Davis, CA), and the draft
submitted by the consultant retained by the Town Council. The attached draft ordinance is a
compilation of recommended changes based on each of these sources.
Existing Section 17.01 Purpose
Changed to 17.01 Purpose, Intent, and Applicability
Changes to this section include:
Braking out the purpose statements in the first paragraph to make them easier to read.
Adding a new Intent section to further define the Town's interest and concerns regarding wireless
communications. This section provides a balancing test that can be used when evaluating
individual applications.
Moving what was Section 17.03 up to this introductory section. Two items were added to the list
of exceptions, Small Cell Towers in the right-of-way and mobile or temporary wireless facilities
(sometimes referred to as Cell on Wheels - COW).
Existing Section 17.02 Definitions - not changed
This section has stayed the same except for adding three new definitions at the end.
The current code addresses all types of antennas, but the existing rules are particularly directed
toward typical cell towers. We are increasingly finding other types of towers, such as the ones
attached to SRP utility boxes or placed on water towers that allow for communication within the
utility system. There is a need to provide some regulations for these types of antennas, but not to
utility system. There is a need to provide some regulations for these types of antennas, but not to
the same level as the typical cell tower. Therefore, a new term was created and used in the
ordinance to carve out this type of antenna.
The current code does not define wireless communication. This is pretty straight forward, but
staff felt it may be beneficial to have this definition given all the confusion about what is being
regulated in the discussions thus far.
Also added is a definition of wireless facility to better describe what all is meant when using the
term.
Existing Section 17.03 Applicability
The existing applicability section was moved to 17.01 C. This section was reused for basic requirements
of the code.
Existing Section 17.04 General Requirements
Changed to Section 17.03 Requirements
A. General Requirements. This section is mostly the same as the current Section 17.04 with
reformatting based on the new structure. The following changes were made:
What was 17.04 C, Inventory of Existing Sites, has been moved to the new 17.05 A 3.
The section on Aesthetic (was 17.04 D, now 17.03 A 3) has been expanded based on
language found in other codes. The last provision, j., Utility Services Antennas, has
been added as described above to address these types of antennas.
What was Sections 17.04 F and G have been moved to Section 17.06, Maintenance
and Operations, as B and C.
What was 17.04 K, Public Notice, has been removed because the notice
requirements are being handled differently, as will be explained in the new Section
17.05 D.
What was 17.04 M., Buildings and Support Equipment, has been removed as
unnecessary with the language that was in Section 17.08, now moved to 17.03 C.
A new Section 17.03 A 13, Noise, has been added to address concerns about
possible noise issues from the equipment associated with wireless communication
facilities. As will be discussed in more detail later, this replaces what is currently in
Section 17.06 B 2.
What are now Sections 17.03 14 and 15 were 17.06 A 4 and 6 with slight word
changes to fit the new format.
B. Minimum Setbacks and Separations. This is Section 17.07 in the current ordinance. Staff has
not proposed any changes to this section, just moved the location.
C. Buildings or Other Equipment Storage. This is Section 17.08 in the current ordinance. The only
change made in this section was in 2. a. i. where the language was changed from "three and
one-half (3.5) feet in height or twenty (20) square feet" to "and." The Town Engineer was
concerned the current language could allow a rather tall structure in the setback area that could
block visibility along a street. Other Town regulations prohibit wall taller than 3.5 feet in the
setback area.
D. Co-location. This is Section 17.09 in the current ordinance. The only change in this section was
D. Co-location. This is Section 17.09 in the current ordinance. The only change in this section was
the addition of what is now D. 1. to require new towers to be designed to accommodate future
co-location.
Existing Section 17.05 Permitted Uses
Changed to Section 17.04 Application Types
This section was significantly re-worked, but the basic concept is the same. A tower in a
residential district or within 300' of a residential district requires Council approval, all others can
be approved administratively. This could be changed to increase the distance from residential
areas that requires Council review, or require all towers to receive Council review. There has
been a desire to establish some kind of hierarchy for where towers will go. If all towers require
Council approval, there is no incentive to look for a non-residential location. Therefore,
staff left the basic requirements the same.
A shortcoming of the current ordinance is the lack of direction on modifications to existing
towers and the replacement or modification of antennas. This section now describes all the
types of applications which can be received that would be considered and reviewed
administratively versus those that require public review. Sections A. 2. and 4. include criteria
that are used to determine if a modification is significant enough to require Council review.
These criteria are taken directly from the consultant's draft ordinance.
Existing Section 17.06 Special Use Permits
Changed to Section 17.05 Application Submittal, Review, and Processing
The current ordinance provides limited direction on the submittal requirements, review, and
processing for all types of towers and antenna. The current section is set up to just describe
what is needed for an application that requires review as a Special Use Permit. This section
now also provides information regarding shot clocks and tolling of application review.
A. Provides an overview of general application requirements. Those submittal requirements
include:
1.Completing an application. The language used is the same as what has been used in the
changes to Chapter 2 for other types of applications.
2. This is a simple reference to the items listed in Section 17.03 A that need to be addressed
in an application.
3. This provision is currently in Section 17.04 C and has been relocated to this section of the
ordinance. A slight change has been made to require the existing inventory only with new
towers or additional antenna being co-located on an existing tower. This is not needed for
the simple modification of existing antenna.
Former 2, moved to 17.05 D 1.
Former 3, moved to 17.05 C 4 with slight changes in wording to fit the current format.
Former 4, moved to 17.03 A 14.
Former 5, requirement handled in alternate language.
Former 6, moved to 17.03 A 15.
4. Utility Service Antennas. This is a new section added to give direction on how staff
processes these types of antenna.
5. Applications Using Existing Towers. This section provides the minimum information
required on an application modify antenna on an existing tower.
6. Is 17.06 B in the current ordinance. Has been kept mostly the same but now requires
photo simulations of the tower to help review the impacts.
7. Filing Fee. This is standard language for paying the required application fee.
Former B. 2. Noise. This wording did not work well. Language was added to Section 17.03
A 13 establishing the requirement to submit information addressing noise and to 17.06 D
regarding ongoing compliance with noise regulations.
B. Covers the required "shot clocks" and tolling of applications. Federal regulations place time
limits (shot clocks) on local communities for the processing of applications. The time runs while
the application is in the hands of the local jurisdiction and is stopped, or tolled, when the
application has been sent back to the applicant for additional information, corrections, or
revisions. One of the concerns staff has heard in regard to our current ordinance is that it does
not have any provisions outlining how these are handled. This section is entirely new to the
Town's ordinance. The 30, 90, and 150 day review times are consistent with Federal requirements.
C. Provides the review and processing requirements for both types of applications.
1. Provides review standards for all application types. The standards listed are a
combination of what was 17.06 B 3 and language found in other codes.
2. Provides the process for administrative review. This is the same as any building permit
application review. A section was added for temporary, mobile towers that will be in place
for more than 7 consecutive days.
3. Provides the process for public review applications. Public review applications will use
the same notice, processing and approval requirements for SUP as contained in Section
2.02 of the Zoning Ordinance. This clears up a current issue with cell towers on Town
property that need Council approval, but there is no process for review provided. The
review criteria that were in Section 17.06 B 3 have been moved to 17.05 C 2 as described
above. For new towers that can be approved administratively, the this section references
the information required in the following section, 17.05 C 4, regarding application
requirements.
4. Is the same as the current ordinance Section 17.06 B 4, with a few modifications to fit the
current format. Also a new provision as added to the end of this section.
Existing Section 17.07 Minimum Setbacks and Separation - moved to the new Section 17.03 B.
Existing Section 17.08 Buildings or Other Equipment Storage - moved to the new Section 17.03 C.
Existing Section 17.09 Co-Location - moved to the new Section 17.03 D.
Existing Section 17.10 Removal of Abandoned Antennas and Towers
Changed to Section 17.06 Maintenance and Operations
A. Removal of Abandoned Antennas and Towers is the same as the current Section 17.10.
B. State and Federal Requirements. The first paragraph was Section 17.04 F. The remainder of this
section has been added to address concerns about the ongoing compliance with RF radiation
limits.
C. Building Code; Safety Standards is the same as the current Section 17.04 G.
D. Noise. This section has been added in conjunction with the language in Section 17.03 A 13.
This section provides an ongoing ability to enforce noise limits.
Existing Section 17.11 Nonconforming Uses.
Changed to Section 17.07 Nonconforming Uses and kep the same except for updating
references.
Related Ordinance, Policy or Guiding Principle
Zoning Ordinance Chapter 17
Risk Analysis
N/A
Recommendation(s) by Board(s) or Commission(s)
N/A
Staff Recommendation(s)
While staff supports the changes contained in the draft ordinance and described in this report, staff
does not have a recommendation at this time. Staff is seeking further comment and discussion by the
public and Commission in preparation for a public hearing to be held at the Commission's April meeting.
SUGGESTED MOTION
This text amendment has not yet been noticed for public hearing, so no action can be taken other than
direction to staff. No motions will be made.
Attachments
Revised Ordinance Outline
Draft Strikethrough Revised Chapter 17
Draft Revised Chapter 17, no strikethrough
Existing Ordinance, Chapter 17
Revised Chapter 17 Wireless Telecommunications Towers and Antennas
17.01 Purpose, Intent, and Applicability
A. Purpose
B. Intent
C. Applicability
17.02 Definitions
17.03 Requirements
A. General Requirements
B. Minimum Setbacks and Separations
C. Buildings or Other Equipment Storage
D. Co-location
17.04 Application Types
A. Administrative
B. Public Review
17.05 Application Submittal, Review, and Processing
A. General
B. Shot Clocks and Tolling
C. Review and Processing of Applications
17.06 Maintenance and Operation
A. Removal of Abandoned Antennas and Towers
B. State or Federal Requirements
C. Building Codes; Safety Standards
17.07 Nonconforming Uses
Page 1 of 36
Chapter 17
Wireless Telecommunications Towers and Antennas
Section 17.01 Purpose, Intent, and Applicability
A. The purpose of this ordinance is to establish general guidelines for the siting of wireless
communications towers and antennas. The goals of this ordinance are to:
(1.) protect Protect residential areas and land uses from potential adverse impacts of towers
and antennas;
(2.) encourage Encourage the location of towers in nonresidential areas;
(3.) minimize Minimize the total number of towers throughout the community;
(4.) strongly Strongly encourage the joint use of new and existing tower sites as a primary
option rather than construction of additional single-use towers;
(5.) encourage Encourage users of towers and antennas to locate them, to the extent
possible, in areas where the adverse impact on the community is minimal;
(6.) encourage Encourage users of towers and antennas to conflgure them in a way that
minimizes the adverse visual impact of the towers and antennas through careful design,
siting, landscape screening, and innovative camoufiaging techniques;
(7.) enhance Enhance the ability of the providers of telecommunications services to provide
such services to the community quickly, effectively, and efflciently;
(8.) consider Consider the public health and safety of communication towers; and
(9.) avoid Avoid potential damage to adjacent properties from tower failure through
engineering and careful siting of tower structures.
In furtherance of these goals, Town of Fountain Hills shall give due consideration to the Town of
Fountain Hills General Plan, the Town of Fountain Hills Zoning Ordinance, existing land uses,
and environmentally sensitive areas in approving sites for the location of towers and antennas.
B. It is the intent of this ordinance:
Page 2 of 36
1. That no wireless communication towers or antenna be sited, constructed, reconstructed,
installed, materially changed, expanded, or used unless in conformity with this Chapter.
2. To achieve a balance between the need to provide wireless services with the health,
safety, and general welfare of the residents of Fountain Hills the by balancing four (4)
simultaneous objectives:
a. Enabling personal wireless service providers to provide adequate personal wireless
services throughout the Town so that Town residents can enjoy the beneflts of same,
from any FCC-licensed wireless carrier from which they choose to obtain such services;
b. Minimizing the number of cell towers and/or other personal wireless service facilities
needed to provide such coverage;
c. Preventing, to the greatest extent reasonably practical, any unnecessary adverse
impacts upon the Town’s communities, residential areas, and individual homes; and,
d. Complying with all the legal requirements which the Telecommunications Act of 1996,
as amended (“TCA”) imposes upon the Town, when the Town receives, processes and
determines applications seeking approvals for the siting, construction and operation of
cell towers and/or other personal wireless service facilities.
AC. Applicability.
New Towers and Antennas: All new towers or antennas in Town of Fountain Hills shall be
subject to these regulations. The following exceptions apply:
B. Exceptions:
1. Amateur Radio Station Operators/Receive Only Antennas. This ordinance shall not govern
any tower, or the installation of any antenna, that is under the maximum building height of
the zoning district in which such structure is located and which is owned and operated by a
federally-licensed amateur radio station operator or is used exclusively for receive only
operations.
2. Preexisting Towers or Antennas. Legally established preexisting towers and preexisting
antennas shall not be required to meet the requirements of this ordinance, other than the
requirements of Sections 17.046 B. and C(F) & .
Page 3 of 36
3. AM Array. For purposes of implementing this ordinance, an AM array, consisting of one
or more tower units and supporting ground system which functions as one AM
broadcasting antenna, shall be considered one tower. Measurements for setbacks and
separation distances shall be measured from the outer perimeter of the towers included in
the AM array. Additional tower units may be added within the perimeter of the AM array by
right.
4. Small Cell Towers in the Right-of-Way. Wireless communication towers and antenna
meeting the deflnition of small wireless facilities as contained in A.R.S. 9-591 are subject to
the requirements of Article 16-2, Small Wireless Facilities, of the Town Code.
5. Mobile or Temporary Towers. Mobile wireless facilities when placed on site for seven
(7) consecutive days or less, provided any necessary building permit or encroachment
permit is obtained.
Section 17.02 Definitions
As used in this ordinance, the following terms shall have the meanings set forth below:
Alternative Tower Structure: means man-made trees, clock towers, bell steeples, light poles and
similar alternative-design mounting structures that camoufiage or conceal the presence of
antennas or towers.
Antenna: means any exterior transmitting or receiving device mounted on a tower, building or
structure and used in communications that radiates or captures electromagnetic waves, digital
signals, analog signals, radio frequencies (excluding radar signals), wireless telecommunications
signals or other communication signals.
Backhaul network: means the lines that connect a provider's towers/cell sites to one or more
cellular telephone switching offlces, and/or long distance providers, or the public switched
telephone network.
Existing Structure: means light poles, power poles, chimneys, billboards, and other similar
structures, which are placed, within the Town at the time of adoption of this Chapter, except
existing buildings.
Page 4 of 36
FAA: means the Federal Aviation Administration.
FCC: means the Federal Communications Commission.
Height: means, when referring to a tower or other structure, the vertical distance measured
from the natural grade level to the highest point of the structure directly above the natural
grade when such structure is not located in a platted subdivision. If the structure is located in a
platted subdivision, the height shall be the vertical distance measured from the flnished grade
as shown on the subdivision grading plans or flnished grade as shown on the individual lot's
grading plans, (whichever is lower), to the highest point of the structure directly above the
flnished grade. In the event that terrain problems prevent an accurate determination of height,
the Zoning Administrator shall rule as to height and appeal from that decision shall be to the
Board of Adjustment.
Pre-existing towers and preexisting antennas: means any tower or antenna for which a building
permit has been properly issued prior to the effective date of this ordinance, including
permitted towers or antennas that have not yet been constructed so long as such approval is
current and not expired.
Tower: means any structure that is designed and constructed primarily for the purpose of
supporting one or more antennas for telephone, radio and similar communication purposes,
including self-supporting lattice towers, guyed towers, or monopole towers. The term includes
radio and television transmission towers, microwave towers, common-carrier towers, cellular
telephone towers, alternative tower structures, and the like. The term also includes the
structure and any support thereto.
Utility service antennas: means antenna attached to utility boxes, poles, switches, storage
tanks, etc. and used by a utility provider to facilitate the operation of the utility system.
Wireless communication: means the transmission of voice or data without cable or wires.
Wireless facility: means wireless communication facilities including, but not limited to, facilities
that transmit and/or receive electromagnetic signals for cellular radio telephone service,
personal communications services, enhanced specialized mobile services, paging systems, and
related technologies. Such facilities also include antennas, microwave dishes, parabolic
antennas, and all other types of equipment used in the transmission or reception of such
signals; telecommunication towers or similar structures supporting said equipment; associated
Page 5 of 36
equipment cabinets and/or buildings; and all other accessory development used for the
provision of personal wireless services. These facilities do not include radio and television
broadcast towers and government-operated public safety networks.
Section 17.03 Applicability
A. New Towers and Antennas: All new towers or antennas in Town of Fountain Hills shall be
subject to these regulations.
B. Exceptions:
1. Amateur Radio Station Operators/Receive Only Antennas. This ordinance shall not govern
any tower, or the installation of any antenna, that is under the maximum building height of
the zoning district in which such structure is located and which is owned and operated by a
federally-licensed amateur radio station operator or is used exclusively for receive only
operations.
2. Preexisting Towers or Antennas. Legally established preexisting towers and preexisting
antennas shall not be required to meet the requirements of this ordinance, other than the
requirements of Sections 17.04(F) & (G).
3. AM Array. For purposes of implementing this ordinance, an AM array, consisting of one
or more tower units and supporting ground system which functions as one AM
broadcasting antenna, shall be considered one tower. Measurements for setbacks and
separation distances shall be measured from the outer perimeter of the towers included in
the AM array. Additional tower units may be added within the perimeter of the AM array by
right.
Section 17.034 General Requirements
A. General Requirements
Page 6 of 36
1. Principal or Accessory Use: Antennas and towers may be considered either principal or
accessory uses. A different existing use of an existing structure on the same lot shall not
preclude the installation of an antenna or tower on such lot.
B2. Lot Size: For purposes of determining whether the installation of a tower or antenna
complies with district development regulations, including but not limited to setback
requirements, lot-coverage requirements, and other such requirements, the dimensions of
the entire lot shall control, even though the antennas or towers may be located on leased
parcels within such lot.
C. Inventory of Existing Sites: Each applicant for an antenna and/or tower shall provide to the
Community Development Director an inventory of its existing towers, antennas, or sites
approved for towers or antennas, that are either within the jurisdiction of the Town of Fountain
Hills or within one mile of the border thereof, including speciflc information about the location,
height, and design of each tower. Each applicant shall also provide a one-year build-out plan for
all other wireless communications facilities within the Town. The Community Development
Director may share such information with other applicants applying for administrative
approvals or special use permits under this ordinance or with other organizations seeking to
locate antennas within the jurisdiction of Town of Fountain Hills, provided, however that the
Community Development Director is not, by sharing such information, in any way representing
or warranting that such sites are available or suitable.
D3. Aesthetics: Towers and antennas shall meet the following requirements:
1a. Towers shall, subject to any applicable standards of the FAA, be painted a neutral
color so as to reduce visual obtrusiveness.
2b. At a tower site, the design of the buildings and related structures shall, to the
extent possible, use materials; colors, textures, screening, and landscaping that will
blend them into the natural setting and surrounding buildings.
3c. If an antenna is installed on a structure other than a tower, the antenna and
supporting electrical and mechanical equipment must be of a neutral color that is
identical to, or closely compatible with, the color of the supporting structure so as to
make the antenna and related equipment as visually unobtrusive as possible.
Page 7 of 36
d. The choice of design for installing a new personal wireless service facility or the
substantial modiflcation of an existing personal wireless service facility shall be chosen
to minimize the potential adverse impacts that the new or expanded facility may, or is
likely to, infiict upon nearby properties.
e. Unless speciflcally required by other regulations, a telecommunications tower shall
have a flnish (either painted or unpainted) that minimizes its degree of visual impact.
f. Accessory Structures
i. Accessory structures shall maximize the use of building materials, colors, and
textures designed to blend with the natural surroundings. The use of camoufiage
communications towers may be required by the Council to blend the
communications tower and/or its accessory structures further into the natural
surroundings. "Camoufiage" is deflned as the use of materials incorporated into the
communications tower design that give communications towers the appearance of
tree branches and bark coatings, church steeples and crosses, sign structures,
lighting structures, or other similar structures.
ii. Accessory structures shall be designed to be architecturally similar, compatible
with each other, and shall be no more than twelve (12) feet high. The buildings shall
be used only for housing equipment related to the particular site. Whenever
possible, the buildings shall be joined or clustered so as to appear as one building.
iii. No portion of any telecommunications tower or accessory structure shall be
used for a sign or other advertising purpose, including but not limited to the
company name, phone numbers, banners, and streamers, except the following. A
sign of no greater than two square feet indicating the name of the facility owner(s)
and a twenty-four-hour emergency telephone shall be posted adjacent to any entry
gate. In addition, "no trespassing" or other warning signs may be posted on the
fence. All signs shall conform to the sign requirements of the Town.
g. Towers must be placed to minimize visual impacts. Applicants shall place towers on
the side slope of the terrain so that, as much as possible, the top of the tower does not
protrude over the ridgeline, as seen from public ways.
Page 8 of 36
h. Existing vegetation. Existing vegetation shall be preserved to the maximum extent
possible. No cutting of trees shall take place on a site connected with an application
made under this article prior to the approval of the special use permit use.
i. Screening.
i. Tree plantings may be required to screen portions of the telecommunications
tower and accessory structures from nearby residential property as well as from
public sites known to include important views or vistas. Additional palm trees may
be required to accompany towers which use a palm tree stealth design.
ii. Where a site adjoins a residential property or public property, including streets,
screening suitable in type, size and quantity shall be required by the Town Council.
iii. The applicant shall demonstrate to the approving board that adequate
measures have been taken to screen and abate noise emanating from on-site
equipment, including but not limited to heating and ventilating units, air
conditioners, and emergency power generators. Telecommunications towers shall
comply with all applicable sections of this chapter as it pertains to noise control and
abatement.
j. Utility Services Antennas
i. For antenna placed in the Town’s right-of-way with the top of the antenna less
than six (6’) feet above ground level, the support structure and antenna shall be
painted a neutral color to blend with the surrounding area. If the top of the
antenna is six (6’) feet or more above ground level, the antenna and support
structure shall utilize the approve Saguaro cactus stealth design.
ii. For antenna placed on private property:
1. If placed on another utility structure such as a water tower, the antenna shall
be painted to blend with the building or equipment it placed on.
2. If a separate tower structure is used, the antenna design shall comply with the
provisions above in this section.
Page 9 of 36
E4. Lighting: Towers shall not be artiflcially lighted, unless required by the FAA or other
applicable authority. If lighting is required, the lighting alternatives and design chosen must
cause the least disturbance to the surrounding views.
F. State or Federal Requirements: All towers must meet or exceed current standards and
regulations of the FAA, the FCC, and any other agency of the state or federal government with
the authority to regulate towers and antennas. If such standards and regulations are changed,
then the owners of the towers and antennas governed by this chapter shall bring such towers
and antennas into compliance with such revised standards and regulations within six (6)
months of the effective date of such standards and regulations, unless a different compliance
schedule is mandated by the controlling state or federal agency. Failure to bring towers and
antennas into compliance with such revised standards and regulations shall constitute grounds
for the removal of the tower or antenna at the owner's expense.
G. Building Codes; Safety Standards: To ensure the structural integrity of towers, the owner of
a tower shall ensure that it is maintained in compliance with standards contained in applicable
state or local building codes and the applicable standards for towers that are published by the
Electronic Industries Association, as amended from time to time. If, upon inspection, the Town
of Fountain Hills concludes that a tower fails to comply with such codes and standards and
constitutes a danger to persons or property, then upon notice being provided to the owner of
the tower, the owner shall have thirty (30) days to bring such tower into compliance with such
standards. Failure to bring such tower into compliance within said thirty (30) days shall
constitute grounds for the removal of the tower or antenna at the owner's expense.
H5. Measurement: For purposes of measurement, tower setbacks and separation
distances shall be calculated and applied to facilities located in the Town of Fountain Hills
irrespective of municipal and county jurisdictional boundaries.
I6. Not Essential Services: Towers and antennas shall be regulated and permitted pursuant
to this chapter and shall not be regulated or permitted as essential services, public utilities,
or private utilities.
J7. Franchises: Owners and/or operators of towers or antennas shall certify that all
franchises required by law for the construction and/or operation of a wireless
communication system in the Town of Fountain Hills have been obtained and shall flle a
copy of all required franchises with the Community Development Director.
Page 10 of 36
K. Public Notice: For purposes of this chapter, any special use request shall require public
notice pursuant to Section 2.02(C) of this Zoning Ordinance except that the notice required shall
include posting of the property, and mailing to all property owners within 300 feet of the
proposed use, and publication in a newspaper of general circulation regardless of any
expression to the contrary in Section 2.02.
L8. Signs: No signs shall be allowed on an antenna or tower.
M. Buildings and Support Equipment: Buildings and support equipment associated with
antennas or towers shall comply with the requirements of Section 17.08.
N9. Co-location and Multiple Antenna/Tower Plan: The Town of Fountain Hills encourages
tower and antenna users to submit a single application for approval of multiple towers
and/or antenna sites and to submit applications, which utilize co-location with an existing
wireless telecommunications provider. Applications for approval of multiple sites or for co-
location with an existing provider shall be given priority in the review process.
O10. Security fencing: Towers shall be enclosed by security fencing not less than six (6) feet
in height and no more than eight (8) feet in height, shall be constructed of a block or
masonry, and shall be equipped with an appropriate anti-climbing device; provided
however, that the Town Council may waive such requirements, as it deems appropriate.
P11. Landscaping: The following requirements shall govern the landscaping surrounding
towers; provided, however, that the Town Council may waive such requirements if the goals
of this chapter would be better served thereby.
1a. Tower facilities shall be landscaped with a buffer of plant materials that effectively
screens the view of the tower compound from residential property. The standard buffer
shall consist of a landscaped strip at least four (4) feet wide outside the perimeter of the
compound.
2b. In locations where the visual impact of the tower would be minimal, the
landscaping requirement may be reduced or waived.
3c. Existing mature plant growth and natural landforms on the site shall be preserved
to the maximum extent possible.
Page 11 of 36
13. Noise: Submission of applications for towers and associated equipment shall include
noise and acoustical information, prepared by a qualifled flrm or individual, for the base
transceiver station(s), equipment buildings, and associated equipment such as air
conditioning units and backup generators. The Town may require the applicant to
incorporate appropriate noise baffiing materials and/or strategies to avoid any ambient
noise from equipment reasonably likely to exceed the applicable noise regulations
contained in Section 11-1-7 of the Town Code.
14. Any information of an engineering nature that the applicant submits, whether civil,
mechanical, or electrical, shall be certifled by an Arizona Licensed Professional Engineer.
15. Application approval issued under this Chapter shall be conditioned upon veriflcation
by the Town Engineer or designee that such tower structure is structurally sound. Such
veriflcation shall be received by the applicant prior to submission.
B. Minimum Setbacks and Separations
1. Setbacks: The following setback requirements shall apply to all towers; provided,
however, that the Town Council may reasonably reduce the standard setback requirements
if the goals of this chapter would be better served thereby:
a. Towers must be set back a distance equal to at least one hundred percent (100%) of
the height of the tower from any adjoining lot line. Provided, however, that separation
distances from residential uses shall be in accordance with Table 1 set forth below.
b. Accessory buildings must satisfy the minimum zoning district setback requirements.
2. Separation: The following separation requirements shall apply to all towers and
antennas provided, however, that the Town Council may reasonably reduce the standard
separation requirements if the goals of this chapter would be better served thereby.
a. Separation from off-site uses/designated areas.
i. Tower separation shall be measured from the base of the tower to the lot line of
the off-site uses and/or designated areas as specifled in Table 1, except as otherwise
provided in Table 1.
Page 12 of 36
ii. Separation requirements for towers shall comply with the minimum standards
established in Table 1.
Table 1. Separation Requirements from Offsite Uses/Areas
Off-site Use/Designated Area Separation Distance
Single-family or duplex residential units1 200 feet or 300% of tower height, whichever is greater
Vacant single-family or duplex residentially zoned
land which is either platted or has preliminary plat
approval which is not expired
200 feet or 300% of tower height, whichever is greater2
Vacant unplatted residentially zoned lands3 100 feet or 100% of tower height, whichever is greater
Existing multifamily residential units greater than
duplex units
100 feet or 100% of tower height, whichever is greater
Nonresidentially zoned lands or nonresidential
uses
None, only setbacks apply
1 Includes modular homes and mobile homes used for living purposes.
2 Separation measured from base of tower to closest building setback line.
3 Includes any unplatted residential use properties without a valid preliminary subdivision plan or
valid development plan and any multifamily residentially zoned land greater than a duplex.
b. Separation distances between towers:
Separation distances between towers shall be applicable for and measured between the
proposed tower and preexisting towers. The separation distances shall be measured by
drawing or following a straight line between the base of the existing tower and the
proposed base, pursuant to a site plan, of the proposed tower. The separation distances
(listed in linear feet) shall be as shown in Table number 2.
Table 2. Separation Distances between Towers
Page 13 of 36
Monopole 65 ft. in
height or greater
Monopole less than 65
ft. in height but greater
than 40 ft. in height
Monopole less than
40 ft. in height
Monopole 65 ft. in height or
greater
2,000 feet 1,500 feet 1,000 feet
Monopole less than 65 ft. in height
but greater than 40 ft. in height
1,500 feet 1,500 feet 1,000 feet
Monopole less than 40 ft. in height 1,000 feet 1,000 feet 750 feet
C. Buildings or Other Equipment Storage
1. Antennas Mounted on Structures or Rooftops: The equipment cabinet or structure used
in association with antennas shall comply with the following:
a. The cabinet or structure shall not contain more than one hundred-twenty (120)
square feet of gross fioor area or be more than eight (8) feet in height and shall be
located on the ground.
b. Equipment storage buildings or cabinets shall comply with all applicable building
codes.
2. Antennas Mounted on Utility Poles, Light Poles, or Towers: The equipment cabinet or
structure used in association with antennas shall be located in accordance with the
following:
a. In residential districts, the equipment cabinet or structure may be located:
i. In a required front yard or required street side yard, provided the cabinet
structure is no greater than three and one-half (3.5) feet in height and twenty (20)
square feet of gross fioor area and the cabinet/structure is located a minimum of
three (3) feet from all lot lines. The cabinet/structure shall be screened by sight
obscuring landscaping which obscures at least ninety-flve percent (95%) of the
Page 14 of 36
structure at planting and throughout the duration of the cabinet or structure’s
existence with an ultimate height not to exceed forty-two (42) inches.
ii. In a required rear yard, provided the cabinet or structure is no greater than flve
(5) feet in height or one hundred-twenty (120) square feet in gross fioor area. The
cabinet/structure shall be screened by sight obscuring landscaping which obscures
at least ninety-flve percent (95%) of the structure at planting and throughout the
duration of the cabinet or structure’s existence with an ultimate height of six (6) feet.
iii. The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure.
b. In commercial or industrial districts the equipment cabinet or structure shall be no
greater than fourteen (14) feet in height or three hundred (300) square feet in gross
fioor area. The structure or cabinet shall be screened by sight-obscuring landscaping
with an ultimate height of sixteen (16) feet and a planted height of at least six (6) feet.
The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure. Such access way shall not
face residentially zoned property.
3. Modiflcation of Building Size Requirements: The requirements of Sections 17.08(A)
through (C) may be modifled by the Town Council in the case of uses permitted by special
use to encourage collocation.
D. Co-location
1. Any new telecommunications tower shall be designed to accommodate future shared
use by other communications providers.
2. Good Faith: Applicants and permittees shall cooperate and exercise good faith in co-
locating wireless telecommunications facilities on the same support structures or site, if the
Town so requests. Good faith shall include sharing technical information to evaluate the
feasibility of co-location, and may include negotiations for erection of a replacement
support structure to accommodate co-location. A competitive confiict to co-location or
flnancial burden caused by sharing such information normally will not be considered as an
excuse to comply with this section.
Page 15 of 36
3. Third Party Technical Review: In the event a dispute arises as to whether a permittee has
exercised good faith in accommodating other users, the Town may require the applicant to
obtain a third party technical study at the applicant’s expense. The Town may review any
information submitted by the applicant and permittee(s) in determining whether good faith
has been exercised.
4. Exceptions: No co-location may be required where the shared use would or does result
in signiflcant interference in the broadcast or reception capabilities of the existing wireless
telecommunications facilities or failure of the existing wireless telecommunications facilities
to meet federal standards for emissions.
5. Violation; penalty: Failure to comply with co-location requirements when feasible may
result in denial of a permit request or revocation of an existing permit.
Section 17.0504 Permitted UsesApplication Types
A. General: The uses listed in this Section are deemed to be permitted uses and shall not
require administrative approval or a special use permit.
B. Permitted Uses: The following uses are speciflcally permitted:
1. Antennas or towers located on property owned, leased, or otherwise controlled by the
Town of Fountain Hills provided a license or lease authorizing such antenna or tower has
been approved by the Town of Fountain Hills. No such license or lease shall be issued for a
tower located within three hundred (300) feet of any residentially zoned property until a
public hearing has been held at a regular or special Town Council meeting.
2. Alternative tower structures when such structures and their accompanying equipment are
appropriately blended into the surrounding terrain, are within the height limitations of the
underlying zoning district and are not nearer than three hundred (300) feet to residentially
zoned and platted property.A. Administrative: The following types of applications are processed
administratively by staff:
Page 16 of 36
1. Applications to change or modify an antenna on an existing administratively approved
tower that remains in compliance with all ordinance requirements.
2. Applications to change or modify an antenna on an existing tower approved through
public review, provided that the modiflcation will not:
a. Increase the approved height of the supporting structure by more than 10% or twenty
(20) feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than 50%;
c. Increase the original approved square footage of accessory buildings by more than
200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause signiflcant adverse impacts on the existing support structure or the
surrounding area.
3. Applications for co-location of additional antenna for an additional service provider on an
existing administratively approved tower that remains in compliance with all ordinance
requirements.
4. Applications for co-location of additional antenna for an additional service provider on an
existing tower approved through public review, provided that the modiflcation will not:
a. Increase the approved height of the supporting structure by more than 10% or twenty
(20) feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than 50%;
Page 17 of 36
c. Increase the original approved square footage of accessory buildings by more than
200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause signiflcant adverse impacts on the existing support structure or the
surrounding area.
5. Applications for new utility service antenna that comply with the height and setback
requirements of the zoning district in which they are located.
6. Applications for mobile or temporary wireless facilities for more than seven (7)
consecutive days.
7. Applications for new towers in the following locations:
a. Town property with the tower located at least three hundred (300’) from residentially
zoned property.
b. On non-residentially zoned property and located at least three hundred feet (300’)
from residentially zoned property.
c. Alternative tower structures when such structures and their accompanying
equipment are appropriately blended into the surrounding terrain, are within the height
limitations of the underlying zoning district, and are at least three hundred feet (300’)
from residentially zoned property.
B. Public Review: The following types of applications require review and approval by the Town
Council:
Page 18 of 36
1. Towers on Town property when the tower will be located less than 300’ of residentially
zoned property.
2. All other towers and antenna not meeting the requirements in Sec. 17.04 A or Sec. 17.04
B 1.
Section 17.0605 Special Use PermitsApplication Submittal, Review, and
Processing
A. General: The following provisions shall govern the issuance of special use permits for
towers or antennas by the Town Councilreview of all wireless communication facility
applications:
1. If the tower or antenna is not a permitted use under Section 17.05 of this chapter, then
a special use permit shall be required for the construction of a tower or the placement of
an antenna in all zoning districts. Complete Application. Applications for wireless
communication facilities shall be flled electronically on the Town’s website by an owner of
real property and shall contain the area proposed for the wireless communication facility
using the process established by the Director for such applications. All such applications
shall include the information required in this section. Applications flled on behalf of the
property owner by a third party shall include a statement from the property owner
authorizing the submittal of the application.
2. Applications shall include documentation of compliance with items listed in Section 17.03
A as applicable to the application submitted.
C3. Inventory of Existing Sites: Each applicant for an new antenna and/or tower or co-
location of new antenna on an existing tower shall provide to the Community Development
Services Director an inventory of its existing towers, antennas, or sites approved for towers
or antennas, that are either within the jurisdiction of the Town of Fountain Hills or within
one mile of the border thereof, including speciflc information about the location, height,
and design of each tower. Each applicant shall also provide a one-year build-out plan for all
other wireless communications facilities within the Town. The Community Development
Services Director may share such information with other applicants applying for
administrative approvals or special use permits under this ordinance or with other
Page 19 of 36
organizations seeking to locate antennas within the jurisdiction of Town of Fountain Hills,
provided, however that the Community Development Services Director is not, by sharing
such information, in any way representing or warranting that such sites are available or
suitable.
2. Applications for special use permits under this Section shall be subject to the
procedures and requirements of Chapter 2, Section 2.02, of this Zoning Ordinance, except
as modifled in this Section.
3. In granting a special use permit, the Town Council may impose conditions to the extent
such conditions are necessary to minimize any adverse effect of the proposed tower on
adjoining properties.
4. Any information of an engineering nature that the applicant submits, whether civil,
mechanical, or electrical, shall be certifled by an Arizona Licensed Professional Engineer.
5. An applicant for a special use permit shall submit the information described in this
section and a nonrefundable fee established pursuant to Section 2.02(H) of this Zoning
Ordinance.
6. A Special Use Permit issued under this Chapter shall be conditioned upon veriflcation
by the Town Engineer or designee that such tower structure is structurally sound. Such
veriflcation shall be received by the applicant prior to submission.
4. Utility Service Antennas:
a. Located in public right-of-way. These types of application are reviewed and
approved through the Town’s Encroachment Permit process as provided in Town Code
Article 16-1, Encroachments.
b. Located on property owned by the utility company.
i. If the antenna complies with the height requirements of the underlying zoning
district, the plans for the antenna will be reviewed and approved with the overall site
development plans if the site is being developed concurrently. If the antenna is
being added to an existing utility site, the plans will be reviewed and processed
consistent with the requirements of Section 17.05 C.
Page 20 of 36
ii. If the antenna does not comply with the height requirements of the underlying
zoning district, the plans for the antenna will be reviewed and processed consistent
with the requirements of Section 17.05 D.
5. Applications Using Existing Towers:
a. Dimensioned, to-scale drawings showing the existing and proposed antenna on the
tower including the height of the tower and the antennas.
b. The number and type of existing and proposed antenna.
c. Engineering calculations documenting the structural changes and certifying the
tower’s ability to carry the new antennas.
d. Dimensioned, to-scale drawings illustrating modiflcation of ground equipment, if
any.
B6. Applications Using New Towers:
1. Information required. In addition to any information required for applications for special
use permits pursuant to Chapter 2, Section 2.02 of this Zoning Ordinance, applicants for a
special use permit for a tower shall submit the following information:
a. A site Plan as required in Section 2.04 plus zoning, General Plan classiflcation of the
site and all properties within the applicable separation distances set forth in Section
17.0703 (B)., adjacent roadways, proposed means of access, elevation drawings of the
proposed tower and any other structures, photo simulations showing the tower in the
proposed location from at least four directions, and other information deemed by the
Development Services Director to be necessary to assess compliance with this chapter.
b. The setback distance between the proposed tower and the nearest residential unit
and residentially zoned properties.
c. The separation distance from other towers described in the inventory of existing
sites submitted pursuant to Section 17.0403 (CB.) shall be shown on an updated site
plan or map. The applicant shall also identify the type of construction of the existing
tower(s) and the owner/operator of the existing tower(s), if known.
Page 21 of 36
d. Method of fencing, and flnished color and, if applicable, the method of camoufiage
and illumination.
e. A description of compliance with Sections 17.04(C), (D), (E), (F), (G), (J), (L) 17.03 C. 3, 4,
5, 7, 8, 9, 10, 11, and (M), (N), (O)17.03 B. and (P), 17.07(A), 17.07(B)17.05 A. 3, and 17.06
A. and B., and all applicable federal, state or local laws.
f. A notarized statement by the applicant as to whether construction of the tower will
accommodate collocation of additional antennas for future users.
g. Identiflcation of the entities providing the backhaul network for the tower(s)
described in the application and other cellular sites owned or operated by the applicant
in the municipality.
h. A description of the suitability of the use of existing towers, other structures or
alternative technology not requiring the use of towers or structures to provide the
services to be provided through the use of the proposed new tower.
i. A description of the feasible alternative location(s) of future towers or antennas
within the Town of Fountain Hills based upon existing physical, engineering,
technological or geographical limitations in the event the proposed tower is erected.
j. A statement of compliance with Federal Communications Commission (FCC) Radio
Frequency (RF) exposure standards.
7. Filing Fee. Payment of a flling fee in an amount established by a schedule adopted by
resolution of the Council and flled in the offlces of the Town Clerk. No part of the flling fee
shall be returnable.
2. Noise: No permit shall be issued for any facility, which generates a noise level greater
than flfty decibels (50 db) as measured at the edge of the property upon which such facility
is sited.
B. Shot Clocks and Tolling.
To comply with the requirements of Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA, the following
shot clock periods set forth herein below shall be presumed to be reasonable periods within
which the Town shall render determinations upon applications for wireless communication
facilities.
Page 22 of 36
The Town shall render determinations upon such applications within the periods set forth
hereinbelow, unless the applicable shot clock period listed below is tolled, extended by
agreement or the processing of the application is delayed due to circumstances beyond the
Town’s controls.
1. Application Shot Clocks.
a. Receipt of Initial Application. Upon receipt of an application, the Development
Services Director, or designee, shall review the application for completeness. If the
Director determines the application is: (a) incomplete, (b) missing required application
materials, (c) is the wrong type of application, or (d) is otherwise defective, then, within
ten (10) days for administrative applications and thirty (30) days for public hearing
applications of the Town’s receipt of the application, the Director, or their designee, shall
notify the applicant of the flnding and state what is needed to have a complete
application.
The notice of incompleteness shall toll the shot clock, which shall not thereafter resume
running unless and until the applicant tenders an additional submission to the Director
to remedy the issues identifled in the notice of incomplete application. The submission
of any responsive materials by the applicant shall automatically cause the shot clock
period to resume running.
If upon receipt of any additional materials from the applicant, the Director determines
that the application is still incomplete and/or defective, then the Director shall, once
again notify the applicant within ten (10) days for administrative applications and thirty
(30) days for public hearing applications of the applicant having flled its supplemental or
corrected materials to the Town and the shot clock shall once again be tolled, and the
same procedure provided for hereinabove shall be repeated.
b. Application Review. The shock clock for Administrative applications which do not
involve new towers is ninety (90) days. The shot clock for Administrative applications
with new towers and Public Review applications is one hundred flfty (150) days.
2. Shot Clock Tolls, Extensions & Reasonable Delay Periods
Consistent with the letter and intent of Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA, each of
the shot clock periods set forth within Section 17.05 B. hereinabove shall generally be
Page 23 of 36
presumed to be sufflcient periods within which the Town shall render decisions upon
applications.
Notwithstanding same, the applicable shot clock periods may be tolled, extended by mutual
agreement between any applicant and/or its representative and the Town, and the Town
shall not be required to render its determination within the shot clock period presumed to
be reasonable for each type of application, where the processing of such application is
reasonably delayed, as described hereinbelow.
a. Tolling of the Applicable Shot Clock Due to Incompleteness and/or Applicant
Error
As provided for within Section 17.05 B. 1. hereinabove, in the event that the
Development Services Director deems an application incomplete, the Director shall send
a Notice of Incompleteness to the applicant to notify the applicant that its application is
incomplete and/or contains material errors, and shall reasonably identify the missing
information and/or documents and/or the error(s) in the application.
If the Director sends a Notice of Incompleteness as described hereinabove, the
applicable shot clock shall automatically be tolled, meaning that the applicable shot
clock period within which the Town is required to render a flnal decision upon the
application shall immediately cease running, and shall not resume running, unless and
until the Town receives a responsive submission from the applicant.
If and when the applicant thereafter submits additional information in an effort to
complete its application, or cure any identifled defect(s), then the shot clock shall
automatically resume running, but shall not be deemed to start running anew.
The applicable shot clock period shall, once again, be tolled if the Director thereafter
provides a second notice that the application is still incomplete or defective, despite any
additional submissions which have been received by the Town, from the applicant, up to
that point.
b. Shot Clock Extension by Mutual Agreement
The Town shall be free to extend any applicable shot clock period by mutual agreement
with any respective applicant. This discretion on the part of the Town shall include the
Town’s authority to request, at any time, and for any period of time the Town may deem
Page 24 of 36
reasonable or appropriate under the circumstances, consent from a respective
applicant to extend the applicable shot clock period to enable the Town, the applicant,
or any relevant third party, to complete any type of undertaking or task related to the
review, analysis, processing, and determination of the particular application, which is
then pending before the Town, to the extent that any such Undertaking, task, or review
is consistent with, or reasonably related to, compliance with any federal, state, or local
law and/or the requirements of any provision of the Town Code, including but not
limited to this Chapter.
In response to any request by the Town, the applicant, by its principal, agent, attorney,
site acquisition agent, or other authorized representative, can consent to any extension
of any applicable shot clock by afflrmatively indicating its consent either in writing or by
afflrmatively indicating its consent on the record at any public hearing or public
meeting. The Town shall be permitted to reasonably rely upon a representative of the
applicant indicating that they are authorized to grant such consent on behalf of the
respective applicant, on whose behalf they have been addressing the Town within the
review process.
c. Reasonable Delay Extensions of Shot Clock Periods
The Town recognizes that there may be situations wherein, due to circumstances
beyond the control of the Town and/or the Town Council, the review and issuance of a
flnal decision upon an application for a wireless communication facility cannot
reasonably be completed within the application shot clock periods delineated within
Section 17.05 B hereinabove.
If, despite the exercise of due diligence by the Town, the determination regarding a
speciflc application cannot reasonably be completed within the applicable shot clock
period, the Town shall be permitted to continue and complete its review and issue its
determination at a date beyond the expiration of the applicable period, if the delay of
such flnal decision is due to circumstances including, but not limited to, those
enumerated hereinbelow, each of which shall serve as a reasonable basis for a
reasonable delay of the applicable shot clock period.
i. In the event that the rendering of a flnal decision upon an application under this
Chapter is delayed due to natural and/or unnatural events and/or forces which are
not within the control of the Town, such as the unavoidable delays experienced in
Page 25 of 36
government processes due to the COVID 19 pandemic, and/or mandatory
compliance with any related federal or state government orders issued in relation
thereto, such delays shall constitute reasonable delays which shall be recognized as
acceptable grounds for extending the period for review and the rendering of flnal
determinations beyond the period allotted under the applicable shot clock.
ii. In the event that applicant tenders eleventh-hour submissions to the Town in
the form of (a) expert reports, (b) expert materials, and/or (c) materials which
require a signiflcant period for review due either to their complexity or the sheer
volume of materials which an applicant has chosen to provide to the Town at such
late point in the proceedings, the Town shall be afforded a reasonable time to
review such late-submitted materials.
If reasonably necessary, the Town shall be permitted to retain the services of an
expert consultant to review any late-submitted expert reports which were provided
to the Town, even if such review or services extend beyond the applicable shot clock
period, so long as the Town completes such review and retains and secures such
expert services within a reasonable period of time thereafter and otherwise acts
with reasonable diligence in completing its review and rendering its flnal decision.
C. Review and Processing of Applications
1. Conformity to the following shall be considered in review of all applications:
a. The application is consistent with the objectives of this ordinance.
b. The height of the proposed tower.
c. The adequacy of the proposed site, considering such factors as the sufficiency of the
size of the site to comply with the established criteria, the configuration of the site, and
the extent to which the site is formed by logical boundaries (e.g., topography, natural
features, streets, relationship of adjacent uses, etc.) that provide for the ability to
comply with the provisions of this ordinance.
d. The extent to which the proposal responds to the impact of the proposed
development on adjacent land uses, especially in terms of visual impact.
Page 26 of 36
e. The extent to which the proposed telecommunications facility is camouflaged (i.e.,
use of stealth technology).
f. The extent to which the proposed facility is integrated with existing structures (i.e.,
buildings, signs, utility poles, etc.) with particular reference to design characteristics that
have the effect of reducing or eliminating visual obtrusiveness.
g. An applicant's compliance with all town requirements with respect to previous
applications.
2. Review of Administrative Applications.
a. Administrative applications will be reviewed by staff using the Town’s standard
permit plan review processes. Applications for new towers shall provide staff with the
same information as required in Section 17.05 C 3 for Public Review Applications.
b. Applications for mobile or temporary wireless facilities which remain in place for
more than seven (7) consecutive days must submit a request for a Temporary Use
Permit as provided in Section 2.03 of the Zoning Ordinance.
3. Review and Processing of Public Review Applications
a. Applications which require public hearing review and approval will be processed using
the requirements listed in Section 2.02 of the Town’s Zoning Ordinance for Special Use
Permits.
3b. Factors Considered in Granting Special Use Permits for Towers: In addition to the
factors listed in 7.05 C 1 for review of applications, public review applications will also be
subject to the any standards for consideration of special use permit applications
pursuant to Chapter 2, Section 2.02 of this Zoning Ordinance, the Town Council shall
consider the following factors in determining whether to issue a special use permit,
although the Town Council may waive or reduce the burden on the applicant of one or
more of these criteria if the Town Council concludes that the goals of this ordinance are
better served thereby:
a. Height of the proposed tower;
b. Proximity of the tower to residential structures and residentially zoned district
boundaries;
Page 27 of 36
c. Nature of uses on adjacent and nearby properties;
d. Surrounding topography;
e. Surrounding tree coverage and foliage;
f. Design of the tower, with particular reference to design characteristics that have the
effect of reducing or eliminating visual obtrusiveness.
g. Proposed ingress and egress; and
h. Availability of suitable existing towers, other structures, or alternative technologies
not requiring the use of towers or structures, as discussed in Section 17.06(B)(4) of this
chapter.
4c. Availability of Suitable Existing Towers, Other Structures, or Alternative
Technology: No new tower shall be permitted unless the applicant demonstrates to the
reasonable satisfaction of the Town Council that no existing tower, structure or
alternative technology that does not require the use of towers or structures can
accommodate the applicant's a proposed antenna. An applicant shall submit
information requested by the Town Council related to the availability of suitable
existing towers, other structures or alternative technology. Evidence submitted to
demonstrate that no existing tower, structure or alternative technology can
accommodate the applicant's proposed antenna may consist of any of the following:
ai. No existing towers or structures are located within the geographic area, which
meet applicant's engineering requirements.
bii. Existing towers or structures are not of sufflcient height to meet applicant's
engineering requirements.
ciii. Existing towers or structures do not have sufflcient structural strength to
support applicant's proposed antenna and related equipment.
div. The applicant's proposed antenna would cause electromagnetic interference
with the antenna on the existing towers or structures, or the antenna on the existing
towers or structures would cause interference with the applicant's proposed
antenna.
Page 28 of 36
ev. The fees, costs, or contractual provisions required by the owner in order to
share an existing tower or structure or to adapt an existing tower or structure for
sharing are unreasonable. Costs exceeding new tower development are presumed
to be unreasonable.
fvi. The applicant demonstrates that there are other limiting factors that render
existing towers and structures unsuitable.
gvii. The applicant demonstrates that an alternative technology that does not
require the use of towers or structures, such as a cable micro cell network using
multiple low-powered transmitters/receivers attached to a wire line system, is
unsuitable. Costs of alternative technology that exceed new tower or antenna
development shall not be presumed to render the technology unsuitable.
viii. If the applicant asserts a claim that a proposed facility is necessary to remedy
one or more existing signiflcant gaps in an identifled wireless carrier’s personal
wireless services, the Council may require the applicant to provide drive-test
generated coverage maps, as opposed to computer-generated coverage maps, for
each frequency at which the carrier provides personal wireless services, to show
signal strengths in bins of three (3) DBM each, to enable the Council to assess the
existence of such signiflcant gaps accurately, and/or whether the carrier possesses
adequate coverage within the geographic area which is the subject of the respective
application.
4. In granting a permit, the Town may impose conditions to the extent such conditions are
necessary to minimize any adverse effect of the proposed tower on adjoining properties.
Section 17.07 Minimum Setbacks and Separation
A. Setbacks: The following setback requirements shall apply to all towers; provided, however,
that the Town Council may reduce the standard setback requirements if the goals of this
chapter would be better served thereby:
1. Towers must be set back a distance equal to at least one hundred percent (100%) of the
height of the tower from any adjoining lot line. Provided, however, that separation
distances from residential uses shall be in accordance with Table 1 set forth below.
Page 29 of 36
2. Accessory buildings must satisfy the minimum zoning district setback requirements.
B. Separation: The following separation requirements shall apply to all towers and antennas
provided, however, that the Town Council may reduce the standard separation requirements if
the goals of this chapter would be better served thereby.
1. Separation from off-site uses/designated areas.
a. Tower separation shall be measured from the base of the tower to the lot line of
the off-site uses and/or designated areas as specifled in Table 1, except as otherwise
provided in Table 1.
b. Separation requirements for towers shall comply with the minimum standards
established in Table 1.
Table 1. Separation Requirements from Offsite Uses/Areas
Off-site Use/Designated Area Separation Distance
Single-family or duplex residential units1 200 feet or 300% of tower height, whichever is greater
Vacant single-family or duplex residentially zoned
land which is either platted or has preliminary plat
approval which is not expired
200 feet or 300% of tower height, whichever is greater2
Vacant unplatted residentially zoned lands3 100 feet or 100% of tower height, whichever is greater
Existing multifamily residential units greater than
duplex units
100 feet or 100% of tower height, whichever is greater
Nonresidentially zoned lands or nonresidential
uses
None, only setbacks apply
1 Includes modular homes and mobile homes used for living purposes.
2 Separation measured from base of tower to closest building setback line.
3 Includes any unplatted residential use properties without a valid preliminary subdivision plan or
valid development plan and any multifamily residentially zoned land greater than a duplex.
Page 30 of 36
2. Separation distances between towers:
Separation distances between towers shall be applicable for and measured between the
proposed tower and preexisting towers. The separation distances shall be measured by
drawing or following a straight line between the base of the existing tower and the
proposed base, pursuant to a site plan, of the proposed tower. The separation distances
(listed in linear feet) shall be as shown in Table number 2.
Table 2. Separation Distances between Towers
Monopole 65 ft. in
height or greater
Monopole less than 65
ft. in height but greater
than 40 ft. in height
Monopole less than
40 ft. in height
Monopole 65 ft. in height or
greater
2,000 feet 1,500 feet 1,000 feet
Monopole less than 65 ft. in height
but greater than 40 ft. in height
1,500 feet 1,500 feet 1,000 feet
Monopole less than 40 ft. in height 1,000 feet 1,000 feet 750 feet
Section 17.08 Buildings or Other Equipment Storage
A. Antennas Mounted on Structures or Rooftops: The equipment cabinet or structure used in
association with antennas shall comply with the following:
1. The cabinet or structure shall not contain more than one hundred-twenty (120) square
feet of gross fioor area or be more than eight (8) feet in height and shall be located on the
ground.
2. Equipment storage buildings or cabinets shall comply with all applicable building codes.
B. Antennas Mounted on Utility Poles, Light Poles, or Towers: The equipment cabinet or
structure used in association with antennas shall be located in accordance with the following:
1. In residential districts, the equipment cabinet or structure may be located:
Page 31 of 36
a. In a required front yard or required street side yard provided the cabinet structure
is no greater than three and one-half (3.5) feet in height or twenty (20) square feet of
gross fioor area and the cabinet/structure is located a minimum of three (3) feet from
all lot lines. The cabinet/structure shall be screened by sight obscuring landscaping
which obscures at least ninety-flve percent (95%) of the structure at planting and
throughout the duration of the cabinet or structure’s existence with an ultimate height
not to exceed forty-two (42) inches.
b. In a required rear yard, provided the cabinet or structure is no greater than flve (5)
feet in height or one hundred-twenty (120) square feet in gross fioor area. The
cabinet/structure shall be screened by sight obscuring landscaping which obscures at
least ninety-flve percent (95%) of the structure at planting and throughout the duration
of the cabinet or structure’s existence with an ultimate height of six (6) feet.
c. The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure.
2. In commercial or industrial districts the equipment cabinet or structure shall be no
greater than fourteen (14) feet in height or three hundred (300) square feet in gross fioor
area. The structure or cabinet shall be screened by sight-obscuring landscaping with an
ultimate height of sixteen (16) feet and a planted height of at least six (6) feet. The entry or
access side of a cabinet or structure shall be gated by a solid, sight-obscuring gate that is
separate from the cabinet or structure. Such access way shall not face residentially zoned
property.
C. Modiflcation of Building Size Requirements: The requirements of Sections 17.08(A) through
(C) may be modifled by the Town Council in the case of uses permitted by special use to
encourage collocation.
Section 17.09 Co-Location
A. Good Faith: Applicants and permittees shall cooperate and exercise good faith in co-locating
wireless telecommunications facilities on the same support structures or site, if the Town so
requests. Good faith shall include sharing technical information to evaluate the feasibility of co-
location, and may include negotiations for erection of a replacement support structure to
Page 32 of 36
accommodate co-location. A competitive confiict to co-location or flnancial burden caused by
sharing such information normally will not be considered as an excuse to the duty of good
faith.
B. Third Party Technical Review: In the event a dispute arises as to whether a permittee has
exercised good faith in accommodating other users, the Town may require the applicant to
obtain a third party technical study at the applicant’s expense. The Town may review any
information submitted by the applicant and permittee(s) in determining whether good faith has
been exercised.
C. Exceptions: No co-location may be required where the shared use would or does result in
signiflcant interference in the broadcast or reception capabilities of the existing wireless
telecommunications facilities or failure of the existing wireless telecommunications facilities to
meet federal standards for emissions.
D. Violation; penalty: Failure to comply with co-location requirements when feasible may result
in denial of a permit request or revocation of an existing permit.
Section 17.1006 Removal of Abandoned Antennas and
TowersMaintenance and Operation
A. Removal of Abandoned Antennas and Towers. Any antenna or tower that is not operated
for a continuous period of ninety (90) days shall be considered abandoned, and the owner of
such antenna or tower shall remove the same within ninety (90) days of receipt of notice from
the Town of Fountain Hills notifying the owner of such abandonment. Failure to remove an
abandoned antenna or tower within said ninety (90) day period shall be grounds to remove the
tower or antenna at the owner's expense. If there are two or more users of a single tower, then
this provision shall not become effective until all users cease using the tower for the prescribed
period.
FB. State or Federal Requirements: All towers must meet or exceed current standards and
regulations of the FAA, the FCC, and any other agency of the state or federal government with
the authority to regulate towers and antennas. If such standards and regulations are changed,
then the owners of the towers and antennas governed by this chapter shall bring such towers
and antennas into compliance with such revised standards and regulations within six (6)
Page 33 of 36
months of the effective date of such standards and regulations, unless a different compliance
schedule is mandated by the controlling state or federal agency. Failure to bring towers and
antennas into compliance with such revised standards and regulations shall constitute grounds
for the removal of the tower or antenna at the owner's expense.
To ensure continuing compliance with such limits by all owners and/or operators of wireless
communication facilities within the Town, all owners, and operators of wireless communication
facilities shall submit reports as required by this section.
As set forth hereinbelow, the Town may additionally require, at the owner and/or operator’s
expense, independent veriflcation of the results of any analysis set forth within any reports
submitted to the Town by the owner and/or operator.
1. Certiflcation of Compliance with Applicable RF Radiation Limits
Within forty-flve (45) days of initial operation or a substantial modiflcation of a wireless
communication facility, the owner and/or operator of each telecommunications antenna
shall submit to the Development Services Director a written certiflcation by a licensed
professional engineer, sworn to under penalties of perjury, that the facility’s radio frequency
emissions comply with the limits codifled within 47 CFR §1.1310(e)(1), Table 1 Sections (i)
and (ii), as made applicable pursuant to 47 CFR §1.1310(e)(3).
The engineer shall measure the emissions of the approved facility, including the cumulative
impact from other nearby facilities, and determine if such emissions are within the limits
described hereinabove.
A report of these measurements and the engineer’s flndings with respect to compliance
with the FCC’s Maximum Permissible Exposure (MPE) limits shall be submitted to the
Development Services Director.
If the report shows that the facility does not comply with applicable limits, then the owner
and/or operator shall cease operation of the facility until the facility is brought into
compliance with such limits. Proof of compliance shall be a certiflcation provided by the
engineer who prepared the original report. The Town may require, at the applicant’s
expense, independent veriflcation of the results of the analysis.
2. Random RF Radiofrequency Testing
Page 34 of 36
At the operator’s expense, the Town may retain an engineer to conduct random
unannounced RF Radiation testing of such facilities to ensure the facility’s compliance with
the limits codifled within 47 CFR §1.1310(e)(1) et seq.
The Town may cause such random testing to be conducted as often as the Town may deem
appropriate. However, the Town may not require the owner and/or operator to pay for
more than one test per facility per calendar year unless such testing reveals that one or
more of the owner and/or operator’s facilities are exceeding the limits codifled within 47
CFR §1.1310(e)(1) et seq., in which case the Town shall be permitted to demand that the
facility be brought into compliance with such limits, and to conduct additional tests to
determine if, and when, the owner and/or operator thereafter brings the respective facility
and/or facilities into compliance.
If the Town at any time flnds that there is good cause to believe that a wireless
communication facility and/or one or more of its antennas are emitting RF radiation at
levels in excess of the legal limits permitted under 47 CFR §1.1310(e)(1) et seq., then a
hearing shall be scheduled before the Town’s Zoning Administrator at which the owner
and/or operator of such facility shall be required to show cause why any and all permits
and/or approvals issued by the Town for such facility and/or facilities should not be
revoked, and a flne should not be assessed against such owner and/or operator.
The owner and/or operator shall be afforded not less than two (2) weeks' written notice of
the hearing.
At such hearing, the burden shall be on the Town to show that, by a preponderance of the
evidence, the facilities emissions exceeded the permissible limits under 47 CFR §1.1310(e)(1)
et seq.
In the event that the Town establishes same, the owner and/or operator shall then be
required to establish, by clear and convincing evidence, that a malfunction of equipment
caused their failure to comply with the applicable limits through no fault on the part of the
owner/operator.
If the owner and/or operator fails to establish same, the Town shall have the power to
revoke any permit, building permit, and/or any other form of approval(s) which the Town
Council or any other representative of the Town may have then issued to the owner and/or
operator, for the respective facility. The Zoning Administrator may revoke an
Page 35 of 36
administrative approval. The decision of the Zoning Administrator may be appealed to the
Town Manager. If the tower or antenna was approved by the Town Council, revocation
will be considered by the Town Council in the same manner as the original approval.
In addition, the Town many issue a civil citation for non-compliance as provided in Section
1-8-3 of the Town Code.
In the event that an owner or operator of one or more wireless communication facility is
found to violate subparagraph 1. hereinabove three or more times within any flve (5) year
period, then in addition to revoking any zoning approvals for the facilities which were
violating the limits codifled in 47 CFR §1.1310(e)(1) et seq., the Town Council shall render a
determination within which it shall deem the owner/operator prohibited from flling any
applications for any new wireless personal services facilities within the Town for a period of
flve (5) years.
GC. Building Codes; Safety Standards: To ensure the structural integrity of towers, the owner
of a tower shall ensure that it is maintained in compliance with standards contained in
applicable state or local building codes and the applicable standards for towers that are
published by the Electronic Industries Association, as amended from time to time. If, upon
inspection, the Town of Fountain Hills concludes that a tower fails to comply with such codes
and standards and constitutes a danger to persons or property, then upon notice being
provided to the owner of the tower, the owner shall have thirty (30) days to bring such tower
into compliance with such standards. Failure to bring such tower into compliance within said
thirty (30) days shall constitute grounds for the removal of the tower or antenna at the owner's
expense.
D. Wireless facilities and all related equipment must comply with all noise regulations and
shall not exceed such regulations, either individually or collectively. Backup generators shall
only be operated during power outages and/or for testing and maintenance purposes between
the hours of 9:00 a.m. and 4:00 p.m.
Page 36 of 36
Section 17.1107 Nonconforming Uses
A. Not Expansion of Nonconforming Use: Towers that are constructed, and antennas that are
installed, in accordance with the provisions of this chapter shall not be deemed to constitute
the expansion of a nonconforming use or structure.
B. Pre-existing towers: Pre-existing towers shall be allowed to continue their usage as they
presently exist. Routine maintenance (including replacement with a new tower of like
construction and height) shall be permitted on such preexisting towers. New construction other
than routine maintenance on a preexisting tower shall comply with the requirements of this
chapter.
C. Rebuilding Damaged or Destroyed Nonconforming Towers or Antennas: Notwithstanding
other provisions of this chapter, bona flde nonconforming towers or antennas that are
damaged or destroyed may be rebuilt without having to flrst obtain a special use permit and
without having to meet the separation requirements specifled in Sections 17.037(A) and
17.07(B). The type, height, and location of the tower onsite shall be of the same type and
intensity as the original facility approval; provided, however, that any destroyed lattice or guyed
tower shall be replaced with a monopole structure only. Building permits to rebuild the facility
shall comply with the then applicable building codes and shall be obtained within ninety (90)
days from the date the facility is damaged or destroyed. If no permit is obtained or if said
permit expires, the tower or antenna shall be deemed abandoned as specifled in Section 17.16
A.0.
Page 1 of 28
Chapter 17
Wireless Telecommunications Towers and Antennas
Section 17.01 Purpose, Intent, and Applicability
A. The purpose of this ordinance is to establish general guidelines for the siting of wireless
communications towers and antennas. The goals of this ordinance are to:
1. Protect residential areas and land uses from potential adverse impacts of towers and
antennas;
2. Encourage the location of towers in nonresidential areas;
3. Minimize the total number of towers throughout the community;
4. Strongly encourage the joint use of new and existing tower sites as a primary option
rather than construction of additional single-use towers;
5. Encourage users of towers and antennas to locate them, to the extent possible, in areas
where the adverse impact on the community is minimal;
6. Encourage users of towers and antennas to conflgure them in a way that minimizes the
adverse visual impact of the towers and antennas through careful design, siting, landscape
screening, and innovative camoufiaging techniques;
7. Enhance the ability of the providers of telecommunications services to provide such
services to the community quickly, effectively, and efflciently;
8. Consider the public health and safety of communication towers; and
9. Avoid potential damage to adjacent properties from tower failure through engineering
and careful siting of tower structures.
In furtherance of these goals, Town of Fountain Hills shall give due consideration to the Town of
Fountain Hills General Plan, the Town of Fountain Hills Zoning Ordinance, existing land uses,
and environmentally sensitive areas in approving sites for the location of towers and antennas.
B. It is the intent of this ordinance:
Page 2 of 28
1. That no wireless communication towers or antenna be sited, constructed, reconstructed,
installed, materially changed, expanded, or used unless in conformity with this Chapter.
2. To achieve a balance between the need to provide wireless services with the health,
safety, and general welfare of the residents of Fountain Hills the by balancing four (4)
simultaneous objectives:
a. Enabling personal wireless service providers to provide adequate personal wireless
services throughout the Town so that Town residents can enjoy the beneflts of same,
from any FCC-licensed wireless carrier from which they choose to obtain such services;
b. Minimizing the number of cell towers and/or other personal wireless service facilities
needed to provide such coverage;
c. Preventing, to the greatest extent reasonably practical, any unnecessary adverse
impacts upon the Town’s communities, residential areas, and individual homes; and,
d. Complying with all the legal requirements which the Telecommunications Act of 1996,
as amended (“TCA”) imposes upon the Town, when the Town receives, processes and
determines applications seeking approvals for the siting, construction and operation of
cell towers and/or other personal wireless service facilities.
C. Applicability.
New Towers and Antennas: All new towers or antennas in Town of Fountain Hills shall be
subject to these regulations. The following exceptions apply:
1. Amateur Radio Station Operators/Receive Only Antennas. This ordinance shall not govern
any tower, or the installation of any antenna, that is under the maximum building height of
the zoning district in which such structure is located and which is owned and operated by a
federally-licensed amateur radio station operator or is used exclusively for receive only
operations.
2. Preexisting Towers or Antennas. Legally established preexisting towers and preexisting
antennas shall not be required to meet the requirements of this ordinance, other than the
requirements of Sections 17.06 B. and C.
3. AM Array. For purposes of implementing this ordinance, an AM array, consisting of one
or more tower units and supporting ground system which functions as one AM
Page 3 of 28
broadcasting antenna, shall be considered one tower. Measurements for setbacks and
separation distances shall be measured from the outer perimeter of the towers included in
the AM array. Additional tower units may be added within the perimeter of the AM array by
right.
4. Small Cell Towers in the Right-of-Way. Wireless communication towers and antenna
meeting the deflnition of small wireless facilities as contained in A.R.S. 9-591 are subject to
the requirements of Article 16-2, Small Wireless Facilities, of the Town Code.
5. Mobile or Temporary Towers. Mobile wireless facilities when placed on site for seven
(7) consecutive days or less, provided any necessary building permit or encroachment
permit is obtained.
Section 17.02 Definitions
As used in this ordinance, the following terms shall have the meanings set forth below:
Alternative Tower Structure: means man-made trees, clock towers, bell steeples, light poles and
similar alternative-design mounting structures that camoufiage or conceal the presence of
antennas or towers.
Antenna: means any exterior transmitting or receiving device mounted on a tower, building or
structure and used in communications that radiates or captures electromagnetic waves, digital
signals, analog signals, radio frequencies (excluding radar signals), wireless telecommunications
signals or other communication signals.
Backhaul network: means the lines that connect a provider's towers/cell sites to one or more
cellular telephone switching offlces, and/or long distance providers, or the public switched
telephone network.
Existing Structure: means light poles, power poles, chimneys, billboards, and other similar
structures, which are placed, within the Town at the time of adoption of this Chapter, except
existing buildings.
FAA: means the Federal Aviation Administration.
FCC: means the Federal Communications Commission.
Page 4 of 28
Height: means, when referring to a tower or other structure, the vertical distance measured
from the natural grade level to the highest point of the structure directly above the natural
grade when such structure is not located in a platted subdivision. If the structure is located in a
platted subdivision, the height shall be the vertical distance measured from the flnished grade
as shown on the subdivision grading plans or flnished grade as shown on the individual lot's
grading plans, (whichever is lower), to the highest point of the structure directly above the
flnished grade. In the event that terrain problems prevent an accurate determination of height,
the Zoning Administrator shall rule as to height and appeal from that decision shall be to the
Board of Adjustment.
Pre-existing towers and preexisting antennas: means any tower or antenna for which a building
permit has been properly issued prior to the effective date of this ordinance, including
permitted towers or antennas that have not yet been constructed so long as such approval is
current and not expired.
Tower: means any structure that is designed and constructed primarily for the purpose of
supporting one or more antennas for telephone, radio and similar communication purposes,
including self-supporting lattice towers, guyed towers, or monopole towers. The term includes
radio and television transmission towers, microwave towers, common-carrier towers, cellular
telephone towers, alternative tower structures, and the like. The term also includes the
structure and any support thereto.
Utility service antennas: means antenna attached to utility boxes, poles, switches, storage
tanks, etc. and used by a utility provider to facilitate the operation of the utility system.
Wireless communication: means the transmission of voice or data without cable or wires.
Wireless facility: means wireless communication facilities including, but not limited to, facilities
that transmit and/or receive electromagnetic signals for cellular radio telephone service,
personal communications services, enhanced specialized mobile services, paging systems, and
related technologies. Such facilities also include antennas, microwave dishes, parabolic
antennas, and all other types of equipment used in the transmission or reception of such
signals; telecommunication towers or similar structures supporting said equipment; associated
equipment cabinets and/or buildings; and all other accessory development used for the
provision of personal wireless services. These facilities do not include radio and television
broadcast towers and government-operated public safety networks.
Page 5 of 28
Section 17.03 Requirements
A. General Requirements
1. Principal or Accessory Use: Antennas and towers may be considered either principal or
accessory uses. A different existing use of an existing structure on the same lot shall not
preclude the installation of an antenna or tower on such lot.
2. Lot Size: For purposes of determining whether the installation of a tower or antenna
complies with district development regulations, including but not limited to setback
requirements, lot-coverage requirements, and other such requirements, the dimensions of
the entire lot shall control, even though the antennas or towers may be located on leased
parcels within such lot.
3. Aesthetics: Towers and antennas shall meet the following requirements:
a. Towers shall, subject to any applicable standards of the FAA, be painted a neutral
color so as to reduce visual obtrusiveness.
b. At a tower site, the design of the buildings and related structures shall, to the extent
possible, use materials; colors, textures, screening, and landscaping that will blend them
into the natural setting and surrounding buildings.
c. If an antenna is installed on a structure other than a tower, the antenna and
supporting electrical and mechanical equipment must be of a neutral color that is
identical to, or closely compatible with, the color of the supporting structure so as to
make the antenna and related equipment as visually unobtrusive as possible.
d. The choice of design for installing a new personal wireless service facility or the
substantial modiflcation of an existing personal wireless service facility shall be chosen
to minimize the potential adverse impacts that the new or expanded facility may, or is
likely to, infiict upon nearby properties.
Page 6 of 28
e. Unless speciflcally required by other regulations, a telecommunications tower shall
have a flnish (either painted or unpainted) that minimizes its degree of visual impact.
f. Accessory Structures
i. Accessory structures shall maximize the use of building materials, colors, and
textures designed to blend with the natural surroundings. The use of camoufiage
communications towers may be required by the Council to blend the
communications tower and/or its accessory structures further into the natural
surroundings. "Camoufiage" is deflned as the use of materials incorporated into the
communications tower design that give communications towers the appearance of
tree branches and bark coatings, church steeples and crosses, sign structures,
lighting structures, or other similar structures.
ii. Accessory structures shall be designed to be architecturally similar, compatible
with each other, and shall be no more than twelve (12) feet high. The buildings shall
be used only for housing equipment related to the particular site. Whenever
possible, the buildings shall be joined or clustered so as to appear as one building.
iii. No portion of any telecommunications tower or accessory structure shall be
used for a sign or other advertising purpose, including but not limited to the
company name, phone numbers, banners, and streamers, except the following. A
sign of no greater than two square feet indicating the name of the facility owner(s)
and a twenty-four-hour emergency telephone shall be posted adjacent to any entry
gate. In addition, "no trespassing" or other warning signs may be posted on the
fence. All signs shall conform to the sign requirements of the Town.
g. Towers must be placed to minimize visual impacts. Applicants shall place towers on
the side slope of the terrain so that, as much as possible, the top of the tower does not
protrude over the ridgeline, as seen from public ways.
h. Existing vegetation. Existing vegetation shall be preserved to the maximum extent
possible. No cutting of trees shall take place on a site connected with an application
made under this article prior to the approval of the special use permit use.
i. Screening.
Page 7 of 28
i. Tree plantings may be required to screen portions of the telecommunications
tower and accessory structures from nearby residential property as well as from
public sites known to include important views or vistas. Additional palm trees may
be required to accompany towers which use a palm tree stealth design.
ii. Where a site adjoins a residential property or public property, including streets,
screening suitable in type, size and quantity shall be required by the Town Council.
iii. The applicant shall demonstrate to the approving board that adequate
measures have been taken to screen and abate noise emanating from on-site
equipment, including but not limited to heating and ventilating units, air
conditioners, and emergency power generators. Telecommunications towers shall
comply with all applicable sections of this chapter as it pertains to noise control and
abatement.
j. Utility Services Antennas
i. For antenna placed in the Town’s right-of-way with the top of the antenna less
than six (6’) feet above ground level, the support structure and antenna shall be
painted a neutral color to blend with the surrounding area. If the top of the
antenna is six (6’) feet or more above ground level, the antenna and support
structure shall utilize the approve Saguaro cactus stealth design.
ii. For antenna placed on private property:
1. If placed on another utility structure such as a water tower, the antenna shall
be painted to blend with the building or equipment it placed on.
2. If a separate tower structure is used, the antenna design shall comply with the
provisions above in this section.
4. Lighting: Towers shall not be artiflcially lighted, unless required by the FAA or other
applicable authority. If lighting is required, the lighting alternatives and design chosen must
cause the least disturbance to the surrounding views.
Page 8 of 28
5. Measurement: For purposes of measurement, tower setbacks and separation distances
shall be calculated and applied to facilities located in the Town of Fountain Hills irrespective
of municipal and county jurisdictional boundaries.
6. Not Essential Services: Towers and antennas shall be regulated and permitted pursuant
to this chapter and shall not be regulated or permitted as essential services, public utilities,
or private utilities.
7. Franchises: Owners and/or operators of towers or antennas shall certify that all
franchises required by law for the construction and/or operation of a wireless
communication system in the Town of Fountain Hills have been obtained and shall flle a
copy of all required franchises with the Community Development Director.
8. Signs: No signs shall be allowed on an antenna or tower.
9. Co-location and Multiple Antenna/Tower Plan: The Town of Fountain Hills encourages
tower and antenna users to submit a single application for approval of multiple towers
and/or antenna sites and to submit applications, which utilize co-location with an existing
wireless telecommunications provider. Applications for approval of multiple sites or for co-
location with an existing provider shall be given priority in the review process.
10. Security fencing: Towers shall be enclosed by security fencing not less than six (6) feet
in height and no more than eight (8) feet in height, shall be constructed of a block or
masonry, and shall be equipped with an appropriate anti-climbing device; provided
however, that the Town Council may waive such requirements, as it deems appropriate.
11. Landscaping: The following requirements shall govern the landscaping surrounding
towers; provided, however, that the Town Council may waive such requirements if the goals
of this chapter would be better served thereby.
a. Tower facilities shall be landscaped with a buffer of plant materials that effectively
screens the view of the tower compound from residential property. The standard buffer
shall consist of a landscaped strip at least four (4) feet wide outside the perimeter of the
compound.
b. In locations where the visual impact of the tower would be minimal, the landscaping
requirement may be reduced or waived.
Page 9 of 28
c. Existing mature plant growth and natural landforms on the site shall be preserved to
the maximum extent possible.
13. Noise: Submission of applications for towers and associated equipment shall include
noise and acoustical information, prepared by a qualifled flrm or individual, for the base
transceiver station(s), equipment buildings, and associated equipment such as air
conditioning units and backup generators. The Town may require the applicant to
incorporate appropriate noise baffiing materials and/or strategies to avoid any ambient
noise from equipment reasonably likely to exceed the applicable noise regulations
contained in Section 11-1-7 of the Town Code.
14. Any information of an engineering nature that the applicant submits, whether civil,
mechanical, or electrical, shall be certifled by an Arizona Licensed Professional Engineer.
15. Application approval issued under this Chapter shall be conditioned upon veriflcation
by the Town Engineer or designee that such tower structure is structurally sound. Such
veriflcation shall be received by the applicant prior to submission.
B. Minimum Setbacks and Separations
1. Setbacks: The following setback requirements shall apply to all towers; provided,
however, that the Town Council may reasonably reduce the standard setback requirements
if the goals of this chapter would be better served thereby:
a. Towers must be set back a distance equal to at least one hundred percent (100%) of
the height of the tower from any adjoining lot line. Provided, however, that separation
distances from residential uses shall be in accordance with Table 1 set forth below.
b. Accessory buildings must satisfy the minimum zoning district setback requirements.
2. Separation: The following separation requirements shall apply to all towers and
antennas provided, however, that the Town Council may reasonably reduce the standard
separation requirements if the goals of this chapter would be better served thereby.
a. Separation from off-site uses/designated areas.
Page 10 of 28
i. Tower separation shall be measured from the base of the tower to the lot line of
the off-site uses and/or designated areas as specifled in Table 1, except as otherwise
provided in Table 1.
ii. Separation requirements for towers shall comply with the minimum standards
established in Table 1.
Table 1. Separation Requirements from Offsite Uses/Areas
Off-site Use/Designated Area Separation Distance
Single-family or duplex residential units1 200 feet or 300% of tower height, whichever is greater
Vacant single-family or duplex residentially zoned
land which is either platted or has preliminary plat
approval which is not expired
200 feet or 300% of tower height, whichever is greater2
Vacant unplatted residentially zoned lands3 100 feet or 100% of tower height, whichever is greater
Existing multifamily residential units greater than
duplex units
100 feet or 100% of tower height, whichever is greater
Nonresidentially zoned lands or nonresidential
uses
None, only setbacks apply
1 Includes modular homes and mobile homes used for living purposes.
2 Separation measured from base of tower to closest building setback line.
3 Includes any unplatted residential use properties without a valid preliminary subdivision plan or
valid development plan and any multifamily residentially zoned land greater than a duplex.
b. Separation distances between towers:
Separation distances between towers shall be applicable for and measured between the
proposed tower and preexisting towers. The separation distances shall be measured by
drawing or following a straight line between the base of the existing tower and the
proposed base, pursuant to a site plan, of the proposed tower. The separation distances
(listed in linear feet) shall be as shown in Table number 2.
Page 11 of 28
Table 2. Separation Distances between Towers
Monopole 65 ft. in
height or greater
Monopole less than 65
ft. in height but greater
than 40 ft. in height
Monopole less than
40 ft. in height
Monopole 65 ft. in height or
greater
2,000 feet 1,500 feet 1,000 feet
Monopole less than 65 ft. in height
but greater than 40 ft. in height
1,500 feet 1,500 feet 1,000 feet
Monopole less than 40 ft. in height 1,000 feet 1,000 feet 750 feet
C. Buildings or Other Equipment Storage
1. Antennas Mounted on Structures or Rooftops: The equipment cabinet or structure used
in association with antennas shall comply with the following:
a. The cabinet or structure shall not contain more than one hundred-twenty (120)
square feet of gross fioor area or be more than eight (8) feet in height and shall be
located on the ground.
b. Equipment storage buildings or cabinets shall comply with all applicable building
codes.
2. Antennas Mounted on Utility Poles, Light Poles, or Towers: The equipment cabinet or
structure used in association with antennas shall be located in accordance with the
following:
a. In residential districts, the equipment cabinet or structure may be located:
i. In a required front yard or required street side yard, provided the cabinet
structure is no greater than three and one-half (3.5) feet in height and twenty (20)
square feet of gross fioor area and the cabinet/structure is located a minimum of
three (3) feet from all lot lines. The cabinet/structure shall be screened by sight
obscuring landscaping which obscures at least ninety-flve percent (95%) of the
Page 12 of 28
structure at planting and throughout the duration of the cabinet or structure’s
existence with an ultimate height not to exceed forty-two (42) inches.
ii. In a required rear yard, provided the cabinet or structure is no greater than flve
(5) feet in height or one hundred-twenty (120) square feet in gross fioor area. The
cabinet/structure shall be screened by sight obscuring landscaping which obscures
at least ninety-flve percent (95%) of the structure at planting and throughout the
duration of the cabinet or structure’s existence with an ultimate height of six (6) feet.
iii. The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure.
b. In commercial or industrial districts the equipment cabinet or structure shall be no
greater than fourteen (14) feet in height or three hundred (300) square feet in gross
fioor area. The structure or cabinet shall be screened by sight-obscuring landscaping
with an ultimate height of sixteen (16) feet and a planted height of at least six (6) feet.
The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure. Such access way shall not
face residentially zoned property.
3. Modiflcation of Building Size Requirements: The requirements of Sections 17.08(A)
through (C) may be modifled by the Town Council in the case of uses permitted by special
use to encourage collocation.
D. Co-location
1. Any new telecommunications tower shall be designed to accommodate future shared
use by other communications providers.
2. Good Faith: Applicants and permittees shall cooperate and exercise good faith in co-
locating wireless telecommunications facilities on the same support structures or site, if the
Town so requests. Good faith shall include sharing technical information to evaluate the
feasibility of co-location, and may include negotiations for erection of a replacement
support structure to accommodate co-location. A competitive confiict to co-location or
flnancial burden caused by sharing such information normally will not be considered as an
excuse to comply with this section.
Page 13 of 28
3. Third Party Technical Review: In the event a dispute arises as to whether a permittee has
exercised good faith in accommodating other users, the Town may require the applicant to
obtain a third party technical study at the applicant’s expense. The Town may review any
information submitted by the applicant and permittee(s) in determining whether good faith
has been exercised.
4. Exceptions: No co-location may be required where the shared use would or does result
in signiflcant interference in the broadcast or reception capabilities of the existing wireless
telecommunications facilities or failure of the existing wireless telecommunications facilities
to meet federal standards for emissions.
5. Violation; penalty: Failure to comply with co-location requirements when feasible may
result in denial of a permit request or revocation of an existing permit.
Section 17.04 Application Types
A. Administrative: The following types of applications are processed administratively by staff:
1. Applications to change or modify an antenna on an existing administratively approved
tower that remains in compliance with all ordinance requirements.
2. Applications to change or modify an antenna on an existing tower approved through
public review, provided that the modiflcation will not:
a. Increase the approved height of the supporting structure by more than 10% or twenty
(20) feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than 50%;
c. Increase the original approved square footage of accessory buildings by more than
200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
Page 14 of 28
e. Expand the footprint of said support structure; or
f. Potentially cause signiflcant adverse impacts on the existing support structure or the
surrounding area.
3. Applications for co-location of additional antenna for an additional service provider on an
existing administratively approved tower that remains in compliance with all ordinance
requirements.
4. Applications for co-location of additional antenna for an additional service provider on an
existing tower approved through public review, provided that the modiflcation will not:
a. Increase the approved height of the supporting structure by more than 10% or twenty
(20) feet, whichever is greater;
b. Cause the original approved number of antennas to be exceeded by more than 50%;
c. Increase the original approved square footage of accessory buildings by more than
200 square feet;
d. Add new, additional, or larger microwave antenna dishes;
e. Expand the footprint of said support structure; or
f. Potentially cause signiflcant adverse impacts on the existing support structure or the
surrounding area.
5. Applications for new utility service antenna that comply with the height and setback
requirements of the zoning district in which they are located.
6. Applications for mobile or temporary wireless facilities for more than seven (7)
consecutive days.
Page 15 of 28
7. Applications for new towers in the following locations:
a. Town property with the tower located at least three hundred (300’) from residentially
zoned property.
b. On non-residentially zoned property and located at least three hundred feet (300’)
from residentially zoned property.
c. Alternative tower structures when such structures and their accompanying
equipment are appropriately blended into the surrounding terrain, are within the height
limitations of the underlying zoning district, and are at least three hundred feet (300’)
from residentially zoned property.
B. Public Review: The following types of applications require review and approval by the Town
Council:
1. Towers on Town property when the tower will be located less than 300’ of residentially
zoned property.
2. All other towers and antenna not meeting the requirements in Sec. 17.04 A or Sec. 17.04
B 1.
Section 17.05 Application Submittal, Review, and Processing
A. General: The following provisions shall govern the review of all wireless communication
facility applications:
1. Complete Application. Applications for wireless communication facilities shall be flled
electronically on the Town’s website by an owner of real property and shall contain the
area proposed for the wireless communication facility using the process established by the
Director for such applications. All such applications shall include the information required
in this section. Applications flled on behalf of the property owner by a third party shall
include a statement from the property owner authorizing the submittal of the application.
Page 16 of 28
2. Applications shall include documentation of compliance with items listed in Section 17.03
A as applicable to the application submitted.
3. Inventory of Existing Sites: Each applicant for a new tower or co-location of new antenna
on an existing tower shall provide to the Development Services Director an inventory of its
existing towers, antennas, or sites approved for towers or antennas, that are either within
the jurisdiction of the Town of Fountain Hills or within one mile of the border thereof,
including speciflc information about the location, height, and design of each tower. Each
applicant shall also provide a one-year build-out plan for all other wireless communications
facilities within the Town. The Development Services Director may share such information
with other applicants applying for administrative approvals or special use permits under
this ordinance or with other organizations seeking to locate antennas within the jurisdiction
of Town of Fountain Hills, provided, however that the Development Services Director is not,
by sharing such information, in any way representing or warranting that such sites are
available or suitable.
4. Utility Service Antennas:
a. Located in public right-of-way. These types of application are reviewed and
approved through the Town’s Encroachment Permit process as provided in Town Code
Article 16-1, Encroachments.
b. Located on property owned by the utility company.
i. If the antenna complies with the height requirements of the underlying zoning
district, the plans for the antenna will be reviewed and approved with the overall site
development plans if the site is being developed concurrently. If the antenna is
being added to an existing utility site, the plans will be reviewed and processed
consistent with the requirements of Section 17.05 C.
ii. If the antenna does not comply with the height requirements of the underlying
zoning district, the plans for the antenna will be reviewed and processed consistent
with the requirements of Section 17.05 D.
5. Applications Using Existing Towers:
a. Dimensioned, to-scale drawings showing the existing and proposed antenna on the
tower including the height of the tower and the antennas.
Page 17 of 28
b. The number and type of existing and proposed antenna.
c. Engineering calculations documenting the structural changes and certifying the
tower’s ability to carry the new antennas.
d. Dimensioned, to-scale drawings illustrating modiflcation of ground equipment, if
any.
6. Applications Using New Towers:
Information required. In addition to any information required for applications for special use
permits pursuant to Chapter 2, Section 2.02 of this Zoning Ordinance, applicants for a
special use permit for a tower shall submit the following information:
a. A site Plan as required in Section 2.04 plus zoning, General Plan classiflcation of the
site and all properties within the applicable separation distances set forth in Section
17.03 B., adjacent roadways, proposed means of access, elevation drawings of the
proposed tower and any other structures, photo simulations showing the tower in the
proposed location from at least four directions, and other information deemed by the
Development Services Director to be necessary to assess compliance with this chapter.
b. The setback distance between the proposed tower and the nearest residential unit
and residentially zoned properties.
c. The separation distance from other towers described in the inventory of existing
sites submitted pursuant to Section 17.03 B. shall be shown on an updated site plan or
map. The applicant shall also identify the type of construction of the existing tower(s)
and the owner/operator of the existing tower(s), if known.
d. Method of fencing, and flnished color and, if applicable, the method of camoufiage
and illumination.
e. A description of compliance with Sections 17.03 C. 3, 4, 5, 7, 8, 9, 10, 11, and 17.03 B.
and 17.05 A. 3, and 17.06 A. and B., and all applicable federal, state or local laws.
f. A notarized statement by the applicant as to whether construction of the tower will
accommodate collocation of additional antennas for future users.
Page 18 of 28
g. Identiflcation of the entities providing the backhaul network for the tower(s)
described in the application and other cellular sites owned or operated by the applicant
in the municipality.
h. A description of the suitability of the use of existing towers, other structures or
alternative technology not requiring the use of towers or structures to provide the
services to be provided through the use of the proposed new tower.
i. A description of the feasible alternative location(s) of future towers or antennas
within the Town of Fountain Hills based upon existing physical, engineering,
technological or geographical limitations in the event the proposed tower is erected.
j. A statement of compliance with Federal Communications Commission (FCC) Radio
Frequency (RF) exposure standards.
7. Filing Fee. Payment of a flling fee in an amount established by a schedule adopted by
resolution of the Council and flled in the offlces of the Town Clerk. No part of the flling fee
shall be returnable.
B. Shot Clocks and Tolling.
To comply with the requirements of Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA, the following
shot clock periods set forth herein below shall be presumed to be reasonable periods within
which the Town shall render determinations upon applications for wireless communication
facilities.
The Town shall render determinations upon such applications within the periods set forth
hereinbelow, unless the applicable shot clock period listed below is tolled, extended by
agreement or the processing of the application is delayed due to circumstances beyond the
Town’s controls.
1. Application Shot Clocks.
a. Receipt of Initial Application. Upon receipt of an application, the Development
Services Director, or designee, shall review the application for completeness. If the
Director determines the application is: (a) incomplete, (b) missing required application
materials, (c) is the wrong type of application, or (d) is otherwise defective, then, within
ten (10) days for administrative applications and thirty (30) days for public hearing
Page 19 of 28
applications of the Town’s receipt of the application, the Director, or their designee, shall
notify the applicant of the flnding and state what is needed to have a complete
application.
The notice of incompleteness shall toll the shot clock, which shall not thereafter resume
running unless and until the applicant tenders an additional submission to the Director
to remedy the issues identifled in the notice of incomplete application. The submission
of any responsive materials by the applicant shall automatically cause the shot clock
period to resume running.
If upon receipt of any additional materials from the applicant, the Director determines
that the application is still incomplete and/or defective, then the Director shall, once
again notify the applicant within ten (10) days for administrative applications and thirty
(30) days for public hearing applications of the applicant having flled its supplemental or
corrected materials to the Town and the shot clock shall once again be tolled, and the
same procedure provided for hereinabove shall be repeated.
b. Application Review. The shock clock for Administrative applications which do not
involve new towers is ninety (90) days. The shot clock for Administrative applications
with new towers and Public Review applications is one hundred flfty (150) days.
2. Shot Clock Tolls, Extensions & Reasonable Delay Periods
Consistent with the letter and intent of Section 47 U.S.C. §332(c)(7)(B)(ii) of the TCA, each of
the shot clock periods set forth within Section 17.05 B. hereinabove shall generally be
presumed to be sufflcient periods within which the Town shall render decisions upon
applications.
Notwithstanding same, the applicable shot clock periods may be tolled, extended by mutual
agreement between any applicant and/or its representative and the Town, and the Town
shall not be required to render its determination within the shot clock period presumed to
be reasonable for each type of application, where the processing of such application is
reasonably delayed, as described hereinbelow.
a. Tolling of the Applicable Shot Clock Due to Incompleteness and/or Applicant
Error
Page 20 of 28
As provided for within Section 17.05 B. 1. hereinabove, in the event that the
Development Services Director deems an application incomplete, the Director shall send
a Notice of Incompleteness to the applicant to notify the applicant that its application is
incomplete and/or contains material errors, and shall reasonably identify the missing
information and/or documents and/or the error(s) in the application.
If the Director sends a Notice of Incompleteness as described hereinabove, the
applicable shot clock shall automatically be tolled, meaning that the applicable shot
clock period within which the Town is required to render a flnal decision upon the
application shall immediately cease running, and shall not resume running, unless and
until the Town receives a responsive submission from the applicant.
If and when the applicant thereafter submits additional information in an effort to
complete its application, or cure any identifled defect(s), then the shot clock shall
automatically resume running, but shall not be deemed to start running anew.
The applicable shot clock period shall, once again, be tolled if the Director thereafter
provides a second notice that the application is still incomplete or defective, despite any
additional submissions which have been received by the Town, from the applicant, up to
that point.
b. Shot Clock Extension by Mutual Agreement
The Town shall be free to extend any applicable shot clock period by mutual agreement
with any respective applicant. This discretion on the part of the Town shall include the
Town’s authority to request, at any time, and for any period of time the Town may deem
reasonable or appropriate under the circumstances, consent from a respective
applicant to extend the applicable shot clock period to enable the Town, the applicant,
or any relevant third party, to complete any type of undertaking or task related to the
review, analysis, processing, and determination of the particular application, which is
then pending before the Town, to the extent that any such Undertaking, task, or review
is consistent with, or reasonably related to, compliance with any federal, state, or local
law and/or the requirements of any provision of the Town Code, including but not
limited to this Chapter.
In response to any request by the Town, the applicant, by its principal, agent, attorney,
site acquisition agent, or other authorized representative, can consent to any extension
Page 21 of 28
of any applicable shot clock by afflrmatively indicating its consent either in writing or by
afflrmatively indicating its consent on the record at any public hearing or public
meeting. The Town shall be permitted to reasonably rely upon a representative of the
applicant indicating that they are authorized to grant such consent on behalf of the
respective applicant, on whose behalf they have been addressing the Town within the
review process.
c. Reasonable Delay Extensions of Shot Clock Periods
The Town recognizes that there may be situations wherein, due to circumstances
beyond the control of the Town and/or the Town Council, the review and issuance of a
flnal decision upon an application for a wireless communication facility cannot
reasonably be completed within the application shot clock periods delineated within
Section 17.05 B hereinabove.
If, despite the exercise of due diligence by the Town, the determination regarding a
speciflc application cannot reasonably be completed within the applicable shot clock
period, the Town shall be permitted to continue and complete its review and issue its
determination at a date beyond the expiration of the applicable period, if the delay of
such flnal decision is due to circumstances including, but not limited to, those
enumerated hereinbelow, each of which shall serve as a reasonable basis for a
reasonable delay of the applicable shot clock period.
i. In the event that the rendering of a flnal decision upon an application under this
Chapter is delayed due to natural and/or unnatural events and/or forces which are
not within the control of the Town, such as the unavoidable delays experienced in
government processes due to the COVID 19 pandemic, and/or mandatory
compliance with any related federal or state government orders issued in relation
thereto, such delays shall constitute reasonable delays which shall be recognized as
acceptable grounds for extending the period for review and the rendering of flnal
determinations beyond the period allotted under the applicable shot clock.
ii. In the event that applicant tenders eleventh-hour submissions to the Town in
the form of (a) expert reports, (b) expert materials, and/or (c) materials which
require a signiflcant period for review due either to their complexity or the sheer
volume of materials which an applicant has chosen to provide to the Town at such
Page 22 of 28
late point in the proceedings, the Town shall be afforded a reasonable time to
review such late-submitted materials.
If reasonably necessary, the Town shall be permitted to retain the services of an
expert consultant to review any late-submitted expert reports which were provided
to the Town, even if such review or services extend beyond the applicable shot clock
period, so long as the Town completes such review and retains and secures such
expert services within a reasonable period of time thereafter and otherwise acts
with reasonable diligence in completing its review and rendering its flnal decision.
C. Review and Processing of Applications
1. Conformity to the following shall be considered in review of all applications:
a. The application is consistent with the objectives of this ordinance.
b. The height of the proposed tower.
c. The adequacy of the proposed site, considering such factors as the sufficiency of the
size of the site to comply with the established criteria, the configuration of the site, and
the extent to which the site is formed by logical boundaries (e.g., topography, natural
features, streets, relationship of adjacent uses, etc.) that provide for the ability to
comply with the provisions of this ordinance.
d. The extent to which the proposal responds to the impact of the proposed
development on adjacent land uses, especially in terms of visual impact.
e. The extent to which the proposed telecommunications facility is camouflaged (i.e.,
use of stealth technology).
f. The extent to which the proposed facility is integrated with existing structures (i.e.,
buildings, signs, utility poles, etc.) with particular reference to design characteristics that
have the effect of reducing or eliminating visual obtrusiveness.
g. An applicant's compliance with all town requirements with respect to previous
applications.
2. Review of Administrative Applications.
Page 23 of 28
a. Administrative applications will be reviewed by staff using the Town’s standard
permit plan review processes. Applications for new towers shall provide staff with the
same information as required in Section 17.05 C 3 for Public Review Applications.b.
Applications for mobile or temporary wireless facilities which remain in place for more
than seven (7) consecutive days must submit a request for a Temporary Use Permit as
provided in Section 2.03 of the Zoning Ordinance.
3. Review and Processing of Public Review Applications
a. Applications which require public hearing review and approval will be processed using
the requirements listed in Section 2.02 of the Town’s Zoning Ordinance for Special Use
Permits.
b. In addition to the factors listed in 7.05 C 1 for review of applications, public review
applications will also be subject to the standards for consideration of special use
permit applications pursuant to Chapter 2, Section 2.02 of this Zoning Ordinance
c. Availability of Suitable Existing Towers, Other Structures, or Alternative Technology:
No new tower shall be permitted unless the applicant demonstrates to the reasonable
satisfaction of the Town Council that no existing tower, structure or alternative
technology that does not require the use of towers or structures can accommodate the
applicant's a proposed antenna. An applicant shall submit information requested by
the Town Council related to the availability of suitable existing towers, other structures
or alternative technology. Evidence submitted to demonstrate that no existing tower,
structure or alternative technology can accommodate the applicant's proposed
antenna may consist of any of the following:
i. No existing towers or structures are located within the geographic area, which
meet applicant's engineering requirements.
ii. Existing towers or structures are not of sufflcient height to meet applicant's
engineering requirements.
iii. Existing towers or structures do not have sufflcient structural strength to
support applicant's proposed antenna and related equipment.
iv. The applicant's proposed antenna would cause electromagnetic interference
with the antenna on the existing towers or structures, or the antenna on the existing
Page 24 of 28
towers or structures would cause interference with the applicant's proposed
antenna.
v. The fees, costs, or contractual provisions required by the owner in order to share
an existing tower or structure or to adapt an existing tower or structure for sharing
are unreasonable. Costs exceeding new tower development are presumed to be
unreasonable.
vi. The applicant demonstrates that there are other limiting factors that render
existing towers and structures unsuitable.
vii. The applicant demonstrates that an alternative technology that does not require
the use of towers or structures, such as a cable micro cell network using multiple
low-powered transmitters/receivers attached to a wire line system, is unsuitable.
Costs of alternative technology that exceed new tower or antenna development
shall not be presumed to render the technology unsuitable.
viii. If the applicant asserts a claim that a proposed facility is necessary to remedy
one or more existing signiflcant gaps in an identifled wireless carrier’s personal
wireless services, the Council may require the applicant to provide drive-test
generated coverage maps, as opposed to computer-generated coverage maps, for
each frequency at which the carrier provides personal wireless services, to show
signal strengths in bins of three (3) DBM each, to enable the Council to assess the
existence of such signiflcant gaps accurately, and/or whether the carrier possesses
adequate coverage within the geographic area which is the subject of the respective
application.
4. In granting a permit, the Town may impose conditions to the extent such conditions are
necessary to minimize any adverse effect of the proposed tower on adjoining properties.
Section 17.06 Maintenance and Operation
A. Removal of Abandoned Antennas and Towers. Any antenna or tower that is not operated
for a continuous period of ninety (90) days shall be considered abandoned, and the owner of
such antenna or tower shall remove the same within ninety (90) days of receipt of notice from
the Town of Fountain Hills notifying the owner of such abandonment. Failure to remove an
Page 25 of 28
abandoned antenna or tower within said ninety (90) day period shall be grounds to remove the
tower or antenna at the owner's expense. If there are two or more users of a single tower, then
this provision shall not become effective until all users cease using the tower for the prescribed
period.
B. State or Federal Requirements: All towers must meet or exceed current standards and
regulations of the FAA, the FCC, and any other agency of the state or federal government with
the authority to regulate towers and antennas. If such standards and regulations are changed,
then the owners of the towers and antennas governed by this chapter shall bring such towers
and antennas into compliance with such revised standards and regulations within six (6)
months of the effective date of such standards and regulations, unless a different compliance
schedule is mandated by the controlling state or federal agency. Failure to bring towers and
antennas into compliance with such revised standards and regulations shall constitute grounds
for the removal of the tower or antenna at the owner's expense.
To ensure continuing compliance with such limits by all owners and/or operators of wireless
communication facilities within the Town, all owners, and operators of wireless communication
facilities shall submit reports as required by this section.
As set forth hereinbelow, the Town may additionally require, at the owner and/or operator’s
expense, independent veriflcation of the results of any analysis set forth within any reports
submitted to the Town by the owner and/or operator.
1. Certiflcation of Compliance with Applicable RF Radiation Limits
Within forty-flve (45) days of initial operation or a substantial modiflcation of a wireless
communication facility, the owner and/or operator of each telecommunications antenna
shall submit to the Development Services Director a written certiflcation by a licensed
professional engineer, sworn to under penalties of perjury, that the facility’s radio frequency
emissions comply with the limits codifled within 47 CFR §1.1310(e)(1), Table 1 Sections (i)
and (ii), as made applicable pursuant to 47 CFR §1.1310(e)(3).
The engineer shall measure the emissions of the approved facility, including the cumulative
impact from other nearby facilities, and determine if such emissions are within the limits
described hereinabove.
Page 26 of 28
A report of these measurements and the engineer’s flndings with respect to compliance
with the FCC’s Maximum Permissible Exposure (MPE) limits shall be submitted to the
Development Services Director.
If the report shows that the facility does not comply with applicable limits, then the owner
and/or operator shall cease operation of the facility until the facility is brought into
compliance with such limits. Proof of compliance shall be a certiflcation provided by the
engineer who prepared the original report. The Town may require, at the applicant’s
expense, independent veriflcation of the results of the analysis.
2. Random RF Radiofrequency Testing
At the operator’s expense, the Town may retain an engineer to conduct random
unannounced RF Radiation testing of such facilities to ensure the facility’s compliance with
the limits codifled within 47 CFR §1.1310(e)(1) et seq.
The Town may cause such random testing to be conducted as often as the Town may deem
appropriate. However, the Town may not require the owner and/or operator to pay for
more than one test per facility per calendar year unless such testing reveals that one or
more of the owner and/or operator’s facilities are exceeding the limits codifled within 47
CFR §1.1310(e)(1) et seq., in which case the Town shall be permitted to demand that the
facility be brought into compliance with such limits, and to conduct additional tests to
determine if, and when, the owner and/or operator thereafter brings the respective facility
and/or facilities into compliance.
If the Town at any time flnds that there is good cause to believe that a wireless
communication facility and/or one or more of its antennas are emitting RF radiation at
levels in excess of the legal limits permitted under 47 CFR §1.1310(e)(1) et seq., then a
hearing shall be scheduled before the Town’s Zoning Administrator at which the owner
and/or operator of such facility shall be required to show cause why any and all permits
and/or approvals issued by the Town for such facility and/or facilities should not be
revoked, and a flne should not be assessed against such owner and/or operator.
The owner and/or operator shall be afforded not less than two (2) weeks' written notice of
the hearing.
Page 27 of 28
At such hearing, the burden shall be on the Town to show that, by a preponderance of the
evidence, the facilities emissions exceeded the permissible limits under 47 CFR §1.1310(e)(1)
et seq.
In the event that the Town establishes same, the owner and/or operator shall then be
required to establish, by clear and convincing evidence, that a malfunction of equipment
caused their failure to comply with the applicable limits through no fault on the part of the
owner/operator.
If the owner and/or operator fails to establish same, the Town shall have the power to
revoke any permit, building permit, and/or any other form of approval(s) which the Town
Council or any other representative of the Town may have then issued to the owner and/or
operator, for the respective facility. The Zoning Administrator may revoke an
administrative approval. The decision of the Zoning Administrator may be appealed to the
Town Manager. If the tower or antenna was approved by the Town Council, revocation
will be considered by the Town Council in the same manner as the original approval.
In addition, the Town many issue a civil citation for non-compliance as provided in Section
1-8-3 of the Town Code.
In the event that an owner or operator of one or more wireless communication facility is
found to violate subparagraph 1. hereinabove three or more times within any flve (5) year
period, then in addition to revoking any zoning approvals for the facilities which were
violating the limits codifled in 47 CFR §1.1310(e)(1) et seq., the Town Council shall render a
determination within which it shall deem the owner/operator prohibited from flling any
applications for any new wireless personal services facilities within the Town for a period of
flve (5) years.
C. Building Codes; Safety Standards: To ensure the structural integrity of towers, the owner of
a tower shall ensure that it is maintained in compliance with standards contained in applicable
state or local building codes and the applicable standards for towers that are published by the
Electronic Industries Association, as amended from time to time. If, upon inspection, the Town
of Fountain Hills concludes that a tower fails to comply with such codes and standards and
constitutes a danger to persons or property, then upon notice being provided to the owner of
the tower, the owner shall have thirty (30) days to bring such tower into compliance with such
standards. Failure to bring such tower into compliance within said thirty (30) days shall
constitute grounds for the removal of the tower or antenna at the owner's expense.
Page 28 of 28
D. Wireless facilities and all related equipment must comply with all noise regulations and
shall not exceed such regulations, either individually or collectively. Backup generators shall
only be operated during power outages and/or for testing and maintenance purposes between
the hours of 9:00 a.m. and 4:00 p.m.
Section 17.07 Nonconforming Uses
A. Not Expansion of Nonconforming Use: Towers that are constructed, and antennas that are
installed, in accordance with the provisions of this chapter shall not be deemed to constitute
the expansion of a nonconforming use or structure.
B. Pre-existing towers: Pre-existing towers shall be allowed to continue their usage as they
presently exist. Routine maintenance (including replacement with a new tower of like
construction and height) shall be permitted on such preexisting towers. New construction other
than routine maintenance on a preexisting tower shall comply with the requirements of this
chapter.
C. Rebuilding Damaged or Destroyed Nonconforming Towers or Antennas: Notwithstanding
other provisions of this chapter, bona flde nonconforming towers or antennas that are
damaged or destroyed may be rebuilt without having to flrst obtain a special use permit and
without having to meet the separation requirements specifled in Sections 17.03. The type,
height, and location of the tower onsite shall be of the same type and intensity as the original
facility approval; provided, however, that any destroyed lattice or guyed tower shall be replaced
with a monopole structure only. Building permits to rebuild the facility shall comply with the
then applicable building codes and shall be obtained within ninety (90) days from the date the
facility is damaged or destroyed. If no permit is obtained or if said permit expires, the tower or
antenna shall be deemed abandoned as specifled in Section 17.16 A.
Chapter 17
Wireless Telecommunications Towers and Antennas
Section 17.01 Purpose
The purpose of this ordinance is to establish general guidelines for the siting of wireless
communications towers and antennas. The goals of this ordinance are to: (1) protect residential
areas and land uses from potential adverse impacts of towers and antennas; (2) encourage the
location of towers in nonresidential areas; (3) minimize the total number of towers throughout
the community; (4) strongly encourage the joint use of new and existing tower sites as a
primary option rather than construction of additional single-use towers; (5) encourage users of
towers and antennas to locate them, to the extent possible, in areas where the adverse impact
on the community is minimal; (6) encourage users of towers and antennas to conflgure them in
a way that minimizes the adverse visual impact of the towers and antennas through careful
design, siting, landscape screening, and innovative camoufiaging techniques; (7) enhance the
ability of the providers of telecommunications services to provide such services to the
community quickly, effectively, and efficiently; (8) consider the public health and safety of
communication towers; and (9) avoid potential damage to adjacent properties from tower
failure through engineering and careful siting of tower structures. In furtherance of these goals,
Town of Fountain Hills shall give due consideration to the Town of Fountain Hills General Plan,
the Town of Fountain Hills Zoning Ordinance, existing land uses, and environmentally sensitive
areas in approving sites for the location of towers and antennas.
Section 17.02 Definitions
As used in this ordinance, the following terms shall have the meanings set forth below:
Alternative Tower Structure: means man-made trees, clock towers, bell steeples, light poles and
similar alternative-design mounting structures that camoufiage or conceal the presence of
antennas or towers.
Antenna: means any exterior transmitting or receiving device mounted on a tower, building or
structure and used in communications that radiates or captures electromagnetic waves, digital
signals, analog signals, radio frequencies (excluding radar signals), wireless telecommunications
signals or other communication signals.
Backhaul network: means the lines that connect a provider's towers/cell sites to one or more
cellular telephone switching offices, and/or long distance providers, or the public switched
telephone network.
Existing Structure: means light poles, power poles, chimneys, billboards, and other similar
structures, which are placed, within the Town at the time of adoption of this Chapter, except
existing buildings.
FAA: means the Federal Aviation Administration.
FCC: means the Federal Communications Commission.
Height: means, when referring to a tower or other structure, the vertical distance measured
from the natural grade level to the highest point of the structure directly above the natural
grade when such structure is not located in a platted subdivision. If the structure is located in a
platted subdivision, the height shall be the vertical distance measured from the flnished grade
as shown on the subdivision grading plans or flnished grade as shown on the individual lot's
grading plans, (whichever is lower), to the highest point of the structure directly above the
flnished grade. In the event that terrain problems prevent an accurate determination of height,
the Zoning Administrator shall rule as to height and appeal from that decision shall be to the
Board of Adjustment.
Pre-existing towers and preexisting antennas: means any tower or antenna for which a building
permit has been properly issued prior to the effective date of this ordinance, including
permitted towers or antennas that have not yet been constructed so long as such approval is
current and not expired.
Tower: means any structure that is designed and constructed primarily for the purpose of
supporting one or more antennas for telephone, radio and similar communication purposes,
including self-supporting lattice towers, guyed towers, or monopole towers. The term includes
radio and television transmission towers, microwave towers, common-carrier towers, cellular
telephone towers, alternative tower structures, and the like. The term also includes the
structure and any support thereto.
Section 17.03 Applicability
A. New Towers and Antennas: All new towers or antennas in Town of Fountain Hills shall be
subject to these regulations.
B. Exceptions:
1. Amateur Radio Station Operators/Receive Only Antennas. This ordinance shall not govern
any tower, or the installation of any antenna, that is under the maximum building height of
the zoning district in which such structure is located and which is owned and operated by a
federally-licensed amateur radio station operator or is used exclusively for receive only
operations.
2. Preexisting Towers or Antennas. Legally established preexisting towers and preexisting
antennas shall not be required to meet the requirements of this ordinance, other than the
requirements of Sections 17.04(F) & (G).
3. AM Array. For purposes of implementing this ordinance, an AM array, consisting of one
or more tower units and supporting ground system which functions as one AM
broadcasting antenna, shall be considered one tower. Measurements for setbacks and
separation distances shall be measured from the outer perimeter of the towers included in
the AM array. Additional tower units may be added within the perimeter of the AM array by
right.
Section 17.04 General Requirements
A. Principal or Accessory Use: Antennas and towers may be considered either principal or
accessory uses. A different existing use of an existing structure on the same lot shall not
preclude the installation of an antenna or tower on such lot.
B. Lot Size: For purposes of determining whether the installation of a tower or antenna
complies with district development regulations, including but not limited to setback
requirements, lot-coverage requirements, and other such requirements, the dimensions of the
entire lot shall control, even though the antennas or towers may be located on leased parcels
within such lot.
C. Inventory of Existing Sites: Each applicant for an antenna and/or tower shall provide to the
Community Development Director an inventory of its existing towers, antennas, or sites
approved for towers or antennas, that are either within the jurisdiction of the Town of Fountain
Hills or within one mile of the border thereof, including speciflc information about the location,
height, and design of each tower. Each applicant shall also provide a one-year build-out plan for
all other wireless communications facilities within the Town. The Community Development
Director may share such information with other applicants applying for administrative
approvals or special use permits under this ordinance or with other organizations seeking to
locate antennas within the jurisdiction of Town of Fountain Hills, provided, however that the
Community Development Director is not, by sharing such information, in any way representing
or warranting that such sites are available or suitable.
D. Aesthetics: Towers and antennas shall meet the following requirements:
1. Towers shall, subject to any applicable standards of the FAA, be painted a neutral color
so as to reduce visual obtrusiveness.
2. At a tower site, the design of the buildings and related structures shall, to the extent
possible, use materials; colors, textures, screening, and landscaping that will blend them
into the natural setting and surrounding buildings.
3. If an antenna is installed on a structure other than a tower, the antenna and supporting
electrical and mechanical equipment must be of a neutral color that is identical to, or
closely compatible with, the color of the supporting structure so as to make the antenna
and related equipment as visually unobtrusive as possible.
E. Lighting: Towers shall not be artiflcially lighted, unless required by the FAA or other
applicable authority. If lighting is required, the lighting alternatives and design chosen must
cause the least disturbance to the surrounding views.
F. State or Federal Requirements: All towers must meet or exceed current standards and
regulations of the FAA, the FCC, and any other agency of the state or federal government with
the authority to regulate towers and antennas. If such standards and regulations are changed,
then the owners of the towers and antennas governed by this chapter shall bring such towers
and antennas into compliance with such revised standards and regulations within six (6)
months of the effective date of such standards and regulations, unless a different compliance
schedule is mandated by the controlling state or federal agency. Failure to bring towers and
antennas into compliance with such revised standards and regulations shall constitute grounds
for the removal of the tower or antenna at the owner's expense.
G. Building Codes; Safety Standards: To ensure the structural integrity of towers, the owner of
a tower shall ensure that it is maintained in compliance with standards contained in applicable
state or local building codes and the applicable standards for towers that are published by the
Electronic Industries Association, as amended from time to time. If, upon inspection, the Town
of Fountain Hills concludes that a tower fails to comply with such codes and standards and
constitutes a danger to persons or property, then upon notice being provided to the owner of
the tower, the owner shall have thirty (30) days to bring such tower into compliance with such
standards. Failure to bring such tower into compliance within said thirty (30) days shall
constitute grounds for the removal of the tower or antenna at the owner's expense.
H. Measurement: For purposes of measurement, tower setbacks and separation distances
shall be calculated and applied to facilities located in the Town of Fountain Hills irrespective of
municipal and county jurisdictional boundaries.
I. Not Essential Services: Towers and antennas shall be regulated and permitted pursuant to
this chapter and shall not be regulated or permitted as essential services, public utilities, or
private utilities.
J. Franchises: Owners and/or operators of towers or antennas shall certify that all franchises
required by law for the construction and/or operation of a wireless communication system in
the Town of Fountain Hills have been obtained and shall flle a copy of all required franchises
with the Community Development Director.
K. Public Notice: For purposes of this chapter, any special use request shall require public
notice pursuant to Section 2.02(C) of this Zoning Ordinance except that the notice required shall
include posting of the property, and mailing to all property owners within 300 feet of the
proposed use, and publication in a newspaper of general circulation regardless of any
expression to the contrary in Section 2.02.
L. Signs: No signs shall be allowed on an antenna or tower.
M. Buildings and Support Equipment: Buildings and support equipment associated with
antennas or towers shall comply with the requirements of Section 17.08.
N. Co-location and Multiple Antenna/Tower Plan: The Town of Fountain Hills encourages tower
and antenna users to submit a single application for approval of multiple towers and/or
antenna sites and to submit applications, which utilize co-location with an existing wireless
telecommunications provider. Applications for approval of multiple sites or for co-location with
an existing provider shall be given priority in the review process.
O. Security fencing: Towers shall be enclosed by security fencing not less than six (6) feet in
height and no more than eight (8) feet in height, shall be constructed of a block or masonry,
and shall be equipped with an appropriate anti-climbing device; provided however, that the
Town Council may waive such requirements, as it deems appropriate.
P. Landscaping: The following requirements shall govern the landscaping surrounding towers;
provided, however, that the Town Council may waive such requirements if the goals of this
chapter would be better served thereby.
1. Tower facilities shall be landscaped with a buffer of plant materials that effectively
screens the view of the tower compound from residential property. The standard buffer
shall consist of a landscaped strip at least four (4) feet wide outside the perimeter of the
compound.
2. In locations where the visual impact of the tower would be minimal, the landscaping
requirement may be reduced or waived.
3. Existing mature plant growth and natural landforms on the site shall be preserved to
the maximum extent possible.
Section 17.05 Permitted Uses
A. General: The uses listed in this Section are deemed to be permitted uses and shall not
require administrative approval or a special use permit.
B. Permitted Uses: The following uses are speciflcally permitted:
1. Antennas or towers located on property owned, leased, or otherwise controlled by the
Town of Fountain Hills provided a license or lease authorizing such antenna or tower has
been approved by the Town of Fountain Hills. No such license or lease shall be issued for a
tower located within three hundred (300) feet of any residentially zoned property until a
public hearing has been held at a regular or special Town Council meeting.
2. Alternative tower structures when such structures and their accompanying equipment
are appropriately blended into the surrounding terrain, are within the height limitations of
the underlying zoning district and are not nearer than three hundred (300) feet to
residentially zoned and platted property.
Section 17.06 Special Use Permits
A. General: The following provisions shall govern the issuance of special use permits for
towers or antennas by the Town Council:
1. If the tower or antenna is not a permitted use under Section 17.05 of this chapter, then
a special use permit shall be required for the construction of a tower or the placement of
an antenna in all zoning districts.
2. Applications for special use permits under this Section shall be subject to the
procedures and requirements of Chapter 2, Section 2.02, of this Zoning Ordinance, except
as modifled in this Section.
3. In granting a special use permit, the Town Council may impose conditions to the extent
such conditions are necessary to minimize any adverse effect of the proposed tower on
adjoining properties.
4. Any information of an engineering nature that the applicant submits, whether civil,
mechanical, or electrical, shall be certifled by an Arizona Licensed Professional Engineer.
5. An applicant for a special use permit shall submit the information described in this
section and a nonrefundable fee established pursuant to Section 2.02(H) of this Zoning
Ordinance.
6. A Special Use Permit issued under this Chapter shall be conditioned upon veriflcation
by the Town Engineer or designee that such tower structure is structurally sound. Such
veriflcation shall be received by the applicant prior to submission.
B. Towers:
1. Information required. In addition to any information required for applications for special
use permits pursuant to Chapter 2, Section 2.02 of this Zoning Ordinance, applicants for a
special use permit for a tower shall submit the following information:
a. A site Plan as required in Section 2.04 plus zoning, General Plan classiflcation of the
site and all properties within the applicable separation distances set forth in Section
17.07(B), adjacent roadways, proposed means of access, elevation drawings of the
proposed tower and any other structures, and other information deemed by the
Development Services Director to be necessary to assess compliance with this chapter.
b. The setback distance between the proposed tower and the nearest residential unit
and residentially zoned properties.
c. The separation distance from other towers described in the inventory of existing
sites submitted pursuant to Section 17.04(C) shall be shown on an updated site plan or
map. The applicant shall also identify the type of construction of the existing tower(s)
and the owner/operator of the existing tower(s), if known.
d. Method of fencing, and flnished color and, if applicable, the method of camoufiage
and illumination.
e. A description of compliance with Sections 17.04(C), (D), (E), (F), (G), (J), (L), and (M),
(N), (O) and (P), 17.07(A), 17.07(B) and all applicable federal, state or local laws.
f. A notarized statement by the applicant as to whether construction of the tower will
accommodate collocation of additional antennas for future users.
g. Identiflcation of the entities providing the backhaul network for the tower(s)
described in the application and other cellular sites owned or operated by the
applicant in the municipality.
h. A description of the suitability of the use of existing towers, other structures or
alternative technology not requiring the use of towers or structures to provide the
services to be provided through the use of the proposed new tower.
i. A description of the feasible alternative location(s) of future towers or antennas
within the Town of Fountain Hills based upon existing physical, engineering,
technological or geographical limitations in the event the proposed tower is erected.
j. A statement of compliance with Federal Communications Commission (FCC) Radio
Frequency (RF) exposure standards.
2. Noise: No permit shall be issued for any facility, which generates a noise level greater
than flfty decibels (50 db) as measured at the edge of the property upon which such facility
is sited.
3. Factors Considered in Granting Special Use Permits for Towers: In addition to any
standards for consideration of special use permit applications pursuant to Chapter 2,
Section 2.02 of this Zoning Ordinance, the Town Council shall consider the following factors
in determining whether to issue a special use permit, although the Town Council may waive
or reduce the burden on the applicant of one or more of these criteria if the Town Council
concludes that the goals of this ordinance are better served thereby:
a. Height of the proposed tower;
b. Proximity of the tower to residential structures and residentially zoned district
boundaries;
c. Nature of uses on adjacent and nearby properties;
d. Surrounding topography;
e. Surrounding tree coverage and foliage;
f. Design of the tower, with particular reference to design characteristics that have the
effect of reducing or eliminating visual obtrusiveness.
g. Proposed ingress and egress; and
h. Availability of suitable existing towers, other structures, or alternative technologies
not requiring the use of towers or structures, as discussed in Section 17.06(B)(4) of this
chapter.
4. Availability of Suitable Existing Towers, Other Structures, or Alternative Technology: No
new tower shall be permitted unless the applicant demonstrates to the reasonable
satisfaction of the Town Council that no existing tower, structure or alternative technology
that does not require the use of towers or structures can accommodate the applicant's a
proposed antenna. An applicant shall submit information requested by the Town Council
related to the availability of suitable existing towers, other structures or alternative
technology. Evidence submitted to demonstrate that no existing tower, structure or
alternative technology can accommodate the applicant's proposed antenna may consist of
any of the following:
a. No existing towers or structures are located within the geographic area, which meet
applicant's engineering requirements.
b. Existing towers or structures are not of sufficient height to meet applicant's
engineering requirements.
c. Existing towers or structures do not have sufficient structural strength to support
applicant's proposed antenna and related equipment.
d. The applicant's proposed antenna would cause electromagnetic interference with
the antenna on the existing towers or structures, or the antenna on the existing towers
or structures would cause interference with the applicant's proposed antenna.
e. The fees, costs, or contractual provisions required by the owner in order to share
an existing tower or structure or to adapt an existing tower or structure for sharing are
unreasonable. Costs exceeding new tower development are presumed to be
unreasonable.
f. The applicant demonstrates that there are other limiting factors that render existing
towers and structures unsuitable.
g. The applicant demonstrates that an alternative technology that does not require
the use of towers or structures, such as a cable micro cell network using multiple low-
powered transmitters/receivers attached to a wire line system, is unsuitable. Costs of
alternative technology that exceed new tower or antenna development shall not be
presumed to render the technology unsuitable.
Section 17.07 Minimum Setbacks and Separation
A. Setbacks: The following setback requirements shall apply to all towers; provided, however,
that the Town Council may reduce the standard setback requirements if the goals of this
chapter would be better served thereby:
1. Towers must be set back a distance equal to at least one hundred percent (100%) of the
height of the tower from any adjoining lot line. Provided, however, that separation
distances from residential uses shall be in accordance with Table 1 set forth below.
2. Accessory buildings must satisfy the minimum zoning district setback requirements.
B. Separation: The following separation requirements shall apply to all towers and antennas
provided, however, that the Town Council may reduce the standard separation requirements if
the goals of this chapter would be better served thereby.
1. Separation from off-site uses/designated areas.
a. Tower separation shall be measured from the base of the tower to the lot line of
the off-site uses and/or designated areas as specifled in Table 1, except as otherwise
provided in Table 1.
b. Separation requirements for towers shall comply with the minimum standards
established in Table 1.
Table 1. Separation Requirements from Offsite Uses/Areas
Off-site Use/Designated Area Separation Distance
Single-family or duplex residential units1 200 feet or 300% of tower height, whichever is greater
Off-site Use/Designated Area Separation Distance
Vacant single-family or duplex residentially zoned
land which is either platted or has preliminary plat
approval which is not expired
200 feet or 300% of tower height, whichever is greater2
Vacant unplatted residentially zoned lands3 100 feet or 100% of tower height, whichever is greater
Existing multifamily residential units greater than
duplex units
100 feet or 100% of tower height, whichever is greater
Nonresidentially zoned lands or nonresidential
uses
None, only setbacks apply
1 Includes modular homes and mobile homes used for living purposes.
2 Separation measured from base of tower to closest building setback line.
3 Includes any unplatted residential use properties without a valid preliminary subdivision plan or
valid development plan and any multifamily residentially zoned land greater than a duplex.
2. Separation distances between towers:
Separation distances between towers shall be applicable for and measured between the
proposed tower and preexisting towers. The separation distances shall be measured by
drawing or following a straight line between the base of the existing tower and the
proposed base, pursuant to a site plan, of the proposed tower. The separation distances
(listed in linear feet) shall be as shown in Table number 2.
Table 2. Separation Distances between Towers
Monopole 65 ft. in
height or greater
Monopole less than 65
ft. in height but greater
than 40 ft. in height
Monopole less than
40 ft. in height
Monopole 65 ft. in height or
greater
2,000 feet 1,500 feet 1,000 feet
Monopole 65 ft. in
height or greater
Monopole less than 65
ft. in height but greater
than 40 ft. in height
Monopole less than
40 ft. in height
Monopole less than 65 ft. in height
but greater than 40 ft. in height
1,500 feet 1,500 feet 1,000 feet
Monopole less than 40 ft. in height 1,000 feet 1,000 feet 750 feet
Section 17.08 Buildings or Other Equipment Storage
A. Antennas Mounted on Structures or Rooftops: The equipment cabinet or structure used in
association with antennas shall comply with the following:
1. The cabinet or structure shall not contain more than one hundred-twenty (120) square
feet of gross fioor area or be more than eight (8) feet in height and shall be located on the
ground.
2. Equipment storage buildings or cabinets shall comply with all applicable building codes.
B. Antennas Mounted on Utility Poles, Light Poles, or Towers: The equipment cabinet or
structure used in association with antennas shall be located in accordance with the following:
1. In residential districts, the equipment cabinet or structure may be located:
a. In a required front yard or required street side yard provided the cabinet structure
is no greater than three and one-half (3.5) feet in height or twenty (20) square feet of
gross fioor area and the cabinet/structure is located a minimum of three (3) feet from
all lot lines. The cabinet/structure shall be screened by sight obscuring landscaping
which obscures at least ninety-flve percent (95%) of the structure at planting and
throughout the duration of the cabinet or structure’s existence with an ultimate height
not to exceed forty-two (42) inches.
b. In a required rear yard, provided the cabinet or structure is no greater than flve (5)
feet in height or one hundred-twenty (120) square feet in gross fioor area. The
cabinet/structure shall be screened by sight obscuring landscaping which obscures at
least ninety-flve percent (95%) of the structure at planting and throughout the duration
of the cabinet or structure’s existence with an ultimate height of six (6) feet.
c. The entry or access side of a cabinet or structure shall be gated by a solid, sight-
obscuring gate that is separate from the cabinet or structure.
2. In commercial or industrial districts the equipment cabinet or structure shall be no
greater than fourteen (14) feet in height or three hundred (300) square feet in gross fioor
area. The structure or cabinet shall be screened by sight-obscuring landscaping with an
ultimate height of sixteen (16) feet and a planted height of at least six (6) feet. The entry or
access side of a cabinet or structure shall be gated by a solid, sight-obscuring gate that is
separate from the cabinet or structure. Such access way shall not face residentially zoned
property.
C. Modiflcation of Building Size Requirements: The requirements of Sections 17.08(A) through
(C) may be modifled by the Town Council in the case of uses permitted by special use to
encourage collocation.
Section 17.09 Co-Location
A. Good Faith: Applicants and permittees shall cooperate and exercise good faith in co-locating
wireless telecommunications facilities on the same support structures or site, if the Town so
requests. Good faith shall include sharing technical information to evaluate the feasibility of co-
location, and may include negotiations for erection of a replacement support structure to
accommodate co-location. A competitive confiict to co-location or flnancial burden caused by
sharing such information normally will not be considered as an excuse to the duty of good
faith.
B. Third Party Technical Review: In the event a dispute arises as to whether a permittee has
exercised good faith in accommodating other users, the Town may require the applicant to
obtain a third party technical study at the applicant’s expense. The Town may review any
information submitted by the applicant and permittee(s) in determining whether good faith has
been exercised.
C. Exceptions: No co-location may be required where the shared use would or does result in
signiflcant interference in the broadcast or reception capabilities of the existing wireless
telecommunications facilities or failure of the existing wireless telecommunications facilities to
meet federal standards for emissions.
D. Violation; penalty: Failure to comply with co-location requirements when feasible may result
in denial of a permit request or revocation of an existing permit.
Section 17.10 Removal of Abandoned Antennas and Towers
Any antenna or tower that is not operated for a continuous period of ninety (90) days shall be
considered abandoned, and the owner of such antenna or tower shall remove the same within
ninety (90) days of receipt of notice from the Town of Fountain Hills notifying the owner of such
abandonment. Failure to remove an abandoned antenna or tower within said ninety (90) day
period shall be grounds to remove the tower or antenna at the owner's expense. If there are
two or more users of a single tower, then this provision shall not become effective until all
users cease using the tower for the prescribed period.
Section 17.11 Nonconforming Uses
A. Not Expansion of Nonconforming Use: Towers that are constructed, and antennas that are
installed, in accordance with the provisions of this chapter shall not be deemed to constitute
the expansion of a nonconforming use or structure.
B. Pre-existing towers: Pre-existing towers shall be allowed to continue their usage as they
presently exist. Routine maintenance (including replacement with a new tower of like
construction and height) shall be permitted on such preexisting towers. New construction other
than routine maintenance on a preexisting tower shall comply with the requirements of this
chapter.
C. Rebuilding Damaged or Destroyed Nonconforming Towers or Antennas: Notwithstanding
other provisions of this chapter, bona flde nonconforming towers or antennas that are
damaged or destroyed may be rebuilt without having to flrst obtain a special use permit and
without having to meet the separation requirements specifled in Sections 17.07(A) and 17.07(B).
The type, height, and location of the tower onsite shall be of the same type and intensity as the
original facility approval; provided, however, that any destroyed lattice or guyed tower shall be
replaced with a monopole structure only. Building permits to rebuild the facility shall comply
with the then applicable building codes and shall be obtained within ninety (90) days from the
date the facility is damaged or destroyed. If no permit is obtained or if said permit expires, the
tower or antenna shall be deemed abandoned as specifled in Section 17.10.
The Fountain Hills Zoning Ordinance is current through Ordinance 23-06, and legislation
passed through September 19, 2023.
Disclaimer: The town clerk’s office has the official version of the Fountain Hills Zoning
Ordinance. Users should contact the town clerk’s office for ordinances passed subsequent to
the ordinance cited above.
Town Website: www.fh.az.gov
Hosted by Code Publishing Company, A General Code Company.