Contract No.-261 f-011.1
FIRST AMENDMENT
TO
COOPERATIVE PURCHASING AGREEMENT
BETWEEN
THE TOWN OF FOUNTAIN HILLS
AND
CONTINENTAL FLOORING CO.
THIS FIRST AMENDMENT TO COOPERATIVE PURCHASING AGREEMENT (this
"First Amendment") is entered into as of May 4, 2022, between the Town of Fountain Hills, an
Arizona municipal corporation (the "Town") and Continental Flooring Co., an Arizona
corporation.
RECITALS
A. After a competitive procurement process, the State of Arizona entered into Contract
No. CTR043427, dated April 1, 2019, (the "State Contract"), with Continental Flooring Co. for
the Contractor to provide labor, equipment, and materials necessary to install carpet and flooring
materials. All of the capitalized terms not otherwise defined in this First Amendment have the
same meanings as defined in the Contract.
B. The Town and the Contractor entered into a Cooperative Purchasing Agreement
dated December 17, 2019, based upon the State Contract (the "Agreement"), for the Contractor to
provide labor, equipment, and materials necessary to install carpet and flooring materials. The
terms of the Agreement are incorporated herein.
C. The Town has determined that additional Materials and Services (the "Additional
Materials and Services") are necessary.
D. The Town and the Contractor desire to enter into this First Amendment to increase
the amount of the Agreement for the Additional Materials and Services.
E. The Town and the Contractor desire to enter into this First Amendment to extend
the term of the Agreement for one additional year and allow for three (3) successive one year
renewals provided the original State Contract term has been extended.
AGREEMENT
NOW, THEREFORE, in consideration of the foregoing introduction and recitals, which
are incorporated herein by reference, the following mutual covenants and conditions, and other
good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged,
the Town and the Contractor hereby agree as follows:
I oF5
Compensation. The Town Agreement shall be increased by amount not to exceed
$300,000 to an aggregate amount not to exceed $670,000 (including all renewals)
for the Additional Materials and Services.
2. Term of Agreement. This Agreement shall be effective as of the date set forth
above and shall remain in full force and effect until March 22, 2022, unless terminated as otherwise
provided in this Agreement or the State Contract. After the expiration of the term, this Agreement
may be renewed for up to three (3) successive one-year terms ("Renewal Terms") if. (i) it is
deemed within the best interests of the Town, subject to the availability and appropriation of funds
for renewal in each subsequent year, (ii) the term of the State Contract has not expired and has
been extended, (iii) at least thirty (30) days prior to the end of the then -current term of this
Agreement, the Contractor requests, in writing, to extend this Agreement for an additional one-
year (1) term and (iv) the Town approves the addition al one-year (1) term in writing (including
any price adjustments approves as part of the State Contract), as evidenced by the Town Manager's
signature thereon, which approval may be withheld by the Town for any reason. The Contractor's
failure to seek renewal of this Agreement shall cause this Agreement to terminate at the end of the
then -current term of this Agreement; provided, however, that the Town may, at its discretion and
with agreement of the Contractor, elect to waive this requirement and renew this Agreement. The
Initial Term and and Renewal Term(s) are collectively referred to herein as the "Term". Upon
renewal, the terms and conditions of this Agreement shall remain in full force and effect.
2. Notices and Requests. Any notice or other communication required or permitted
to be given under this Agreement shall be in writing and shall be deemed to have been duly given
if (A) delivered to the party at the address set forth below, (B) deposited in the U.S. Mail, registered
or certified, return receipt requested, to the address set forth below or (C) given to a recognized
and reputable overnight delivery service, to the address set forth below:
If to the Town: Town of Fountain Hills
16705 East Avenue of the Fountains
Fountain Hills, Arizona 85268
Attn: Grady E. Miller, Town Manager
With copy to: Town of Fountain Hills
16705 East Avenue of the Fountains
Fountain Hills, Arizona 85268
Attn: Aaron D. Arnson, Town Attorney
If to Contractor: Continental Flooring Co.
9319 N. 941" Way, Suite 1000
Scottsdale, Arizona 85258
Attn: Christopher Coleman
or at such other address, and to the attention of such other person or officer, as any party may
designate in writing by notice duly given pursuant to this subsection. Notices shall be deemed
received (A) when delivered to the party, (B) three business days after being placed in the U.S.
Mail, properly addressed, with sufficient postage or (C) the following business day after being
2 of 5
given to a recognized overnight delivery service, with the person giving the notice paying all
required charges and instructing the delivery service to deliver on the following business day. If
a copy of a notice is also given to a party's counsel or other recipient, the provisions above
governing the date on which a notice is deemed to have been received by a party shall mean and
refer to the date on which the party, and not its counsel or other recipient to which a copy of the
notice may be sent, is deemed to have received the notice.
3. Effect of Amendment. In all other respects, the Agreement is affirmed and ratified
and, except as expressly modified herein, all terms and conditions of the Agreement shall remain
in full force and effect.
4. Non -Default. By executing this First Amendment, the Contractor affirmatively
asserts that (i) the Town is not currently in default, nor has it been in default at any time prior to
this First Amendment, under any of the terms or conditions of the Agreement and (ii) any and all
claims, known and unknown, relating to the Agreement and existing on or before the date of this
First Amendment are forever waived.
5. Israel. Contractor certifies that it is not currently engaged in, and agrees for the
duration of this Agreement that it will not engage in a "boycott," as that term is defined in Ariz.
Rev. Stat. § 35-393, of Israel.
b. Conflict of Interest. This First Amendment and the Agreement may be cancelled
by the Town pursuant to Ariz. Rev. Stat. § 38-51 1.
[SIGNATURES ON FOLLOWING PAGES]
3 of 5
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date
and year first set forth above.
"Town"
TOWN OF FOUNTAIN HILLS,
an Arizona municipal corporation
,�— seL �.'Y,c�.
Grady E. Miller, Town Manager
ATTEST:
Elizgb&h A. Klein
Elizabeth A. Klein (May 6, 202107:16 POT)
Elizabeth A. Burke, Town Clerk
APPROVED AS TO FORM:
Aa .pg, .Ai-ot"m,
Aaron D. Arnson, Town Attorney
[SIGNATURES CONTINUE ON FOLLOWING PAGES]
"Contractor"
Continental Flooring Co.
afly-,O rep alelffah
By:[hristopherC leman{Mar30,20211630PDT}
Name. Christopher Coleman
Tid.: President
EXHIBIT C
C
ONTINENTAL
FLOORING COMPANY
April 22, 2021
Steve Bartlett
Town of Fountain Hills
16705 E Avenue of the Fountains
Fountain Hills, AZ 85268-3815
9319 N. 94'h Way a Suite 1000 • Scottsdale, AZ 85258
Phone (480) 949-8509 • Toll Free (800) 825-1221
FAX (480) 945-2603
Website www.continentalflooring.com
RE. Town of Fountain Hills Community Center Flooring Replacement (See Drawing)
Arizona State Flooring Contract No. CTR043427.
Dear Steve:
In response to your request for quotation, Continental Flooring Company offers the following proposal for your
consideration under Arizona State Flooring Contract No. CTR043427:
Line Description
Qty
Price
Extended
Lobby and Carpet:
Fumish & Install Interface Aerial Carpet Tile
1895 SY
$29.39 SY
$55,694.05
Added Moisture Backing (Readyback)
1990 SY
$4.75 SY
$9,452,50
Fumish & Install Armstrong Natural Creations LVT D10
2088 SF
$4.95 SF
$10,335.60
Fumish & Install Porcelain Floor Tile
4720 SF
$8.50 SF
$40,120.00
Fumish and Install 4" Porcelain Cove Base
400 LF
$10.00 LF
$4,000.00
Fumish 4" Rubber Caved Base
2280 LF
$0.80 LF
$1,824.00
Install 4" Rubber Coved base
2280 LF
$0.90 LF
$2,052.00
Move Furniture
200 SY
$3.00 SY
$600.00
Remove Existing Floorcovering Carpet
16164 SF
$0.30 SF
$4,849.20
Remove Existing Floorcovering Vinyl
1917 SF
$0.60 SF
$1,150.20
Remove Exisitng Floorcovering Ceramic
4558 SF
$3.25 SF
$14,813.50
Floor preparation as required by manufacturer guidelines
22639 SF
$0,30 SF
$6,791.70
Attic Stock: MO Carpet Tile
95 SY
$25.39 SY
$2,412.05
Restrooms:
Fumish & Install Porcelain Floor Tile
1080 SF
$10.25 SF
$11,070.00
Fumish and Install Porcelain Wall Tile
1700 SF
$10.25 SF
$17,425.00
Cementatious Backer Board for Wall Tile
1700 SF
$2.75 SF
$4,675.00
Fumish and Install 4" Porcelain Cove Base
750 LF
$10.00 LF
$7,500.00
Remove Exisitng Floorcovering Ceramic
2600 SF
$3.25 SF
$8,450.00
Floor preparation as required by manufacturer guidelines
2600 SF
$0.30 SF
$780.00
Kitchen:
Grind and Polish Concrete
2650 SF
$12.00 SF
$31,800.00
Moderate Floor Grinding to Remove Epoxy
2650 SF
$1.00 SF
$2,650.00
Fumish 4" Rubber Coved Base
480 LF
$0.80 LF
$384.00
Install 4" Rubber Coved Base
480 LF
$0.80 LF
$384.00
5% Overage May apply on carpet tile. Any Overage
Total
$239,212.80
will be charged at $25.391SY + $4.751SY for the added Backing
The above quotation is in compliance with the new TPT Tax regulations and no additional taxes will be charged
t of 2
Prices listed in this quote are for the scope of work shown on the attached drawing and/or listed in the regarding line of this
quote. Any changes you make to the project after the materials are ordered may require additional charges. If the changes you
make are close to the start of or during the installation process there may also be a delay in the completion of the project as we wait
for the materials for the change to arrive. Please review and consider carefully the quote and drawing is meeting the scope of
work you have requested, we will be referencing these documents during the Installation project. if it is not, please request a
revised quote with an updated scope of work.
Prices listed In this quote include moving of standard furniture. Standard furniture moving includes moving of regular desks, chairs,
2 drawer file cabinets, half empty 4 drawer filing cabinets and empty bookcases. (Excludes modular furniture, fireproof file cabinets
and safes)
Not included in moving of standard furniture is the moving of sensitive electronic equipment such as computers, telephones,
copiers and such. You should have your IT department or facilities department coordinate the moving of all electronic items. A
guide sheet regarding what to do before installation begins is included with this quote and another copy will be sent to you once an
installation date is set.
Prices listed in this quote include standard sub -floor preparation. Standard sub -floor preparation consists of a maximum of 25lbs
of patch for every 300 square yards of material, except as otherwise noted. Should any unforeseen sub floor conditions exist
additional charges will apply.
Prices listed in this quote include insurance coverage as required by the originally bid contracts. Certificate of Insurance and
Worker Compensation documentation are available by request at no additional charge. A Payment and Performance Bond can be
ordered and would add 2.5% to the quote listed above. Please let me know if this project requires a bond and I will revise the
quote to include that in the pricing.
Continental Flooring does not test for asbestos or lead paint nor do we provide asbestos or lead paint abatement. The Owner
represents that they have taken all necessary steps to ensure that no asbestos or lead paint exists on this project. The Owner
accepts all responsibility for the testing and removal of asbestos and lead paint and will hold Continental Flooring harmless relating
to asbestos and lead paint. The owner will provide related certification to continental flooring if required.
Once your purchase order is delivered to Continental Flooring Company, materials for your installation will be ordered. Due to
uncertainty around manufacturing & shipping commitments and in order to eliminate scheduling delays, Continental Flooring waits
until all materials for your project have been received before scheduling your installation. For that reason, precise installation
dates will not be immediately available until materials have been received. Contact Cathy Gordon at (480) 949-3509 ext. 289
anytime you may need an update on your installation timeline.
Thank you for the opportunity to quote to you on this project. Should you have any questions, or require additional
information, please call me at (480) 949-8509 ext. 204 or on my mobile at (623) 218-8399 or email me directly at
cflynn@continentalfiooring.com.
Respectfully,
Cattie Flynn
Continental Flooring Company
We are proud to have served the public sector since 1979
2 or2
2011-011.1
Final Audit Report
Continental Flooring
Created: 2021-05-05
By: Rob Durham (rdurham@ih.az.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAEuxrYRiAyITOa79KDhNuOBitL65wvmw
"2011-011.1 Continental Flooring" History
i0J Document created by Rob Durham (rdurham@fh.az.gov)
2021-05-05 - 4:4109 PM GMT- IP address: 184.178.192.162
C'-. Document emailed to David J. Pock (dpock@fh.az.gov) for approval
2021-05-05 - 4:44:49 PM GMT
Email viewed by David J. Pock (dpock@fh.az.gov)
2021-05-05 - 5:08.48 PM GMT- IP address: 184.178.192.162
2021-05-06
6m Document approved by David J. Pock (dpock@fh.az.gov)
Approval Date: 2021-05-05 - 8:30:56 PM GMT - Time Source: server- IP address: 184,178,192.162
P+ Document emailed to Aaron Amson (aaron@piercecoleman.com) for signature
2021-05-05 - 8731:00 PM GMT
Email viewed by Aaron Amson (aaron@piercecoleman.com)
2021-05-05 - 8:50:48 PM GMT- IP address: 69.53.213.227
CSo Document e-signed by Aaron Arnson (aaron@piercecoleman.com)
Signature Dale: 2021-05-05 - 8 50.55 PM GMT - Time Source: server- IP address: 69.53.213.227
P* Document emailed to Grady Miller (gmiller@fh.az.gov) for signature
2021-05-05 - 8:50:58 PM GMT
Email viewed by Grady Miller (gmiller@fh.az.gov)
2021-05-06-1:44:14 PM GMT- IP address: 24.251.176.203
do Document e-signed by Grady Miller (gmiller@fh.az.gov)!
Signature Date: 2021-05-06 - 1:45:44 PM GMT -Time Source server- IP address: 24.251.176.203
* Document emailed to Elizabeth Burke (eburke@fh.az.gov) for signature
2021-05-06 - 1:45:46 PM GMT
(A&bee S�;,
Email viewed by Elizabeth Burke (eburke@fh.az.gov)
2021-05-06 - 2-15 27 PM GMT- IP address: 184.178.192.162
Document signing delegated to Elizabeth A. Klein (eklein@fh.az.gov) by Elizabeth Burke (eburke@fh.az.gov)
2021-05-06 - 2 15;30 PM GMT- IP address- 184.178.192.162
do Document e-signed by Elizabeth A. Klein (eklein@fh.az.gov)
Signature Date 2021-05-06 - 2:16:09 PM GMT - Time Source- server- IP address 184.178.192.162
0 Agreement completed.
2021-05-06 - 2:16 09 PM GMT
,� •
OOW4tFD 6r
Mrke
Signature Pages
Final Audit Report
Created: 2021-03-30
By' Rob Durham (rdurham@ih.az.gov)
Status: Signed
Transaction ID. CBJCHBCAABAAQiwD2FyaWma4BnFPikEX9gP5n9POEn9i
"Signature Pages" History
Document created by Rob Durham (rdurham@fh.az.gov)
2021-03-30 - 11.18 27 PM GMT- IP address 184.178.192.162
2021-03-30
P* Document emailed to Christopher Coleman (ccoleman@continentalflooring.com) for signature
2021-03-30 - 11:19 21 PM GMT
Email viewed by Christopher Coleman (ccoleman@continentalfloodng.com)
2021-03-30 - 11:30.08 PM GMT- IP address 70.177.11.66
&a Document e-signed by Christopher Coleman (ccoleman@continentalfloodng.com)