RESOLUTION NO. 1991 -16
A RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE TOWN
OF FOUNTAIN HILLS, ADOPTING A CONSTRUCTION FEE SCHEDULE
FOR CONSTRUCTION PLAN REVIEWS.
WHEREAS, The Town of Fountain Hills will have numerous construction
activities taking place within its corporate limits; and
WHEREAS, The Town of Fountain Hills desires to review said plans for
conformance to the construction standards adopted by the Town Council; and
WHEREAS, The Town of Fountain Hills incurs direct costs in reviewing
construction plans; and
WHEREAS, The Town of Fountain Hills wants an equitable system to
IL assess such costs;
NOW THEREFORE, BE IT RESOLVED that the Town of Fountain Hills
adopts the attached construction fee schedule for construction plan reviews.
PASSED AND ADOPTED this 16th day of May, 1991, by the Mayor and
Common Council of the Town of Fountain Hills, Arizon .
4—e� 4 /M'_
John utillo, Mayor
ATTEST:
Cassie B. Hansen, Town Clerk
REV ED BY-
Paul L. Nordin, Town Manager
APPROVED AS TO FORM:
William E. Farrell, Town Attorney
PROJECT NAME
ITEMS
TOWN OF FOUNTAIN HILLS
CONSTRUCTION PERMIT FEE SCHEDULE
CERTIFICATE OF CONSTRUCTION QUANTITIES
1. PAVING
Paving - A.C. (siangle course) ..............
Paving - Overlay or Top Course ..............
Barricading - (permanent- Wooden) ............
Guard Rail ... ...............................
Survey Monuments ............................
2. CONCRETE
Paving - P.C. Concrete or Bomanite..........
Sidewalk ..... ...............................
Curb and Gutter .............................
Valley Gutter ...............................
Concrete Apron including curb and /or
Wheelchair ramps ...................
Scuppers and Building Drains ................
Ailey Surfacing (non A.G.) ..................
Cutoff Walls . ...............................
Slope Protection ............................
Driveway Entrances ..........................
30 DRAINAGE
Dry Wills (Maxwell or similar) .............
Irrigation and Storm Drain Pipe............
Pressure Manholes ..........................
Catch Basin, Headwalls, Irrigation,
S.D. and Water Manholes .............
UNIT CHARGE
$ .30 per S.Y.
.05 per S.Y.
11.00 each
.10 per L.F.
5.00 each
.22 per S.Y.
.05 per L.F.
.16 per L.F.
.29 per S.F.
7.50 each
10.00 each
.03 each
.15 per L.F.
.25 per S.Y.
20.00 each
$ 35.00 each
.68 per L.F.
35.00 each
15.00 each
Sheet 1 of 3
QUANTITY ITEM COST
J 1j J,
PROJECT NAME
Sheet 2 of 3
ITEMS
UNIT CHARGE QUANTITY ITEM COST
4. LANDSCAPE
Sprinkler Piping .......................
$ .05 per L.F.
5. UTILITIES
T.V. Udderground Cable or Conduit......
$ .05 per L.F.
Utility Trenching and Backfill.........
.05 per L.F.
Splice and Repair Pits (backfill and
patch) . . . . . . . . . . . . . . . . . . . . . . .
17.00 each
Adjustments: M.H., Valves, Cleanouts,
Monuments, etc...........
6.00 each
6. MISCELLANEOUS
Fence, Non - reinforced Masonry
(City- owned) ...................
.09 per L.F.
Fence, Wire or Wood (City- owned) .......
.05 per L.F.
Signs (regulatory, warning, street, etc.)
40.00 each
For construction, landscaping, removals and site
grading not included in the above schedule, the
permit fee shall be as follows:
PROJECT NAME
TOWN OF FOUNTAIN HILLS
CONSTRUCTION PERMIT FEE SCHEDULE
CERTIFICATE OF CONSTRUCTION QQANTITIES
ITNi7S UNIT CHARGE UQ ANTITY
1. PAVING
Paving - A.C. (siangle course) ..............
Paving - Overlay or Top Course ..............
Barricading - (permanent- Wooden) ............
Guard Rail ... ...............................
Survey Monuments ............................
2. CONCRETE
Paving - P.C. Concrete or Bomanite..........
Sidewalk ..... ...............................
Curb and Gutter .............................
Valley Gutter ...............................
Concrete Apron including curb and /or
Wheelchair ramps ...................
Scuppers and Building Drains ................
Alley Surfacing (non A.G.) ..................
Cutoff Walls . ...............................
Slope Protection ............................
Driveway Entrances ..........................
3. DRAINAGE
Dry Wills (Maxwell or similar) .............
Irrigation and Storm Drain Pipe............
Pressure Manholes ..........................
Catch Basin, Headwalls, Irrigation,
S.D. and Water Manholes .............
$ .30 per S.Y.
.05 per S.Y.
11.00 each
.10 per L.F.
5.00 each
.22 per S.Y.
.05 per L.F.
.16 per L.F.
.29 per S.F.
7.50 each
10.00 each
.03 each
.15 per L.F.
.25 per S.Y.
20.00 each
$ 35.00 each
.68 per L.F.
35.00 each
15.00 each
Sheet 1 of 3
ITEM COST
PROJECT NAME
EXTENDED PROJECT COST
$0.00 to $20,000.00
$20,000.00 to $100,000.00
$100,001.00 and Up
SITE GRADING
Site Grading
Commercial Sites
FEE
6% of Estimated Project Cost
5% of Estimated Project Cost
3% of Estimated Project Cost
FEE `
$3.00 per acre plus $50.00
$50.00
TOTAL COST
I hereby certify that these quantities are accurate and that they correspond to the
plans and specifications which I have prepared for the improvements of this project.
Signature
Arizona Registration Number
Date
Sheet 3 of 3
I
• (aadoTanaQ aqq Aq pTpd aq TTTM s999 BUTP1009x TTp)
sTTTH uzpquno` go umol aqq Aq papaooaa aq TTzM sgpTd TTK
• supTd �uaui
- anoadull 9q4 Jo MainaH Tpu-r3 att4 g4TM peggTtugns aq TTPgs
uz-zo; „s9-r.4T4uPn0 go a�po-r�-r� zaO„ Wag p94pTnoTpo s993
SaS3 lipr ad ssIS -330
• ,�doo TPUOT. gTppp uopa aoj abpd aad 00 9 E $
p.zooaa a0J paTTJ 4pTd aO; abpd aad 00.0E$
aa3 ONDIDaHO NVrI.d lVrld rIVNIa /NVrld ZNaWaAoz.d I
00.00T `T$ :ss3 WflWIxvw
a.zoui JO saaop TZ aoj 9a0p jad 00-S $
snTd 00.00L$ - aa3 asps
a23 ONI'II3 lK'Id 2iHVNIWI'IaHd
SHa3 •6
• TP44Tuigns anoA do -NpTd o4 uagm auogd9T94 Aq
paT9Tq0u aq TTTm noA M9TA9a anoA go uoT49Tdwoo uodn • g
• �uaui�paaq
Tpz4 ua zaga zd jo9 xsp q0U op aspaTd J sjogDPaquoo
PUP s.zaauTbua IszadoTanap a9ggo TTp oq ssauaTp3 ui
- s-rspq ,,paAjeg - .s -T-r3 - auioO gs.zz3,, p uo uia -.sAs '
MaTAga ano oquT pa.zaqua pup panzaoaz amp supTd TTrd •L
: Ssa3 ONIGUODa i
sabpd aaow ao TZ aoj
abpd
aad OS' L $
snTd sabpd OZ tibnoagq
abpd
aad 0 0 • ST $
. MaznaH ugano3
af)UVHO ON
: MaTnaH paTtIl
aDHVH0 ON
: M9TAaH puooaS
sabpd GaOuz ao TZ a0 J
abed
aad 0 0 • ST $
snTd sabpd OZ gbnoagq
abpd
grad 00.0E$
MaTnaH gSaT3
aa3 ONDIDaHO NVrI.d lVrld rIVNIa /NVrld ZNaWaAoz.d I
00.00T `T$ :ss3 WflWIxvw
a.zoui JO saaop TZ aoj 9a0p jad 00-S $
snTd 00.00L$ - aa3 asps
a23 ONI'II3 lK'Id 2iHVNIWI'IaHd
SHa3 •6
• TP44Tuigns anoA do -NpTd o4 uagm auogd9T94 Aq
paT9Tq0u aq TTTm noA M9TA9a anoA go uoT49Tdwoo uodn • g
• �uaui�paaq
Tpz4 ua zaga zd jo9 xsp q0U op aspaTd J sjogDPaquoo
PUP s.zaauTbua IszadoTanap a9ggo TTp oq ssauaTp3 ui
- s-rspq ,,paAjeg - .s -T-r3 - auioO gs.zz3,, p uo uia -.sAs '
MaTAga ano oquT pa.zaqua pup panzaoaz amp supTd TTrd •L
PROJECT NAME
EXTENDED PROJECT COST
$0.00 to $20,000.00
$20,000.00 to $100,000.00
$100,001.00 and Up
SITE GRADING
Site Grading
Commercial Sites
FEE
6% of Estimated Project Cost
5% of Estimated Project Cost
3% of Estimated Project Cost
FEE
$3.00 per acre plus $50.00
$50.00
TOTAL COST
I hereby certify that these quantities are accurate and that they correspond to the
plans and specifications which I have prepared for the improvements of this project.
Signature
Arizona Registration Number
Date
Sheet 3 of 3