HomeMy WebLinkAboutRes 1991-16C RESOLUTION NO. 1991 -16 A RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE TOWN OF FOUNTAIN HILLS, ADOPTING A CONSTRUCTION FEE SCHEDULE FOR CONSTRUCTION PLAN REVIEWS. WHEREAS, The Town of Fountain Hills will have numerous construction activities taking place within its corporate limits; and WHEREAS, The Town of Fountain Hills desires to review said plans for conformance to the construction standards adopted by the Town Council; and WHEREAS, The Town of Fountain Hills incurs direct costs in reviewing construction plans; and WHEREAS, The Town of Fountain Hills wants an equitable system to IL assess such costs; NOW THEREFORE, BE IT RESOLVED that the Town of Fountain Hills adopts the attached construction fee schedule for construction plan reviews. PASSED AND ADOPTED this 16th day of May, 1991, by the Mayor and Common Council of the Town of Fountain Hills, Arizon . 4—e� 4 /M'_ John utillo, Mayor ATTEST: Cassie B. Hansen, Town Clerk REV ED BY- Paul L. Nordin, Town Manager APPROVED AS TO FORM: William E. Farrell, Town Attorney PROJECT NAME ITEMS TOWN OF FOUNTAIN HILLS CONSTRUCTION PERMIT FEE SCHEDULE CERTIFICATE OF CONSTRUCTION QUANTITIES 1. PAVING Paving - A.C. (siangle course) .............. Paving - Overlay or Top Course .............. Barricading - (permanent- Wooden) ............ Guard Rail ... ............................... Survey Monuments ............................ 2. CONCRETE Paving - P.C. Concrete or Bomanite.......... Sidewalk ..... ............................... Curb and Gutter ............................. Valley Gutter ............................... Concrete Apron including curb and /or Wheelchair ramps ................... Scuppers and Building Drains ................ Ailey Surfacing (non A.G.) .................. Cutoff Walls . ............................... Slope Protection ............................ Driveway Entrances .......................... 30 DRAINAGE Dry Wills (Maxwell or similar) ............. Irrigation and Storm Drain Pipe............ Pressure Manholes .......................... Catch Basin, Headwalls, Irrigation, S.D. and Water Manholes ............. UNIT CHARGE $ .30 per S.Y. .05 per S.Y. 11.00 each .10 per L.F. 5.00 each .22 per S.Y. .05 per L.F. .16 per L.F. .29 per S.F. 7.50 each 10.00 each .03 each .15 per L.F. .25 per S.Y. 20.00 each $ 35.00 each .68 per L.F. 35.00 each 15.00 each Sheet 1 of 3 QUANTITY ITEM COST J 1j J, PROJECT NAME Sheet 2 of 3 ITEMS UNIT CHARGE QUANTITY ITEM COST 4. LANDSCAPE Sprinkler Piping ....................... $ .05 per L.F. 5. UTILITIES T.V. Udderground Cable or Conduit...... $ .05 per L.F. Utility Trenching and Backfill......... .05 per L.F. Splice and Repair Pits (backfill and patch) . . . . . . . . . . . . . . . . . . . . . . . 17.00 each Adjustments: M.H., Valves, Cleanouts, Monuments, etc........... 6.00 each 6. MISCELLANEOUS Fence, Non - reinforced Masonry (City- owned) ................... .09 per L.F. Fence, Wire or Wood (City- owned) ....... .05 per L.F. Signs (regulatory, warning, street, etc.) 40.00 each For construction, landscaping, removals and site grading not included in the above schedule, the permit fee shall be as follows: PROJECT NAME TOWN OF FOUNTAIN HILLS CONSTRUCTION PERMIT FEE SCHEDULE CERTIFICATE OF CONSTRUCTION QQANTITIES ITNi7S UNIT CHARGE UQ ANTITY 1. PAVING Paving - A.C. (siangle course) .............. Paving - Overlay or Top Course .............. Barricading - (permanent- Wooden) ............ Guard Rail ... ............................... Survey Monuments ............................ 2. CONCRETE Paving - P.C. Concrete or Bomanite.......... Sidewalk ..... ............................... Curb and Gutter ............................. Valley Gutter ............................... Concrete Apron including curb and /or Wheelchair ramps ................... Scuppers and Building Drains ................ Alley Surfacing (non A.G.) .................. Cutoff Walls . ............................... Slope Protection ............................ Driveway Entrances .......................... 3. DRAINAGE Dry Wills (Maxwell or similar) ............. Irrigation and Storm Drain Pipe............ Pressure Manholes .......................... Catch Basin, Headwalls, Irrigation, S.D. and Water Manholes ............. $ .30 per S.Y. .05 per S.Y. 11.00 each .10 per L.F. 5.00 each .22 per S.Y. .05 per L.F. .16 per L.F. .29 per S.F. 7.50 each 10.00 each .03 each .15 per L.F. .25 per S.Y. 20.00 each $ 35.00 each .68 per L.F. 35.00 each 15.00 each Sheet 1 of 3 ITEM COST PROJECT NAME EXTENDED PROJECT COST $0.00 to $20,000.00 $20,000.00 to $100,000.00 $100,001.00 and Up SITE GRADING Site Grading Commercial Sites FEE 6% of Estimated Project Cost 5% of Estimated Project Cost 3% of Estimated Project Cost FEE ` $3.00 per acre plus $50.00 $50.00 TOTAL COST I hereby certify that these quantities are accurate and that they correspond to the plans and specifications which I have prepared for the improvements of this project. Signature Arizona Registration Number Date Sheet 3 of 3 I • (aadoTanaQ aqq Aq pTpd aq TTTM s999 BUTP1009x TTp) sTTTH uzpquno` go umol aqq Aq papaooaa aq TTzM sgpTd TTK • supTd �uaui - anoadull 9q4 Jo MainaH Tpu-r3 att4 g4TM peggTtugns aq TTPgs uz-zo; „s9-r.4T4uPn0 go a�po-r�-r� zaO„ Wag p94pTnoTpo s993 SaS3 lipr ad ssIS -330 • ,�doo TPUOT. gTppp uopa aoj abpd aad 00 9 E $ p.zooaa a0J paTTJ 4pTd aO; abpd aad 00.0E$ aa3 ONDIDaHO NVrI.d lVrld rIVNIa /NVrld ZNaWaAoz.d I 00.00T `T$ :ss3 WflWIxvw a.zoui JO saaop TZ aoj 9a0p jad 00-S $ snTd 00.00L$ - aa3 asps a23 ONI'II3 lK'Id 2iHVNIWI'IaHd SHa3 •6 • TP44Tuigns anoA do -NpTd o4 uagm auogd9T94 Aq paT9Tq0u aq TTTm noA M9TA9a anoA go uoT49Tdwoo uodn • g • �uaui�paaq Tpz4 ua zaga zd jo9 xsp q0U op aspaTd J sjogDPaquoo PUP s.zaauTbua IszadoTanap a9ggo TTp oq ssauaTp3 ui - s-rspq ,,paAjeg - .s -T-r3 - auioO gs.zz3,, p uo uia -.sAs ' MaTAga ano oquT pa.zaqua pup panzaoaz amp supTd TTrd •L : Ssa3 ONIGUODa i sabpd aaow ao TZ aoj abpd aad OS' L $ snTd sabpd OZ tibnoagq abpd aad 0 0 • ST $ . MaznaH ugano3 af)UVHO ON : MaTnaH paTtIl aDHVH0 ON : M9TAaH puooaS sabpd GaOuz ao TZ a0 J abed aad 0 0 • ST $ snTd sabpd OZ gbnoagq abpd grad 00.0E$ MaTnaH gSaT3 aa3 ONDIDaHO NVrI.d lVrld rIVNIa /NVrld ZNaWaAoz.d I 00.00T `T$ :ss3 WflWIxvw a.zoui JO saaop TZ aoj 9a0p jad 00-S $ snTd 00.00L$ - aa3 asps a23 ONI'II3 lK'Id 2iHVNIWI'IaHd SHa3 •6 • TP44Tuigns anoA do -NpTd o4 uagm auogd9T94 Aq paT9Tq0u aq TTTm noA M9TA9a anoA go uoT49Tdwoo uodn • g • �uaui�paaq Tpz4 ua zaga zd jo9 xsp q0U op aspaTd J sjogDPaquoo PUP s.zaauTbua IszadoTanap a9ggo TTp oq ssauaTp3 ui - s-rspq ,,paAjeg - .s -T-r3 - auioO gs.zz3,, p uo uia -.sAs ' MaTAga ano oquT pa.zaqua pup panzaoaz amp supTd TTrd •L PROJECT NAME EXTENDED PROJECT COST $0.00 to $20,000.00 $20,000.00 to $100,000.00 $100,001.00 and Up SITE GRADING Site Grading Commercial Sites FEE 6% of Estimated Project Cost 5% of Estimated Project Cost 3% of Estimated Project Cost FEE $3.00 per acre plus $50.00 $50.00 TOTAL COST I hereby certify that these quantities are accurate and that they correspond to the plans and specifications which I have prepared for the improvements of this project. Signature Arizona Registration Number Date Sheet 3 of 3 G G G