Loading...
HomeMy WebLinkAbout2022.0315.TCRM.Agenda.Packet       NOTICE OF MEETING REGULAR MEETING FOUNTAIN HILLS TOWN COUNCIL      Mayor Ginny Dickey Vice Mayor Gerry Friedel Councilmember Sharron Grzybowski Councilmember Alan Magazine Councilmember Peggy McMahon Councilmember Mike Scharnow Councilmember David Spelich    TIME:5:30 P.M. – REGULAR MEETING WHEN:TUESDAY, MARCH 15, 2022 WHERE:   FOUNTAIN HILLS COUNCIL CHAMBERS 16705 E. AVENUE OF THE FOUNTAINS, FOUNTAIN HILLS, AZ Councilmembers of the Town of Fountain Hills will attend either in person or by telephone conference call; a quorum of the Town’s various Commission, Committee or Board members may be in attendance at the Council meeting. Notice is hereby given that pursuant to A.R.S. §1-602.A.9, subject to certain specified statutory exceptions, parents have a right to consent before the State or any of its political subdivisions make a video or audio recording of a minor child. Meetings of the Town Council are audio and/or video recorded and, as a result, proceedings in which children are present may be subject to such recording. Parents, in order to exercise their rights may either file written consent with the Town Clerk to such recording, or take personal action to ensure that their child or children are not present when a recording may be made. If a child is present at the time a recording is made, the Town will assume that the rights afforded parents pursuant to A.R.S. §1-602.A.9 have been waived.    REQUEST TO COMMENT The public is welcome to participate in Council meetings. TO SPEAK TO AN AGENDA ITEM, please complete a Request to Comment card, located in the back of the Council Chambers, and hand it to the Town Clerk prior to discussion of that item, if possible. Include the agenda item on which you wish to comment. Speakers will be allowed three contiguous minutes to address the Council. Verbal comments should be directed through the Presiding Officer and not to individual Councilmembers. TO COMMENT ON AN AGENDA ITEM IN WRITING ONLY, please complete a Request to Comment card, indicating it is a written comment, and check the box on whether you are FOR or AGAINST and agenda item, and hand it to the Town Clerk prior to discussion, if possible. TO COMMENT IN WRITING ONLINE : Please feel free to provide your comments by visiting  https://www.fh.az.gov/publiccomment and SUBMIT a Public Comment Card by 3:00 PM on the day of the meeting . These comments will be shared with the Town Council.         NOTICE OF OPTION TO RECESS INTO EXECUTIVE SESSION Pursuant to A.R.S. §38-431.02, notice is hereby given to the members of the Town Council, and to the general public, that at this meeting, the Town Council may vote to go into executive session, which will not be open to the public, for legal advice and discussion with the Town's attorneys for legal advice on any item listed on the following agenda, pursuant to A.R.S. §38-431.03(A)(3).        1.CALL TO ORDER AND PLEDGE OF ALLEGIANCE – Mayor Dickey     2.MOMENT OF SILENCE     3.ROLL CALL – Mayor Dickey     4.REPORTS BY MAYOR, COUNCILMEMBERS AND TOWN MANAGER     A.RECOGNITION: Stellar Students for February 2022     5.SCHEDULED PUBLIC APPEARANCES/PRESENTATIONS     A.PRESENTATION: Monthly Update by the Maricopa County Sheriff's Office.    B.PRESENTATION: Communications Strategic Plan and Citizen Engagement Plan.    6.CALL TO THE PUBLIC Pursuant to A.R.S. §38-431.01(H), public comment is permitted (not required) on matters NOT listed on the agenda. Any such comment (i) must be within the jurisdiction of the Council, and (ii) is subject to reasonable time, place, and manner restrictions. The Council will not discuss or take legal action on matters raised during Call to the Public unless the matters are properly noticed for discussion and legal action. At the conclusion of the Call to the Public, individual councilmembers may (i) respond to criticism, (ii) ask staff to review a matter, or (iii) ask that the matter be placed on a future Council agenda.     7.CONSENT AGENDA ITEMS All items listed on the Consent Agenda are considered to be routine, noncontroversial matters and will be enacted by one motion of the Council. All motions and subsequent approvals of consent items will include all recommended staff stipulations unless otherwise stated. There will be no separate discussion of these items unless a councilmember or member of the public so requests. If a councilmember or member of the public wishes to discuss an item on the Consent Agenda, he/she may request so prior to the motion to accept the Consent Agenda or with notification to the Town Manager or Mayor prior to the date of the meeting for which the item was scheduled. The items will be removed from the Consent Agenda and considered in its normal sequence on the agenda.     A.CONSIDERATION AND POSSIBLE ACTION: Approval of the minutes of the Regular Meeting of March 1, 2022.      B.CONSIDERATION AND POSSIBLE ACTION: Approval of a budget transfer for the General Fund      Town Council Regular Meeting of March 15, 2022 2 of 4 B.CONSIDERATION AND POSSIBLE ACTION: Approval of a budget transfer for the General Fund and Vehicle Replacement Fund.     C.CONSIDERATION AND POSSIBLE ACTION: Adoption of Resolution 2022-12 Authorizing renewal of the Town of Fountain Hills' membership in the Arizona Metropolitan Trust.     D.CONSIDERATION AND POSSIBLE ACTION: Approval of an Extension of Premises Application for the Fountain Hills Elks Lodge which is hosting a beer garden in conjunction with a charity event on April 2, 2022.     E.CONSIDERATION AND POSSIBLE ACTION: Approving a Map of Dedication for a portion of Serenity Estates.      F.CONSIDERATION AND POSSIBLE ACTION: Approval of a six-month extension to the approved Special Use Permit to allow four residential units at an existing building located at 16842, 16843, 16844 and 16845 E. Avenue of the Fountains (generally located north of Avenue of the Fountains, between Saguaro Blvd. and Verde River Dr.) and in the C-2 (Intermediate Commercial) Zoning District and the Entertainment Overlay District. SU 2021-04     G.CONSIDERATION AND POSSIBLE ACTION: Extension of a Special Use Permit to allow residential uses on a 0.58 acre property in the Community Commercial (C-C) zoning district at 17134 E. Kingstree Blvd., generally located at the northwest corner of Saguaro Blvd. and Kingstree Blvd.       8.REGULAR AGENDA     A.CONSIDERATION AND POSSIBLE ACTION: Resolution 2022-13 approving an Intergovernmental Agreement with the City of Tempe authorizing the Town of Fountain Hills to participate in the East Valley Regional Veterans' Court.     B.CONSIDERATION AND POSSIBLE ACTION: Reconsideration of denial of the Park Place Site Plan, Phase III.     C.CONSIDERATION AND POSSIBLE ACTION: regarding the proposed site plan for Phase III, Building B, of Park Place located on the west side of the 13000 block of North Verde River Dr.      D.CONSIDERATION AND POSSIBLE ACTION: Authorization to Purchase and Install Illuminated Speed Limit Signs.     E.CONSIDERATION AND POSSIBLE ACTION: Approving Professional Services Agreement 2022-074 with Cactus Asphalt.     F.DISCUSSION WITH POSSIBLE DIRECTION relating to any item included in the League of      Town Council Regular Meeting of March 15, 2022 3 of 4 Town Council Regular Meeting of March 15, 2022 4 of 4 F. DISCUSSION WITH POSSIBLE DIRECTION relating to any item included in the League of Arizona Cities and Towns' weekly Legislative Bulletin(s) or relating to any action proposed or pending before the State Legislature. 9. COUNCIL DISCUSSION/DIRECTION to the TOWN MANAGER Item(s)listed below are related only to the propriety of(i)placing such item(s)on a future agenda for action,or (ii)directing staff to conduct further research and report back to the Council. 10. ADJOURNMENT CERTIFICATE OF POSTING OF NOTICE The undersigned hereby certifies that a copy of the foregoing notice was duly posted in accordance with the statement filed by the Town Council with the Town Clerk. Dated this l00 day of ,2022. Elizabeth A. n MMC,Town Cler The Town of Fountain Hills endeavors to make all public meetings accessible to persons with disabilities.Please call 480-816-5199(voice)or 1-800-367-8939(TDD)48 hours prior to the meeting to request a reasonable accommodation to participate in the meeting or to obtain agenda information in large print format.Supporting documentation and staff reports furnished the Council with this agenda are available for review in the Clerk's Office. ITEM 5. B. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Public Appearances/Presentations                   Submitting Department: Administration Prepared by: Bo Larsen, Community Relations Manager Staff Contact Information: Bo Larsen, Community Relations Manager Request to Town Council Regular Meeting (Agenda Language):  PRESENTATION: Communications Strategic Plan and Citizen Engagement Plan. Staff Summary (Background) The Town of Fountain Hills is committed to being approachable, transparent, and accessible. Advancing the free flow of accurate and truthful information is essential to serving the public interest and contributing to informed decision-making. By communicating clearly, the Town will maintain relationships with the media, government officials, and the public. Most importantly, keeping these stakeholders informed will build the relationship between Town leaders and citizens, promote trust and respect between local government and its constituents, and create an atmosphere that invites citizen involvement in decisions that affect the community.   Attachments Combined Communications Plans  Form Review Inbox Reviewed By Date Finance Director David Pock 02/23/2022 11:18 AM Town Attorney Aaron D. Arnson 02/23/2022 11:46 AM Town Manager Grady E. Miller 02/23/2022 03:58 PM Form Started By: Bo Larsen Started On: 01/25/2022 02:47 PM Final Approval Date: 02/23/2022  Communications Strategic Plan 2021 2 Community Relations/Public Information Mission: The mission of the Community Relations/Public Information Office is to be the TRUSTED SOURCE of information by accurately communicating news and information to Fountain Hills' citizens, elected officials, customers, employees, and news media via internal and external communication sources. The Community Relations Department has four key goals: 1) To establish the Town of Fountain Hills as the primary source for Town news, emergency communications, and information on events. 2) To inform, educate and engage residents and stakeholders about Town responsibilities, services, activities, and results. 3) To inform Town elected officials and Town leadership of any Town projects, incidents, and potential and current media coverage. 4) To help inform, educate and engage Town employees about the policies, procedures and information they need to succeed in their jobs and represent the Town in public interactions. These goals are achieved through the following activities: • Raise public awareness of the decisions made by the Town Council and Town Manager using multiple communication channels • Crisis communications planning and action as needed • Provide Town information via the web, social media, printed newsletters, and the news media • Stream Town Council meetings live on www.fh.az.gov Ch. 11 and Cox Cable Government Access Ch. 11 with replays on YouTube • Respond in a timely manner to media and public records request • Utilize video, digital and multimedia content to enhance communication • Design and produce printed and digital content that engages and informs the reader • Create custom communication plans to address Town client needs • Speech writing and coaching for elected officials and key town staff, as needed 3 Town of Fountain Hills Communications Strategic Plan Table of Contents Page 4 Goal: Deliver Effective CRISIS COMMUNICATIONS residents will depend on in the event of an emergency Page 5 Goal: Produce highly visual and informative SOCIAL MEDIA posts that engage the community Page 5 Goal: Build and maintain strong MEDIA RELATIONS Page 6 Goal: Build a strong Online Digital Management System Page 7 Goal: Produce Proactive and Responsive PUBLIC INFORMATION and COMMUNITY RELATIONS Page 7 Goal: Create Engaging EMPLOYEE COMMUNICATIONS Page 8 Goal: Citizens Engagement Process Page 8 Goal: Develop versatile VISUAL CONTENT Library Page 9 HOW WE MEASURE SUCCESS 2021-2022 Page 10 APPENDIX CITIZEN ENGAGEMENT PLAN 4 Goal: Deliver Effective CRISIS COMMUNICATIONS residents will depend on in the event of an emergency Strategy: Be a key resource for residents, businesses, and media partners for up to date information during emergency situations in or near the Town of Fountain Hills. Emergency situations include: wildfires, floods, public safety, and road closures. Action Steps: • Be proactive with communications and anticipate the needs of residents to ensure emergency preparedness during the wildfire and/or monsoon seasons for example. Share information and resources to help residents be prepared in the event of an emergency. • Produce up-to-the-minute communications in the event of an emergency. Provide accurate and current information and resource information as it becomes available. o Work closely with agency PIOs to disseminate and share critical information o Develop a communications network among Town departments and business/social organizations to distribute critical information to clients/customers/residents • Develop strong media relations which are utilized to provide current and accurate information about emergency situations in Fountain Hills. o Press releases and direct communications with reporters will provide accurate information to the media. o Town’s PIO will establish a media safe zone for interviews with Town officials, and live updates to the media. • Develop emergency communication resources to provide residents and media with up-to-the- minute information during an emergency o Social Media – Facebook and Twitter will be utilized to share current situational information and will be updated frequently as needed. Each post will have a time stamp ensure the information is the latest. o CodeRed – Subscribed residents will be updated with latest information of events and activities. An ongoing registration campaign will raise participation. o Website – fh.az.gov will have information of an ongoing event updated each hour, if available. o FH Emergency Hotline – if developed, this will allow residents who do not subscribe to digital resources to call a dedicated phone number with a recorded message for current emergency information (Wildfires, Floods, Road Closures) o Ch. 11 – In the event of a major emergency, the channel will be used to post available resources and emergency contact information. • Promote Town emergency communication resources to community residents: CodeRed, Social Media (Facebook, Twitter, and NextDoor), and Website, Ch. 11. In the event of an emergency these channels will be utilized to communicate with residents. 5 Goal: Produce highly visual and informative SOCIAL MEDIA posts that engage the community • Facebook, Twitter, Instagram, LinkedIn, NextDoor, YouTube Strategy: Use social media to communicate Town information, promote events, and emergency communications to the public and employees. Action Steps: • Share external information via the Town’s social media sites (Facebook, Twitter, Instagram, LinkedIn, and YouTube) following best practices, the Town of Fountain Hills Social Media Policy and tailoring our message to targeted audiences. • Utilize video, digital and multimedia content to support and enhance communication. • Manage content contributed by departments • Update the Social Media Policy as needed • Develop video and audio content for distribution on Social Media • Monitor social media closely to address concerns and trends in communications from residents • Develop cross promotional opportunities on social media for various Town departments (i.e. tourism, economic development, community services) • Develop social media advertising when appropriate and requested to promote Town events • Develop promotional opportunities on Facebook through “boost” avenues to increase likes and shares when appropriate • Monitor and archive interactions on all Town social media sites through ArchiveSocial Goal: Build and maintain strong MEDIA RELATIONS Strategy: Be responsive, timely and accurate regarding media inquiries, proactively promote Town information as media stories, and seek media coverage for special events and programs. Action Steps: • Always be responsive to media inquiries with a less than one-hour reply • Develop and distribute media releases to media list which includes FH Times, news outlets in the Phoenix Metro, and other media outlets as necessary • Direct communication in person, on the phone, via email, with reporters to deliver information, discuss stories and schedule interviews. • Meet with Town departments to develop and plan media strategies • Conduct media training for department directors and staff to prepare for interviews 6 • Collect media inquiries from around the Town and send a weekly media inquiry summary to Town Manager Goal: Build a strong Online Digital Management System WEBSITE (fh.az.gov or fountainhillsaz.gov) and INTRANET (https://intranet.fh.az.gov/ ) Strategy: Use the Town’s external and internal websites to communicate Town information to the public and employees. Action Steps: • Update the design of the Town of Fountain Hills website so that it is easy to navigate and people can quickly find what they are looking for. o Average 2-4 minutes per visit o Increase overall visitors o Visual site that promotes the town brand • Maintain and/or refresh content o Follow analytics and work with departments to remove any content that is no longer relevant or is outdated. o Update visuals on site • Support departments in creating content that meets standards for accessibility so that all visitors to fh.az.gov are able to access the content they need. • Utilize video, digital and multimedia content to support and enhance communication o Add current content relevant to employees to Intranet o Archive or remove content that is outdated • Utilize video, digital and multimedia content to support and enhance communication • Support departments in creating content that meets standards for accessibility so that all visitors to fh.az.gov are able to access the content they need. 7 Goal: Produce Proactive and Responsive PUBLIC INFORMATION/COMMUNITY RELATIONS Strategy: Encourage proactive community engagement with Town leadership and departments. Community engagement campaigns will increase awareness, transparency and active citizen participation. Community engagement activities will be focused around Town initiatives and delivered based on community interest. Action Steps: • Produce engaging and informative quarterly community newsletter – Fountain Hills Insider • Develop strategic community relations plan to guide current and future efforts • Be a trusted Town resource for community questions and guide Town residents to the best resource to help answer their specific concern • Hold community meetings and meet with key stakeholders specifically related to major Town initiatives • Speak to groups and organizations proactively and regularly about Town services. (PIO, Town Manager, Department Leads) • Develop communication strategies to target select demographic groups. (Youth, Seniors, for example) • Participate in Town Podcast and Valley Focus radio interviews and redistribute on social media and Town’s websites • Develop informative slides for Ch. 11 government channel playback • Create posters, fliers, and mailers as necessary Goal: Create Engaging EMPLOYEE COMMUNICATIONS Strategy: Town employees are an important marketing and communications tool which enhances the Town’s messaging strategies. A strong Employee Communications program will provide important, timely and accurate information to all employees using a variety of communication channels. Action Steps: • Produce All Staff emails when needed to communicate urgent information to employees. • Produce and email monthly newsletter to employees to highlight events and feature stories. • Design posters, bulletin boards, mailed letters, and other products as needed. • Help Human Resources in communicating important news and educational information. • Proactively use Town social media sites including Facebook, Twitter, Instagram and LinkedIn to tell the Town of Fountain Hills story. 8 • Post relevant internal information to intranet.fh.az.gov o Calendars, HR information, Events Goal: CITIZENS ENGAGEMENT Strategy: A well-informed citizenry is crucial for effective government communications and strong accountability of government agencies and leadership. Civic engagement creates and maintains an educated, aware, motivated, engaged, and fulfilled community. The level of public engagement can range from keeping the public informed to involving the public’s participation in the decision-making process. Engaging the public early and at the appropriate level helps create buy-in for the process and the final decision. Action Steps: • Outline Needs and Desired Outcomes: o Create clear activity outline defining goals and outcomes; o Identify decision makes and dates when formal decisions will be made o Determine the level of public engagement based on the scope and impact of the project o Determine which public to target and how to engage them o Develop a timeline to achieve public engagement o Determine how to measure and archive public engagement results o Determine how the results will be shared with the public Goal: Develop versatile VISUAL CONTENT Library Strategy: Share Town of Fountain Hills’ story with photographs and video content. Action Steps • Develop a digital media library of photographs and video for all Town department use • Take and share photographs of events, activities, and projects to enhance the messaging for the Town’s communications. • Take and create video content for use in social media, web, and for video programming (State of the Town, etc.) • Use visuals for Ch. 11 slides where appropriate 9 HOW WE MEASURE SUCCESS 2021-2022 Goal: Deliver Effective CRISIS COMMUNICATIONS residents will depend on in the event of an emergency • Goal ZERO complaints about emergency communications • Each designated emergency event hits targets of Social Media, Webpage, Code Red (if applicable), FH Times/Media Goal: Produce highly visual and informative SOCIAL MEDIA posts that engage the community. • Increase platform likes/followers by 2% yearly • Increase in engagement/shares • Reach Goal: Build and maintain strong MEDIA RELATIONS • Measure and track through online media tracking service (TVeyes) • Stories generated • Advertising value, where measurable • Impressions, readership and viewership • Increased year over year TV and Radio placements • Increased external sites online placements Goal: Build a strong Online Digital Management System • New website design • Increase overall usage • Maintain 2-4 minutes per visit Goal: Produce Proactive and Responsive PUBLIC INFORMATION/COMMUNITY RELATIONS • Quarterly publication home delivered within 5 days of target date • 24-hour response to resident inquiries • Attend major community events • Represent Town at community meetings • Community Survey 2021 Create Engaging EMPLOYEE COMMUNICATIONS • Create yearly Survey Monkey for internal usage • Increase usage of Intranet Chat communications • Monthly employee newsletter distributed on last pay-day of month Goal: Develop a versatile VISUAL CONTENT Library • Visual Library established in June 2021 • All Departments utilizing in 2021 Citizen Engagement Plan 2021 PREPARED BY BO LARSEN COMMUNITY RELATIONS MANAGER 2021 Communications Plan Appendix A well-informed citizenry is crucial for effective government communications and strong accountability of government agencies and leadership. Civic engagement creates and maintains an educated, aware, motivated, engaged, and fulfilled community. The level of public engagement can range from keeping the public informed to involving the public’s participation in the decision- making process. Engaging the public early and at the appropriate level helps create buy-in for the process and the final decision. Citizen Engagement brings government and citizens together to foster collaborative conversations, build positive relationships, and promote new, innovative ways for citizens to be informed, engaged, and involved in decision making. Through the use of social media, other digital platforms, neighborhood collaboration, public outreach, and other special projects, the Public Information/Community Relations Office provides a one- stop-shop for engaging with the public. The Town of Fountain Hills is committed to being approachable, transparent, and accessible. Advancing the free flow of accurate and truthful information is essential to serving the public interest and contributing to informed decision-making. By communicating clearly, the Town will maintain relationships with the media, government officials, and the public. Most importantly, keeping these stakeholders informed will build the relationship between Town leaders and citizens, promote trust and respect between local government and its constituents, and create an atmosphere that invites citizen involvement in decisions that affect the community. 2 Connecting with Residents on Key Policy and Election Issues Town Council and the Town Administration make decisions that often have a direct effect on residents and businesses. Decisions made can be in a policy, recommendation for bonds, ballot initiatives on an upcoming election or changes to the Town budget, as examples. It is imperative that when programs, policies and election related decisions are enacted that residents are made aware and have the opportunity for comment. The Citizen Engagement Plan provides a guideline in how the Town will communicate with constituents on important topics and issues. Elections The Town of Fountain Hills holds elections every even year for Mayor and eligible Town Council seats, and any ballot initiatives. All elections for county and town initiatives and representatives are managed by the Maricopa County Elections Department. When elections are occurring in Fountain Hills, the Town follows strict guidelines set forth by the county elections department, and provides information to the public. Town Communication Tools Messaging Town Website – www.fountainhillsaz.gov The Town of Fountain Hills’ Town Clerk maintains an election page www.fountainhillsaz.gov/180/Elections- Elecciones that provides Voter Registration information, Campaign Finance Reports, Election Results, Forms & Information, Local Candidate Elections, and candidate and referendum information. Media The Town will promote upcoming elections and information about these elections in the Fountain Hills Times through press releases. Press releases for elections at www.fountainhillsaz.gov/674/Public- Information-Office 3 Messaging Publication of Election Information Town produces a printed election overview of upcoming elections and referendum for Fountain Hills’ residents to review. Town Council Meetings Town Hall Meetings Press Conferences Open Houses Town Sponsored Meetings Public meetings may be held to allow residents to ask questions of Town leadership or candidates. www.fountainhillsaz.gov Town website provide information about the election and where residents may vote in person, or drop-off mail-in ballots. www.recorder.maricopa.gov/elections Maricopa County Elections Department administers city, town, school district, special district, state and federal elections in Maricopa County. Town of Fountain Hills Public Information Office will announce upcoming elections and provide links to appropriate Town/County websites. Social Media 4 Town Communication Tools News Releases Cox Cable Channel 11 Speakers Bureau and Community Outreach Town provides written information for local and regional print and website media with factual information about Town policies and events. Cox Cable provides a government access channel (11) to the Town. Static displays and short videos are shown about upcoming events or items of community interest. Town Council or Town Leadership are invited to community civic organizations and stake holders to provide updates on Town activities. Major and Minor Policy The Town Council of Fountain Hills makes policy decisions for Town staff to implement. Policy is a “law, regulation, procedure, administrative action, incentive, or voluntary practice of governments and other institutions. Policy decisions are frequently reflected in resource allocations” (www.merriam-webster.com/dictionary/policy). When policies are enacted, either major or minor is scope and resources, the Town will communicate this information to residents. An example of a major policy could be a change to utilization fees of a park or sign ordinance change. A minor policy or “guiding principle” example could be a liquor license approval or approval of new board commissioners. MessagingPolicy Town Website www.fountainhillsaz.gov All Policies Information about approved policies is available on the Town’s website through the agenda management system - Agenda - View Meetings (destinyhosted.com) Media Major Policies - Major Policy approvals have a larger impact to Town resources (staff time and financial), and will bring more impact to residents. Town press release (s) about the policy and its impacts are shared with local print media, and other media outlets if deemed of high interest. Local media will publish a story about the policy change in the Fountain Hills Times. 5 Communication Tools MessagingPolicy Town Website www.fountainhillsaz.gov Major Policies Press release shared on Town Website Information is posted on the appropriate department website pages. Social Media Major Policies If a policy has an impact on the entire community then a social media posting is warranted to educate the public. Fountain Hills Insider – Newsletter Major Policies Major policies will generally have an effect on residents. Articles will highlight the benefits and impacts of the policy. Mayor and Town Council Major Policies Any press releases delivered to Town Council prior to local publication. Town Website www.fountainhillsaz.gov Information may be found at - Agenda - View Meetings (destinyhosted.com) Information may be found on Department website pages if needed Minor - Depending on the impact of the policy to residents or Town operationsThough a policy may have little to no effect on residents, there may be an interest. Depending on the uniqueness of the minor policy Social Media may be utilized to promote or highlight the minor policy. 6 Communication Tools Bond Referendums A bond referendum is a voting process that gives voters the power to decide if a municipality should be authorized to raise funds through the sale of bonds. Town Council may choose to ask residents for additional funding to support major capital projects. These projects may include streets repair and replacement, park construction, Fountain Lake repairs, or other infrastructure need that far exceeds the normal Town budget. Messaging Media Town will produce press releases to raise awareness of the referendum for local newspapers, radio, and television news outlets. Town Website www.fountainhills az.gov Town would have an information page on the bond referendum to explain what it would accomplish. Social Media Town social media postings would highlight what the bond referendum would accomplish, and links to an information page on the Town’s website www.fountainhillsaz.gov. Newsletter – Fountain Hills Insider Town would publish awareness articles in the Town produced newsletter to educate readers on the purpose and cost of the referendum. Cox Channel 11 (Government TV channel) Mayor and Town Council Town may place awareness slides and or video of the proposed referendum to educate viewers. Town Council will receive press release information prior to local publication7 Communication Tools Budget Process, Adoption and Updates Transparency is a core value of governmental budgeting. Good public participation practices can help governments be more accountable and responsive to their communities and improve the public’s perception of governmental performance and the value the public receives from their government. Developing a transparent budget process will enhance the government’s credibility and trust within the community. Messaging Media Town will produce press releases to raise awareness about public meetings with discussions concerning Town budget Town Website www.fountainhills az.gov Town has an information page on the budget process and the approval timelines. Newsletter – Fountain Hills Insider An article will provide an overview of the Town's budget. Mayor and Town Council Town Council will receive press release information prior to local publication 8 Communication Tools Get Connected. Stay Connected. Residents of Fountain Hills are provided with a variety of passive communication outlets to stay engaged and be informed of Town activities and services, events, and public meetings. Social Media – The Town uses a variety of Social Media outlets to share information concerning Town activities and events. Fountain Hills Facebook – @ TownofFountainHills Twitter - @ fhazgov Instagram – @ townoffountainhills LinkedIn – @ town-of- fountain-hills YouTube – @ /c/TownFountainHills Economic Development LinkedIn - @ fountain-hills- economic-development Community Services Facebook - @ fhparksandrec Instagram - @ fountainhillsrec Citizen Connection Opportunity Residents have the ability to be an active participant in the conversation, and respond to Town posted communications in an appropriate manner. Town of Fountain Hills Website – The newly revised Town website provides a nearly complete overview of all departments, services and activities for the Town of Fountain Hills. www.fountainhillsaz.gov Residents can keep up to date with news through the press release feature, see upcoming meeting notices, and contact department staff and Town leaders. Town of Fountain Hills Cox Cable 11 and YouTube recordings Cox Cable Ch. 11 www.fountainhillsaz.gov/386/Channel-11 YouTube www.youtube.com/c/TownFountainHills Ch. 11 on Cox Cable is a channel dedicated to government communications. Residents can watch a live broadcast of the Town Council meetings, as well as other information about upcoming events. All Town videos are available on YouTube. 9 Communication Tools Get Connected. Stay Connected. Fountain Hills Insider – Town of Fountain Hills community newsletter Delivered quarterly to all Town residential homes and businesses Citizen Connection Opportunity Articles in the Fountain Hills Insider provide a call-to-action to contact Town departments or Town leadership Media Relations – Public Information uses local and regional media outlets to share stories of upcoming events, projects or critical news. Most Common News Outlets - Fountain Hills Times - fhtimes.com - Arizona Republic - AZCentral.com - ABC15 - 12News - Fox10News - AZFamily (Ch. 3 & 5) - KTAR – 92.3 FM - KFYI – 550 AM - KJZZ (NPR) 91.5 FM The Fountain Hills Times will publish and report stories about Town events and activities on a weekly basis. Regional news media outlets carry Fountain Hills stories Public Town Meetings and Community Outreach Events - Town Council Meetings - Boards and Commission Meetings - Community Events and Outreach Attending Town meetings allows residents to learn about important issues being discussed, and these meetings allow for input from the public. 10 Communication Tools Staying Informed During an Emergency Most emergencies occur unexpectedly, and information provided by neighbors, social media, and many times, local media is often not current or accurate for the moment. Emergencies include wildfires, floods, public safety, and road closures. The Town of Fountain Hills is the critical resource for residents, businesses, and media partners for up- to-date information during emergencies in or near the Town of Fountain Hills. Town Website – www.fountainhillsaz.gov Home page notices are updated as new information becomes available. A date and time stamp will show the most current updates. The Town will use Facebook – @ TownofFountainHills and Twitter - @ fhazgov to send up-to-the-minute information as it becomes available. Social Media CodeRED is a FREE emergency notification service provided to all residents within Fountain Hills. The system sends an emergency message through phone calls, text messages, emails, social media and the CodeRED Mobile Alert app. The system is used to keep residents informed of local events that may immediately impact their safety. Receive notifications for: - Missing Children - Emergency Preparedness - Emergency Evacuation Notices - Wildfires - Public Health Crisis - Criminal Activity CodeRED Local news media will report on incidents occurring in Fountain Hills. Local News Media 11 Staying Informed During an Emergency Most emergencies occur unexpectedly, and information provided by neighbors, social media, and many times, local media is often not current or accurate for the moment. Emergencies include wildfires, floods, public safety, and road closures. The Town of Fountain Hills is the critical resource for residents, businesses, and media partners for up- to-date information during emergencies in or near the Town of Fountain Hills. Town Website – www.fountainhillsaz.gov Home page notices are updated as new information becomes available. A date and time stamp will show the most current updates. The Town will use Facebook – @ TownofFountainHills and Twitter - @ fhazgov to send up-to-the-minute information as it becomes available. Social Media CodeRED is a FREE emergency notification service provided to all residents within Fountain Hills. The system sends an emergency message through phone calls, text messages, emails, social media and the CodeRED Mobile Alert app. The system is used to keep residents informed of local events that may immediately impact their safety. Receive notifications for: - Missing Children - Emergency Preparedness - Emergency Evacuation Notices - Wildfires - Public Health Crisis - Criminal Activity CodeRED Local news media will report on incidents occurring in Fountain Hills. Local News Media 11 Staying Informed During an Emergency Most emergencies occur unexpectedly, and information provided by neighbors, social media, and many times, local media is often not current or accurate for the moment. Emergencies include wildfires, floods, public safety, and road closures. The Town of Fountain Hills is the critical resource for residents, businesses, and media partners for up- to-date information during emergencies in or near the Town of Fountain Hills. Town Website – www.fountainhillsaz.gov Home page notices are updated as new information becomes available. A date and time stamp will show the most current updates. The Town will use Facebook – @ TownofFountainHills and Twitter - @ fhazgov to send up-to-the-minute information as it becomes available. Social Media CodeRED is a FREE emergency notification service provided to all residents within Fountain Hills. The system sends an emergency message through phone calls, text messages, emails, social media and the CodeRED Mobile Alert app. The system is used to keep residents informed of local events that may immediately impact their safety. Receive notifications for: - Missing Children - Emergency Preparedness - Emergency Evacuation Notices - Wildfires - Public Health Crisis - Criminal Activity CodeRED Local news media will report on incidents occurring in Fountain Hills. Local News Media 11 Fountain Hills Insider Each quarter, homeowners in Fountain Hills receive an eight-page newsletter from their town government called the Fountain Hills Insider. This publication, produced by the Community Relations Department, provides an overview of recent events, town achievements, and critical upcoming activities. Each issue contains contact information for Town services, Town Council, and other community resources. 11 Digital Services and Social Media The Town's website page, www.fountainhillsaz.gov, contains all the information a visitor and resident needs to be informed about services, programs, and critical information in the event of an emergency. Social Media platforms like Facebook, Instagram, Twitter, LinkedIn, and YouTube used by the Town keep residents in the know on events, services, Town activities, and emergencies. 11 27 Stay current and follow the Town of Fountain Hills www.fountainhillsaz.gov @fhazgov @TownofFountainHills @townoffountainhills @town-of-fountain-hills /TownFountainHills 16705 E. Avenue of the Fountains Fountain Hills, Arizona 85268 480-816-5100 ITEM 7. A. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Consent                  Submitting Department: Administration Prepared by: Elizabeth A. Klein, Town Clerk Staff Contact Information: Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Approval of the minutes of the Regular Meeting of March 1, 2022.  Staff Summary (Background) The intent of approving meeting minutes is to ensure an accurate account of the discussion and action that took place at the meeting for archival purposes. Approved minutes are placed on the Town's website and maintained as permanent records in compliance with state law. Related Ordinance, Policy or Guiding Principle N/A Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) Staff recommends approving the minutes of the Regular Meeting of March 1, 2022. SUGGESTED MOTION MOVE to approve the minutes of the Regular Meeting of March 1, 2022.  Attachments Minutes  Form Review Form Started By: Elizabeth A. Klein Started On: 03/03/2022 03:58 PM Final Approval Date: 03/03/2022  TOWN OF FOUNTAIN HILLS MINUTES OF THE REGULAR MEETING OF THE FOUNTAIN HILLS TOWN COUNCIL MARCH 1, 2022                  1.CALL TO ORDER AND PLEDGE OF ALLEGIANCE – Mayor Dickey    Mayor Dickey called the Regular Meeting of the Fountain Hills Town Council held March 1, 2022, to order at 5:30 p.m. and led the Council and audience in the Pledge of Allegiance.   2.MOMENT OF SILENCE    A Moment of Silence was held.   3.ROLL CALL – Mayor Dickey Present: Mayor Ginny Dickey; Vice Mayor Gerry Friedel; Councilmember Peggy McMahon; Councilmember Mike Scharnow; Councilmember Alan Magazine; Councilmember David Spelich; Councilmember Sharron Grzybowski Staff Present: Town Manager Grady E. Miller; Acting Town Attorney Trish Stuhan; Town Clerk Elizabeth A. Klein 4.REPORTS BY MAYOR, COUNCILMEMBERS AND TOWN MANAGER    Town Manager Grady Miller introduced Acting Town Attorney Trish Stuhan. Vice Mayor Friedel recognized Fire Chief Dave Ott. He said that he had reached out to Chief Ott regarding the possibility of the Fire Department accompanying the Fountain Hills High School Boys Basketball Team out of Town. He said that the department led the procession, along with members of other organizations as they headed to the State Semi-Finals. He congratulated the Falcons on their success. He said that he attended a ribbon cutting for Batchelor's Pad and he and the Mayor attended the ADOG dog park ribbon cutting. He said that one of their members had donated $27,000 for a new shade structure at the park, stating that it was a great partnership. He also spent time at the Art Fair, noting it was the busiest he has seen the fair in quite a while. It was exciting to see and he hoped the vendors did well. He also reported that the Town would be lighting the fountain on Wednesday evenings through the month with alternating blue and yellow to show the Town's solidarity with Ukraine. Councilmember Scharnow reported that he and the Mayor were at the high school waving good bye to the basketball team as they left for the semi-final game. He said that the Fire Department was there and the Sheriff's Department had a big part, as well as the Street Department. He said that Dwight Johnson pulled that together. He said that he was at the Fair with the Noon Kiwanis food booth and they were very busy all day Sunday. Councilmember Magazine said that he was the fair as an artist, and the crowd was incredible, and the weather was fabulous. It was the best show he has had in years, and he complimented the Chamber of Commerce for its success. Councilmember Grzybowski said she virtually attended the East Valley Economic Vitality Committee meeting, and the key takeaway was that they need all price points in single and multifamily housing. She also attended a virtual meeting with GPEC where they reviewed the regional report. While the call was about health care, work force investments are the key to the future, including work force housing. She also attended one legislative update call, but would reserve her comments until the end of the agenda. Mayor Dickey said the Council held their Council Retreat last week, and she encouraged everyone to watch it on YouTube. She thanked staff and her colleagues and volunteers that help them look back, look at what they are doing, and look into the future. She said that she also attended the ribbon cutting for Batchelor's and it smelled so good that it almost got her back in meat. And, the ADOG donation was awesome and she appreciated the donor's generosity. She said that the County Board of Supervisors appointed someone to replace Supervisor Chucri, and she met with his office. She said that it is important to keep up talks with the County, especially regarding the Flood District.   5.SCHEDULED PUBLIC APPEARANCES/PRESENTATIONS   A.PRESENTATION: Report by Amy Burnette, Arizona Game & Fish Information & Education Program Manager, regarding wildlife.    Amy Burnette, Arizona Game & Fish Information & Education Program Manager, gave a PowerPoint presentation on Living with Wildlife in Fountain Hills, attached hereto and made a part hereof as Exhibit A.   B.Overview of Town of Fountain Hills citizen satisfaction of services survey presented by Ryan Murray of ETC Institute.       Ryan Murray with ETC Institute presented a PowerPoint presentation on the results of the recent citizen satisfaction of services survey, attached hereto and made a part hereof as Exhibit B.   6.CALL TO THE PUBLIC Pursuant to A.R.S. §38-431.01(H), public comment is permitted (not required) on matters NOT listed on the agenda. Any such comment (i) must be within the jurisdiction of the Council, and (ii) is subject to reasonable time, place, and manner restrictions. The Council will not discuss or take legal action on matters raised during Call to the Public unless the matters are properly noticed for discussion and legal action. At the conclusion of the Call to the Public, individual councilmembers may (i) respond to criticism, (ii) ask staff to review a matter, or (iii) ask that the matter be placed on a future Council agenda. Town Council Regular Meeting of March 1, 2022 2 of 12    The following individuals addressed the Town Council: •Gail Conn, Fountain Hills, voiced concern with attendees at the festival held last weekend parking their cars in front of fire hydrants, and officers not writing citations. •Liz Gildersleeve, Fountain Hills, voiced concern with the proposed ASRS membership, stating that the presentation was slanted, and it would add another $150,000 each year in fixed employee compensation costs. She said that only three on Council pushed back and asked substantive questions. Councilmember Spelich asked if the Town would be required to increase employee salaries to make them whole. •Crystal Cavanaugh, Fountain Hills, said that they would soon be considering stricter restrictions on group homes, and limiting the occupancy is the key. There should be a cap of no more than five, including the caretaker. She said that they should start building a legal defense fund, and the League should collaborate with them. •Larry Meyers, Fountain Hills, thanked staff for working on something that he brought to them regarding ordinances of the town. He said that if it is written down, followed, and never waived for anyone, they will not have any problem. If it is modified, it should be through a public process. Councilmember Magazine said that he listened to Mr. Trimble's long presentation on the Arizona State Retirement System and does not understand it. It would be helpful for him to see a list of pros/cons of the system. Mr. Miller said that they would share with the Council the same one they shared with employees. He said that since the Town Council had further questions, he would come back at a later time with this issue. Mr. Miller reported that, in response to the resident regarding fire hydrants being parked in front of during the Fair, he was texted by MCSO that they were ticketing people, but the timing may have been off. He apologized for the response of the officer on the street.   7.CONSENT AGENDA ITEMS All items listed on the Consent Agenda are considered to be routine, noncontroversial matters and will be enacted by one motion of the Council. All motions and subsequent approvals of consent items will include all recommended staff stipulations unless otherwise stated. There will be no separate discussion of these items unless a councilmember or member of the public so requests. If a councilmember or member of the public wishes to discuss an item on the Consent Agenda, he/she may request so prior to the motion to accept the Consent Agenda or with notification to the Town Manager or Mayor prior to the date of the meeting for which the item was scheduled. The items will be removed from the Consent Agenda and considered in its normal sequence on the agenda.    MOVED BY Councilmember Sharron Grzybowski, SECONDED BY Councilmember David Spelich to approve Consent Agenda Items 7-A through 7-D.  Vote: 7 - 0 Passed - Unanimously   A.CONSIDERATION AND POSSIBLE ACTION: Approval of the minutes of the Regular Meeting of February 15, 2022.      Town Council Regular Meeting of March 1, 2022 3 of 12 B.CONSIDERATION OF Approval of Contract C2022-036.1 with Matlick Enterprises, Inc. dba United Fire Equipment Company in an amount not to exceed $32,000.00 for three thermal imagining cameras for firefighter safety.      C.CONSIDERATION OF Resolution 2022-08 approving the 2021 Maricopa County Multi-Jurisdictional Hazard Mitigation Plan.      D.CONSIDERATION AND POSSIBLE ACTION: Resolution 2022-07, abandoning the 10' Public Utility and Drainage Easement along the south side of 15113 E Greene Valley Drive (Application A22-00003)      8.REGULAR AGENDA   A.CONSIDERATION AND POSSIBLE ACTION: to Adopt the 2022 Strategic Plan.      Chairman John Craft of the Strategic Planning Advisory Commission said that they presented earlier to the Council on the draft Strategic Plan and had integrated the Council's comments into the final Plan. He gave a PowerPoint presentation which addressed the following: STRATEGIC PLAN 2022 Guiding Principles COMMUNITY & STAKEHOLDER INPUT PRIMARY COMMUNITY INTERESTS Business Development Technology Services Town's Condition Environment Town Finances Safety KEYNOTE THEMES IN THE PLAN'S DEVELOPMENT Collaborative Partnering Transparency & Ownership Stewardship of Local Environment STRATEGIC PRIORITIES NOTEWORTHY FINAL REVISIONS TO PLAN Eliminated all supplemental work documents from the Plan including SWOT analysis Deleted three (3) original supporting tasks, including the biennial budget option, as being inconsistent with the Plan's focus Modified 15 supporting tasks to reflect a more proactive tone Modified 6 signature strategies TARGETED COLLABORATIVE ECONOMIC DEVELOPMENT Signature Strategy #1 Retain existing businesses & attract new ones Signature Strategy #2 Lead the formation of collaborative economic development groups Town Council Regular Meeting of March 1, 2022 4 of 12 PROMOTE LONG-TERM FINANCIAL SUSTAINABILITY OF TOWN INFRASTRUCTURE, ENVIRONMENTAL AND SOCIAL SERVICES Signature Strategy #1 Maintain transparency by communicating the Town's finances to the public Signature Strategy #2 Promote long-term financial health and stability of the Town (Ownership) Signature Strategy #3 Periodically review Town services to identify opportunities for improving efficiency and effectiveness Councilwoman McMahon said, in reference to the task of holding public meetings separate from regular meetings to discuss the finances of the Town, that the Town has been extremely transparent. There have been over 12 opportunities for them to actively participate. She said that all the finances are on the website; she feels the transparency is already there. Mr. Miller said that they did not have much of an issue with this; he did agree with her. Being the liaison for the Commission he heard a lot of background discussion. It fits with the survey, communication, etc. There is a lot of information out there; they need to find way to get people to the sessions. One thought that the Commission had was to take the initiative to address the various service organizations around Town and solicit feedback. Councilmember Magazine said that they have such sessions in the past at the community center, and perhaps they could advertise. Mayor Dickey added that they already hold one of these meetings each year and have started holding quarterly updates from staff. Councilmember Scharnow said that he agreed with that, trying to be more creative. He liked the idea of going to the various groups in town. It was clarified that the referenced researchers and grant writer would work in a proactive manner, not as an employee. CONTINUE TO IMPROVE THE PUBLIC HEALTH, WELL-BEING, AND SAFETY OF OUR TOWN Signature Strategy #1 Promote the natural and built environment of Fountain Hills to promote health, well-being and safety Signature Strategy #2 Promote Fountain Hills as a community focused on public health, well-being, and safety (Stewardship) MAINTAIN CURRENT INFRASTRUCTURE WHILE PREPARING OUR TOWN FOR EMERGING TRENDS THAT INCREASE PUBLIC SAFETY AND QUALITY OF LIFE Signature Strategy #1 Develop an investment plan and schedule to maintain/bring FH's streets, medians, buildings, and parks to established standards Signature Strategy #2 Support local broadband buildouts and deployment efforts while ensuring the preservation Town Council Regular Meeting of March 1, 2022 5 of 12 of conduit right of way for future technologies (Stewardship) Signature Strategy #3 Increase ease and safety of multi-use aspects of Fountain Hills roads (Stewardship) Signature Strategy #4 Utilize services provided by other government agencies and outside entities in evaluating and supporting the health of Fountain Hills parks (Collaborative partnering) Councilmember Scharnow said that he thought they had already done a lot of this through the Pedestrian and Traffic Safety Committee, and through the Active Transportation Plan. Councilmember McMahon suggested that on Signature Strategy #3, the first Supporting Task stated that "The FH Town Council Subcommittee on Pedestrian & Traffic Safety will identify roads...." She believes that they already do that so perhaps they add, "will CONTINUE TO" prior to identify roads. Councilmember Scharnow questioned "benchmark" under the Supporting Task of Signature Strategy #4, asking if that meant ranking it. Mr. Miller said that as part of the Parks Master Plan they talked about trying to follow the nationally-recognized standards. He said that they could remove the word "benchmark" and replace it with, "nationally-recognized standards for maintenance of the," Town's park system. Discussion was held on the first Supporting Task for Signature Strategy #3, again, and Councilmember McMahon suggested instead of it reading, "and produce a plan," it could be changed to, "and continue to update plans and schedules." All agreed. Councilmember Magazine said that this took some really heavy lifting and wanted to compliment and thank John, the Commission, and staff for their work. Mayor Dickey said that she appreciated they were willing to listen to the Town Council and incorporate their comments into the Plan.    MOVED BY Councilmember Peggy McMahon, SECONDED BY Councilmember Alan Magazine to adopt the 2022 Strategic Plan subject ot the stipulations mentioned (1-changing the wording of Supporting Task one under Signature Strategy #3 of MAINTAIN CURRENT INFRASTRUCTURE WHILE PREPARING OUR TOWN FOR EMERGING TRENDS THAT INCREASE PUBLIC SAFETY AND QUALITY OF LIFE, to read, "The FH Town Council Subcommittee on Pedestrian & Traffic Safety will continue to identify roads where lack of a safe and interconnected sidewalk system increases risk to pedestrians and continue to update plans and schedules to remedy; and 2-under Signature Strategy #4, first Supporting Task change to read, "Utilize nationally-recognized standards for maintenance of the Town's park system.")  Vote: 7 - 0 Passed - Unanimously   Town Council Regular Meeting of March 1, 2022 6 of 12             B.CONSIDERATION AND POSSIBLE DIRECTION: regarding a site plan for Park Place Phase II (16845 E. Avenue of the Fountains) and Phase III (13000 block of N. Verde River, west side).       Development Services Director John Wesley began a PowerPoint presentation to review the proposed site plan for Park Place Phase II and III which addressed: BACKGROUND REGULATORY DOCUMENTS - DEVELOPMENT AGREEMENT REGULATORY DOCUMENTS - GENERAL PLAN REGULATORY DOCUMENTS - SPECIFIC PLAN REGULATORY DOCUMENTS - ZONING SITE PLAN - PHASES II AND III - BUILDINGS E AND F SITE PLAN - PHASE II, BUILDINGS E & F Mr. Wesley reviewed the parking calculations. He said that the lowest level is garage level, with 3800 sq. ft. of commercial space, with stairs required to access. He said that commercial signage goes on the suite of the use, so signage would not be visible. He said that the Development Agreement did make a height exception, but it is not on this building. SITE PLAN - PHASE III, BUILDING B Councilmember Spelich said that he looked at this a few times and listened to the Planning and Zoning Commission meeting. He asked what the difference was between this and what the commission approved. Mr. Wesley said that there are two major differences. First, the art walk was narrowed; and second, the Commission was looking for Building F to become a more active overall view--similar to American Sports Grill across the street, and that is really not seen in the revised drawings. Councilmember Spelich said that when they made their motion, it was approved unanimously, but with the changes they wanted and those changes have not been made. Mr. Wesley said that their motion included the wording, "to explore the possibilities" with regard to the commercial space. The Planning and Zoning Commission Chairman said that this is not what he was expecting to see. Discussion was held on the commercial aspect of the building and in the end, when asked by Council, Mr. Wesley said that it was incomplete. Vice Mayor Friedel said that he was at the Planning and Zoning Commission meeting for over 2.5 hours. He left that meeting believing that there would be commercial on the corner, but having that commercial in the basement is a dealbreaker. Discussion was then held on the parking along the Avenue of the Fountains and the ingress/egress off of the Avenue. Mr. Wesley said that they are telling them that, with agreements, the development designs work together. Councilmember Scharnow said that the access drive is not going to look good, and asked why they need it. Mr. Wesley said Town Council Regular Meeting of March 1, 2022 7 of 12 that it will be for visitor parking and deliveries. Mayor Dickey said that her understanding regarding the corner was there would be an outdoor area, for possibly a restaurant with outside seating. Mr. Wesley said that he did not hear them say that so clearly, but he did hear "active." Bart Shea asked if the site plan met the technical requirements. Mr. Wesley said that he still has concerns with the commercial space, and whether it is a first floor. Mr. Shea said that it is similar to Georgie's. He said that when they first negotiated the development agreement he wanted commercial on the corner. Mr. Miller said that the Planning and Zoning Commission did believe it met the technical requirements, but they added the two stipulations. Mr. Shea said that they have a parking area for 130 stalls accessed from Paul Nordin and Verde River Rd. He said that it took two years to negotiate the development agreement with the Town; they have put some commercial on the corner and expedited everything to get this in on time. After further discussion, Mr. Wesley said that the Commission, in their motion, did say "explore" bringing commercial under Building F to the corner, up on the first floor above grade level, so it was visible and active. He does not believe it meets what the Planning and Zoning Commission requested. Mr. Shea said that in Sec. 5.8 of the development agreement, it says the building will be all residential. Mr. Wesley read from Sec. 5.8, noting that it says it may be all residential; it did not preclude commercial. Councilmember McMahon said she feels that she has not had the opportunity to look at the plan, having just received the amended one yesterday, and the Commission has not looked at it either. Councilmember Magazine said that the Commission does a great job, but he wished they would not use terms such as "explore." Mr. Ken Okamoto, Button Capital, said that if they look at Sec. 5.8 of the development agreement, it states that the "developer is allowed to put in commercial." They cannot be compelled to put in commercial, but they are trying to be as responsive as possible. It will be good for the community. They are in business for making money for investors, but they are also members of the community. It is in their best interest to put in something commercially viable. Mayor Dickey asked staff what the development agreement says with regard to technical requirements versus what actions may be made by the Commission or Council. At this time the Acting Town Attorney, Trish Rhutan, reminded the Town Council that they have listed on the agenda the ability to go into executive session for legal advice.    MOVED BY Councilmember David Spelich, SECONDED BY Councilmember Sharron Grzybowski to recess into Executive Sessioin.  Vote: 7 - 0 Passed - Unanimously    The Town Council recessed the Regular Session at 8:15 p.m.   Town Council Regular Meeting of March 1, 2022 8 of 12    The Fountain Hills Town Council Regular Meeting of March 1, 2022, reconvened Open Session at 8:58 p.m. At this time, the following individuals addressed the Council: •Ed Stizza, Fountain Hills, stated that the corner of Avenue of the Fountains and Saguaro is very important, and it certainly needs to be finished off. He said there are a lot of details with this plan that the public is not going to agree with. It would be nice to have a wider art walk for the residents, and retail underneath the corner does not make a lot of sense. He said there are a lot of constraints; it is a big deal to get this right. •Brenda Kalivianakis, Fountain Hills, said that she is an attorney and the developer got into a contract with a different Town Council and Town Attorney. He is here now to execute that contract; they cannot renegotiate the terms of that development agreement. He entered into the contract in good faith with the Town and if they do not play ball and be nice, they will end up in court. Councilmember Grzybowski said that the commercial added between the last submission and yesterday is not retail friendly. To compare it to Georgie's is not a fair assessment. Georgie's is open and friendly. She sees this as a very narrow window that is not retail friendly at all. Mayor Dickey said that Building E is what she has issues with. Councilmember Scharnow noted that he has not chimed in yet. He believes this proposed site plan does not meet the technical requirements and he thinks that further exploration is needed. Mr. Okamoto said that they already have a tenant that is interested in that commercial space and would prefer that type of location. It is not the Town Council's job to determine whether something is commercially viable; that is for the developers to determine. Mayor Dickey said that they were talking about the technical part. Part of what they do consider is what they think is best for the Town. Councilmember McMahon said that her concerns are more to do with the design and accessibility. Councilmember Scharnow said that he did not think that all of the stipulations of the Commission were met.    MOVED BY Councilmember Mike Scharnow, SECONDED BY Councilmember Alan Magazine to deny the site plan as submitted.  Vote: 7 - 0 Passed - Unanimously   Town Council Regular Meeting of March 1, 2022 9 of 12             C.CONSIDERATION AND POSSIBLE ACTION: Adoption of Resolution 2022-06 approving Facility, Street, and Honorary Naming Policy.       Community Services Director Rachael Goodwin gave a brief presentation on this, noting that the Council previously discussed it and it was being brought back for formal adoption. Councilmember Magazine said that he has no problem at all with Dr. Wright; however, he was concerned with naming streets after local elected officials. Councilmember McMahon asked if there were any other streets in town named after elected officials. Staff noted there was Keith McMahan, which was an actual street name, not an honorary street name like this. Mayor Dickey asked if there was any limit on the number of honorary street names they would consider each year. Ms. Goodwin said that they did not include a limit. If they find they are getting a lot of these requests, it could be brought back to consider making an amendment.    MOVED BY Vice Mayor Gerry Friedel, SECONDED BY Councilmember Sharron Grzybowski to adopt Resolution 2022-06.  Vote: 7 - 0 Passed - Unanimously   D.CONSIDERATION AND POSSIBLE ACTION: Approval of Honorary Street Naming Application for Dr. C.T. Wright.       Councilmember Spelich said that he had submitted this application as Dr. C.T. Wright was a dear friend of his. When he first came to the area Dr. Wright welcomed him. He was an amazing individual, and he never had a bad word to say about anyone. He reached across sides of the aisle.    MOVED BY Councilmember David Spelich, SECONDED BY Vice Mayor Gerry Friedel to approve the Honorary Street Naming Application for Dr. C.T. Wright.  Vote: 7 - 0 Passed - Unanimously   E.DISCUSSION WITH POSSIBLE DIRECTION relating to any item included in the League of Arizona Cities and Towns’ weekly Legislative Bulletin(s) or relating to any action proposed or pending before the State Legislature.       Mr. Miller reviewed primary bills that have recently been brought to their attention: Primary Contracting. It is currently 35%, and moving to 45% over the next three years. It would reduce what the Town receives through contracting for construction. Construction sales tax would take a big hit. For the state, it would mean roughly $153 million after reaching the 45%, with an annual impact of about $100 million to cities and towns. Town Council Regular Meeting of March 1, 2022 10 of 12 The Town Council agreed to oppose this bill. Mr. Miller said that HB2276 is the same thing as SB1487, but for school districts. Any legislators can challenge any policy or regulation made by a school superintendent or principal, including universities. HB2624, regarding having to maintain minimum level of effort to support law enforcement. If the Town was able to receive a reduction from MCSO after their audit, the Town could not pay less or they could lose an equivalent amount of state shared revenues. Federal ARPPA funds, if a city/town has a legal property tax increase, it would require them to use these funds to offset that cost. With the CARES Act the federal government challenged it, so with the ARPPA, it was written in that such use could not be done. HB2275 - Mayor Dickey said that this bill would change the current law of only requiring 80% of condo owners to agree to dissolve them and forcing the other 20% to sell, to requiring 100% of the condo owners, and that is why they should support this bill. Council agreed to take an official stand on each of these bills as discussed.   9.COUNCIL DISCUSSION/DIRECTION to the TOWN MANAGER Item(s) listed below are related only to the propriety of (i) placing such item(s) on a future agenda for action, or (ii) directing staff to conduct further research and report back to the Council.    Vice Mayor Friedel said that he was on a call today about a town designating a safe zone where online sales could be exchanged. He suggested that the Town consider designating a safe zone in Fountain Hills. Councilmember Scharnow noted that he was outside the Mesa Police Department, and he noticed a sign for a safe zone.   10.ADJOURNMENT    MOVED BY Councilmember David Spelich, SECONDED BY Councilmember Sharron Grzybowski to adjourn.  Vote: 7 - 0 Passed - Unanimously    The Regular Meeting of the Fountain Hills Town Council held March 1, 2022, adjourned at 9:32 p.m.     TOWN OF FOUNTAIN HILLS ____________________________ Ginny Dickey, Mayor Town Council Regular Meeting of March 1, 2022 11 of 12 ATTEST AND PREPARED BY: ______________________________ Elizabeth A. Klein, Town Clerk CERTIFICATION I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the Regular Meeting held by the Town Council of Fountain Hills in the Town Hall Council Chambers on the 1st day of March, 2022. I further certify that the meeting was duly called and that a quorum was present. DATED this 15th day of March, 2022. _________________________________ Elizabeth A. Klein, Town Clerk Town Council Regular Meeting of March 1, 2022 12 of 12 ITEM 7. B. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Consent                  Submitting Department: Administration Prepared by: David Pock, Finance Director Staff Contact Information: David Pock, Finance Director Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Approval of a budget transfer for the General Fund and Vehicle Replacement Fund. Staff Summary (Background) Throughout the fiscal year, it is sometimes necessary to transfer funds from one budget account to another.  In most cases, the funds to be transferred are within the same department and can be made administratively without the need to request Town Council approval.  The following transfer is needed to move budget between departments and between funds.  $30,604.11 from General Government Administration Contingency (GENAD) to Golden Eagle Park Operations (GEPOP) to purchase a replacement tractor/loader $18,635.13 from General Government Administration Contingency (GENAD) to Vehicle Replacement Administration (VRAD) to use previously collected internal service charges towards the purchase of a replacement tractor/loader. Related Ordinance, Policy or Guiding Principle Town Council approved financial policies and best practices. Risk Analysis If not approved, the budgets for the General Fund and Vehicle Replacement Fund could be exceeded. Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) Staff recommends approval of the budget transfer as requested. SUGGESTED MOTION MOVE to approve the attached budget transfer as requested. Attachments Budget Transfer  Form Review Inbox Reviewed By Date Finance Director (Originator)David Pock 03/03/2022 10:00 AM Town Attorney Aaron D. Arnson 03/03/2022 10:57 AM Town Manager Grady E. Miller 03/03/2022 03:53 PM Form Started By: David Pock Started On: 03/03/2022 09:14 AM Final Approval Date: 03/03/2022  03/03/2022 09:23 |TOWN OF FOUNTAIN HILLS |P 1 DPock |BUDGET AMENDMENTS JOURNAL ENTRY PROOF |bgamdent LN ORG OBJECT PROJ ORG DESCRIPTION ACCOUNT DESCRIPTION PREV BUDGET AMENDED ACCOUNT LINE DESCRIPTION EFF DATE BUDGET CHANGE BUDGET ERR____________________________________________________________________________________________________________________________________ YEAR-PER JOURNAL EFF-DATE REF 1 REF 2 SRC JNL-DESC ENTITY AMEND 2022 09 17 03/15/2022 BUA PARKS TRAC 1 8 1 GENAD 7010 GENERAL GOVERNMENT ADMIN CONTINGENCY 4,916,413.00 -49,239.24 4,867,173.76 100-10-15-110-100-0106-7010- TO VRAD AND GEPOP 03/15/2022 2 VRAD 8010 VEHICLE REPL-ADMIN VEHICLES 56,000.00 18,635.13 74,635.13 810-10-15-901-000-2207-8010- FM GENAD FOR PARK TRACTOR 03/15/2022 3 GEPOP 8010 GEP-OPERATIONS VEHICLES .00 30,604.11 30,604.11 100-50-50-502-510-1515-8010- FM GENAD FOR PARK TRACTOR 03/15/2022 ** JOURNAL TOTAL 0.00 Z ITEM 7. C. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Consent Submitting Department: Administration Prepared by: David Trimble, Deputy Town Manager/Admin. Serv. Dir. Staff Contact Information: David Trimble, Deputy Town Manager/Admin. Serv. Dir. Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Adoption of Resolution 2022-12 Authorizing renewal of the Town of Fountain Hills' membership in the Arizona Metropolitan Trust. Staff Summary (background) In 2016, the Town joined the Arizona Metropolitan Trust (AzMT) for employee health related benefits, and renewed its membership in 2019.  Trust membership operates in three-year cycles, so it is time to renew the Town’s membership for another three-year term.  AzMT consists of other Arizona cities and towns such as Paradise Valley, El Mirage, Apache Junction, and Wickenburg.  There is no membership fee to join AzMT and the Town enjoys the benefit of reduced medical, dental, vision, and life insurance premiums.  In the first year after joining AzMT, the Town saved over $100,000, and similar savings have continued.  For example, the Town had regularly budgeted nearly 17% of wages for these benefits before joining AzMT.  Since joining AzMT, the Town has budgeted significantly less, and is anticipating spending approximately 13.25% of wages in the next fiscal year. That equates to a savings of approximately $162,000 for FY2023.  This requested renewal would maintain the same arrangement for employee benefits for the next three years, at which time the Town would likely choose to renew again if past experience continues positively.  Before joining AzMT, the Town had been under the broker/provider model with various open enrollment periods for different benefit types.  Joining AzMT allowed the Town to eliminate brokerage fees, and streamline the open enrollment, and COBRA (Consolidated Omnibus Budget Reconciliation Act, requiring optional continued coverage after employees separate from Town employment) administration processes.  Additionally, as a Trust member the Town now participates in important decisions such as plan design, premium rate setting, and claims appeals.  For these reasons, we recommend approval of the Town’s renewal for another three-year term in AzMT. Related Ordinance, Policy or Guiding Principle Attract and retain quality staff. Risk Analysis Employee health and related premiums would be considerably higher for the level of benefits Employee health and related premiums would be considerably higher for the level of benefits contracted for if the Town of Fountain Hills was not a member of AzMT. Recommendation(s) by Board(s) or Commission(s) Staff Recommendation(s) Staff recommends approval of Resolution 2022-12. SUGGESTED MOTION MOVE to adopt Resolution 2022-12. Fiscal Impact Fiscal Impact:$0 Budget Reference:N/A Funding Source: If Multiple Funds utilized, list here: Budgeted: if No, attach Budget Adjustment Form:Yes Attachments AzMT Summary  AzMT offer renewal letter  Resolution  Form Review Inbox Reviewed By Date Finance Director David Pock 03/01/2022 07:34 AM Town Attorney Aaron D. Arnson 03/01/2022 08:32 AM Town Manager Grady E. Miller 03/03/2022 03:51 PM Form Started By: David Trimble Started On: 02/26/2022 11:14 AM Final Approval Date: 03/03/2022  As of December 31, 2021 • Originally formed 07/01/12 by Apache Junction, Avondale, El Mirage and Youngtown • Currently 9 members: Apache Junction, Buckeye Valley Fire District, El Mirage, Fountain Hills, Litchfield Park, Paradise Valley, Sun City Fire District, Wickenburg and Youngtown. • Founding Premises o A home for public entities accessing care in the metro Phoenix area o Shift control from insurance companies (sellers) to members (purchasers) o Emphasize health promotion (Wellness) versus paying for illness • Governance o Board of Trustees appointed by member entities o Equal voting and representation • Differentiators from Other Pools o Direct Trustee Governance o Contracts Held in Name of Trust  Transparent o Unbundled  Each piece purchased separately  Increases flexibility in benefit design  Decreases costs  Increased control for plan sponsors o Surplus/Deficit  Allocated monthly from date of membership  Includes monthly adjustments for pro-rated “profits” and losses  Interest income  Includes annual adjustment for pro-rated Incurred But Not Paid (IBNP)  Returned via formula upon departure • Finances o “Run it like a business” recognize the Trust is a public entity, spending tax dollars o Risk Management (Business) Plan o Conservative funding (looking for stability and predictability) o Benefits and rates developed by the Trust’s actuary o Build surplus  Stabilizing factor for unusual claims activity  Rate cushion when structural changes occur  Health Care Reform  Economic downturns • Results o Rate Increases Average 3% Since Inception (9 Years) o “Clean” Audits every year since June 30, 2013 o “Clean” DOI Report as of 06/30/17 (Conducted every 5 years) o No litigation of any kind o Financial Position as of 12/31/21  Cash - $5,472,702  Surplus = $5,211,586 MEMBER ENTITIES CITY OF APACHE JUNCTION BUCKEYE VALLEY FIRE DISTRICT CITY OF EL MIRAGE Crystal Dyches, Chairperson TOWN OF FOUNTAIN HILLS Grady Miller, Vice Chairperson CITY OF LITCHFIELD PARK TOWN OF PARADISE VALLEY SUN CITY FIRE DISTRICT TOWN OF WICKENBURG TOWN OF YOUNGTOWN February 22, 2022 Grady Miller, Town Manager Town of Fountain Hills 16705 E. Avenue of the Fountains Fountain Hills, AZ 85268 Dear Grady: As you know, the Arizona Metropolitan Trust Board of Trustees extended an offer to renew Fountain Hills’ membership in the Trust for another three-year term beginning July 01, 2022. Should you wish to accept this offer, please have your Town Council approve the attached Renewal Resolution and return to me by April 01, 2022. Should the Town decide they wish to leave AzMT at the end of the membership term, please notify me in writing by April 02, 2022. We look forward to our continued partnership! Please let me know if you need anything further or have any questions. Sincerely, GALLAGHER BENEFIT SERVICES Jaime Jaime L. Schulenberg Pool Administrator HEALTHCARE IN YOUR HANDS c/o Gallagher Benefit Services 1115 N Stockton Hill Rd. Suite 101 Kingman, AZ 86401 928.391.2297 Jaime_Schulenberg@ajg.com www.azmt.org RESOLUTION NO. 2022-12 A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF FOUNTAIN HILLS AUTHORIZING THE RENEWAL OF THE TOWN OF FOUNTAIN HILLS’ MEMBERSHIP IN THE ARIZONA METROPOLITAN TRUST RECITALS: WHEREAS, the Town of Fountain Hills (“Fountain Hills”) is currently a Participating Entity in the Arizona Metropolitan Trust (“the Trust”); and WHEREAS, the Town’s current term of membership as a Participating Entity shall expire on June 30, 2022; and WHEREAS, the Trust’s Board of Trustees (“the Trust Board”) has offered a renewal membership to Fountain Hills commencing July 01, 2022; and WHEREAS, the Town of Fountain Hills wishes to renew its participation in the Trust for a three (3) year Membership Period commencing July 01, 2022 and terminating June 30, 2025; and WHEREAS, renewal of the Town’s membership in the Trust will serve the interest of the Town and its employees. ENACTMENTS: NOW, THEREFORE IT IS RESOLVED by the Mayor and Town Council of the Town of Fountain Hills, Arizona that they authorize the renewal of the Town’s membership in the Trust for the period commencing July 1, 2022, and terminating June 30, 2025. PASSED AND ADOPTED by the Mayor and Town Council of the Town of Fountain Hills, Arizona this 15th day of March, 2022. FOR THE TOWN OF FOUNTAIN HILLS: ATTESTED TO: Ginny Dickey, Mayor Elizabeth A. Klein, Town Clerk REVIEWED BY: APPROVED AS TO FORM: Grady E. Miller, Town Manager Aaron D. Arnson, Pierce Coleman PLLC Town Attorney ITEM 7. D. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Consent                  Submitting Department: Community Services Prepared by: Linda Ayres, Recreation Manager Staff Contact Information: Rachael Goodwin, Community Services Director Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Approval of an Extension of Premises Application for the Fountain Hills Elks Lodge which is hosting a beer garden in conjunction with a charity event on April 2, 2022. Staff Summary (Background) The purpose of this item is to obtain the Town Council's approval regarding the special event liquor license application submitted by Sam Coffee representing Fountain Hills Elks Lodge for submission to the Arizona Department of Liquor. This extension of premises permit is being obtained for the purpose of holding a beer garden in conjunction with a charity event. The application was reviewed by staff for compliance with Town ordinances and staff recommends approval of the special event liquor license application as submitted. Related Ordinance, Policy or Guiding Principle A.R.S. §4-203.02; 4-244; 4-261 and R19-1-228, R19-1-235, and R19-1-309 Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) Staff recommends approval SUGGESTED MOTION MOVE to approve the Extension of Premises Event for the Fountain Hills Elks Lodge as requested. Attachments G:\Special Events\Liquor Apps\2022  Form Review Inbox Reviewed By Date Community Services Director Rachael Goodwin 03/08/2022 07:18 AM Finance Director David Pock 03/08/2022 08:35 AM Town Attorney Elizabeth A. Klein 03/08/2022 11:27 AM Town Manager Grady E. Miller 03/08/2022 11:30 AM Form Started By: Linda Ayres Started On: 02/23/2022 02:22 PM Final Approval Date: 03/08/2022  ITEM 7. E. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Consent Submitting Department: Development Services Prepared by: John Wesley, Development Services Director Staff Contact Information: John Wesley, Development Services Director Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Approving a Map of Dedication for a portion of Serenity Estates.  Staff Summary (Background) Serenity Estates was platted in 2008 as an eleven lot, single-family subdivision at the end of Cerro Alto Drive.  The improvement plans for the development were approved and the owner has maintained the bond on the improvements since that time.  The subdivision improvements were never installed. A new owner purchased the land in 2021 with the intention of completing the subdivision.  Staff has been working with this new owner since that time to bring the subdivision up to current standards.  One of the changes needed was to increase the size of the cul-de-sac to accommodate the turning radius of larger vehicles, such as fire trucks and solid waste pick up vehicles.  This change to the plat is being accomplished through a Map of Dedication which provides an easement around the existing cul-de-sac radius. A second modification included in the Map of Dedication is to increase the length of a wall easement provided on Lots 6 and 11.  This wall easement allows for the location of a retaining wall along the street. There are no other changes to the recorded plat. Related Ordinance, Policy or Guiding Principle N/A Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) Staff Recommendation(s) Staff recommends approval of the Map of Dedication for Serenity Estates. SUGGESTED MOTION MOVE to approve the Map of Dedication for a portion of Serenity Estates. Attachments Vicinity Map  Map of Dedication  Form Review Inbox Reviewed By Date Development Services Director (Originator)John Wesley 03/02/2022 12:30 PM Form Started By: John Wesley Started On: 03/02/2022 10:15 AM Final Approval Date: 03/02/2022  BEELINE H W Y SHEA BLVDPALISADES BLVDSAGUARO BLVD SAGUARO BLVDPALISA D E S B L V D PALISAD E S B L V D SA G U A R O B L V DFOUNTAIN HILLS BLVDMcDOWELL MO U N T A I N R D FOUNTAI N HIL L S BL V DSUNRIDGE DREL L A G O B L V D AVENU E O F T H E FOUNT A I N S PANORAMA DRFIREROCK COUNTRYCLUB DRCRESTVIEW DRSIERRA M A D R E GRANDE BLV D G O L D E N E A G L E B L V D E AG L E R I D G E D R E A G L E R I D G E D R VICINITY MAP TOWN OF FOUNTAIN HILLS NORTH SCALE: 1" = 3500'All that i s A r izonaFOUN T A IN HIL L S TOWN OFINC. 1989TOWN HALL DEVELOPMENT SERVICES DEPARTMENT SCOTTSDALE McDOWELL MOUNTAIN PARK FORT McDOWELL YAVAPAI NATIONSALT RIVER PIMA MARICOPA INDIAN COMMUNITY TOWN BOUNDARY SCOTTSDALE Serenity Estates Map of Dedication FNP21-000001 ITEM 7. F. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Consent Submitting Department: Development Services Prepared by: Farhad Tavassoli, Senior Planner Staff Contact Information: Farhad Tavassoli, Senior Planner Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Approval of a six-month extension to the approved Special Use Permit to allow four residential units at an existing building located at 16842, 16843, 16844 and 16845 E. Avenue of the Fountains (generally located north of Avenue of the Fountains, between Saguaro Blvd. and Verde River Dr.) and in the C-2 (Intermediate Commercial) Zoning District and the Entertainment Overlay District. SU 2021-04 Staff Summary (Background) Per Chapter 2 of the Zoning Ordinance, "A building permit for the construction of any improvements allowed by any special use permit issued by the Town Council shall be secured within six (6) months from the date of approval. Any lapsing of the building permit prior to completion of the improvements will cause the Special Use Permit to become null and void. Prior to the termination of this time limit, the applicant may make a written request to the Town Council and the Council may reconsider said use permit to determine if the permit should be reissued for an additional time period or be terminated." The subject Special Use Permit was approved on August 17, 2021. Staff received a letter, dated February 16, 2022, for a six month extension, one day shy of the expiration date. The agenda item is to review a request from the applicant for that extension, from the date of expiration. If approved, the permit will be valid until August 17, 2022. The subject property consists of an existing building located within Plat 208, north of Avenue of the Fountains, and approximately halfway between Saguaro Blvd. and Verde River Drive. It is zoned C-2 (Intermediate Commercial) and is contained within the Planned Shopping Center and Entertainment Overlay Districts. The building's exact year of construction is unclear, but historical aerial photographs confirm it was built sometime between 1977 and 1986. Sofrita's restaurant occupies a portion of the first floor and faces the Avenue. The subject for this application include two units on the first floor behind the restaurant and two units on the second floor. All four units are currently vacant. The applicant intends to convert each unit to residential apartments, complete with kitchen, living room and two bedrooms. Each unit will be brought to compliance with the 2018 International Building Code, which may require modifications to the exterior of the building. The extent of modifications will be determined when the applicant files for a building permit. No additional on-site parking will be required in Plat 208. Section II of the Fountain Hills General Plan 2020 discusses the elements that help create thriving neighborhoods.  One of the items listed is having a variety of housing types.  This section includes policies to encourage a broad range of housing types affordable to all income ranges and a range of housing types and densities consistent with the character area. Section III of the General Plan includes the information on the Character Areas in the Town. More specifically, the subject property is within the Town Center, where a highly integrated mix of uses is encouraged. However, the Plan recommends residential uses above the first floor, while envisioning commercial uses at the street level. This is further echoed by the Downtown Specific Area Plan.  In staff's opinion, the ground-floor units behind Sofrita's restaurant are historically underutilized and offer poor visibility for commercial activity. Thus, a residential conversion could better ensure their long-term use while contributing to the overall vision of a vibrant town center. The zoning ordinance Section 12.03 allows consideration of residential uses in all commercial zoning districts with the approval of a Special Use Permit (SUP).  Furthermore, Section 25.03 allows residential uses on the second floor above a building with a maximum of 8 dwelling units per acre, but a greater density would require a Special Use Permit. Section 2.02 of the zoning ordinance establishes the process and criteria for consideration of a SUP.  Section 2.02 D. 5. of the zoning ordinance states: 5. In order to recommend approval of any use permit, the findings of the Commission must be that the establishment, maintenance, or operation of the use or building applied for will not be detrimental to the public health, safety, peace, comfort, and general welfare of persons residing or working in the neighborhood of such proposed use, nor shall it be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the Town. This area has been zoned and platted for commercial uses prior to incorporation of the Town. It is still the desire of the Town to have this be a successful commercial center. The question is whether allowing four residential apartments on the property would be detrimental to the health, safety and welfare of Plat 208 and the downtown area. Staff believes adding residential uses would add a complement to the range of retail, office, and service-oriented uses in the area.   Related Ordinance, Policy or Guiding Principle Zoning Ordinance Section 2.02 - Special Use Permits Zoning Ordinance Section 12.03 - Uses Subject to Special Use Permits in the C-1, C-C, C-2, and C-3 Zoning District Zoning Ordinance Section 25.04 - Uses Subject to Special Use Permit in the Entertainment Overlay District General Plan 2020, Section II: Thriving Neighborhoods General Plan 2020 Character Areas, Table 1 Character Area Plan Risk Analysis If the request for an extension is approved, the applicant is granted an additional six months from the original date of approval to submit obtain a building permit to make the necessary improvements to the building as presented. If the request for an extension is denied, the applicant will not be able to make the necessary improvements as presented. Additionally, Chapter 2 of the Zoning Ordinance states, "No person shall reapply for the same or substantially the same use permit on the same or substantially the same plot, lot, or parcel of land within a period of one (1) year from the date of denial of said use permit." Recommendation(s) by Board(s) or Commission(s) The Planning and Zoning Commission reviewed and considered this request at their regular meeting on July 12, 2021.  The applicant and his architect both attended the meeting and provided a brief summary of their intentions with the building.  There were no other citizens present who wished to speak on this item. The Commission recommended approval of the Special Use Permit with a 4-2 vote. Chairman Gray and Commissioner Kovacevic voted against the motion. At the August 17, 2021 Town Council meeting, Council voted unanimously (7-0) to approve the Special Use Permit as presented. Staff Recommendation(s) Staff recommends the Town Council APPROVE the request for a six-month extension to the approved Special Use Permit to allow four residential units in an existing building located at 16842, 16843, 16844, 16845 E. Avenue of the Fountains, beginning from the original expiration date of February 17, 2022. SUGGESTED MOTION MOVE to approve a six-month extension to the Special Use Permit to allow four residential units in an existing building located at 16842, 16843, 16844, 16845 E. Avenue of the Fountains, beginning from the original expiration date of February 17, 2022. Attachments Request for Extension  Vicinity Map  Narrative  Site Plan  Form Review Inbox Reviewed By Date Development Services Director John Wesley 03/03/2022 10:53 AM Form Started By: Farhad Tavassoli Started On: 03/03/2022 07:41 AM Final Approval Date: 03/03/2022  CASE: SU2021-04 SITE / ADDRESS: 16842-16843-16844-16845 E. Avenue of the Fountains APN #176-05-075 & 176-05-076 REQUEST: SPECIAL USE PERMIT to allow four residential units at an existing building located at 16842-16843-16844-16845 E. Avenue of the Fountains (generally located north of Avenue of the Fountains, between Saguaro Blvd. and Verde River Dr.) and in the C-2 (Intermediate Commercial) Zoning District and the Entertainment Overlay District. Site Location ITEM 7. G. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Consent Submitting Department: Development Services Prepared by: Farhad Tavassoli, Senior Planner Staff Contact Information: Farhad Tavassoli, Senior Planner Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Extension of a Special Use Permit to allow residential uses on a 0.58 acre property in the Community Commercial (C-C) zoning district at 17134 E. Kingstree Blvd., generally located at the northwest corner of Saguaro Blvd. and Kingstree Blvd.   Staff Summary (Background) Per Chapter 2 of the Zoning Ordinance,    "A building permit for the construction of any improvements allowed by any special use permit issued by the Town Council shall be secured within six (6) months from the date of approval. Any lapsing of the building permit prior to completion of the improvements will cause the Special Use Permit to become null and void. Prior to the termination of this time limit, the applicant may make a written request to the Town Council and the Council may reconsider said use permit to determine if the permit should be reissued for an additional time period or be terminated." The subject Special Use Permit was approved on September 21, 2021. It will expire on March 21, 2022 if the request for an extension is not approved. This agenda item is to review a request from the applicant for that extension. The 25,350-sq. ft. subject property, located at the northwest corner of Saguaro and Kingstree Blvd., is vacant and zoned C-C (Community Commercial). The allowable uses in this zoning district are identical to the C-1 (Neighborhood Commercial and Professional) zoning district, but allows for common parking areas rather than parking on individual lots.The property at this corner is part of Plat 202, which was platted in 1972 for this type of development. Currently, this block of Plat 202 houses a church, martial arts studio, dance studio, offices, and a restaurant. There are also several condominiums east of the alley, behind the commercial parcels. The common parking area contains 174 stalls, including 9 ADA-compliant stalls.  The applicant is proposing a small mixed-use development. The purpose for the special use permit request is to allow the residential component of the development in a commercial zoning district, as required by the zoning ordinance. The project will consist of three, two-story buildings. The largest building will be to the east, facing Saguaro Blvd. This building will feature a variety of office suites on the building will be to the east, facing Saguaro Blvd. This building will feature a variety of office suites on the first floor, including a break room and conference room. The upper floor will consist of four residential units. Buildings A and B to the west will feature as many as eight live/work units. The applicant envisions uses such as cafés, art studios, beauty salons, and professional services on the ground floor, with a residential upper floor for each business. There will be a central courtyard with landscaping and outdoor seating. The applicant has provided color renderings and building elevations to show facade treatment, wall articulation, varied roof lines, and other modern architectural elements. Section II of the Fountain Hills General Plan 2020 discusses the elements that help create thriving neighborhoods.  One of the items listed is having a variety of housing types.  This section includes policies to encourage a broad range of housing types affordable to all income ranges and a range of housing types and densities consistent with the character area. Section III of the General Plan includes the information on the Character Areas in the Town.  This small commercial area at Saguaro and Kingstree Blvd. was included as part of the surrounding Neighborhood character type.  More specifically, this area is considered a Mixed Neighborhood with smaller lots and a mix of non-residential uses.  This existing commercial area is intended to remain a low intensity area with any further development or redevelopment consistent with the surrounding neighborhood.  Allowing the proposed residential use would be consistent with the intent of the Plan for this area. The zoning ordinance Section 12.03 allows consideration of residential uses in all commercial zoning districts with the approval of a Special Use Permit (SUP).  Section 2.02 of the zoning ordinance establishes the process and criteria for consideration of a SUP.  With regards to the possible actions and findings of the Planning and Zoning Commission, Section 2.02 D. 5. of the Zoning Ordinance states:    5. In order to recommend approval of any use permit, the findings of the Commission must be that the establishment, maintenance, or operation of the use or building applied for will not be detrimental to the public health, safety, peace, comfort, and general welfare of persons residing or working in the neighborhood of such proposed use, nor shall it be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the Town. This area has been zoned and platted prior to incorporation of the Town for commercial uses.  It is still the desire of the Town to have this be a successful commercial center.  For the Commission to recommend approval, they needed to determine if the introduction of residential uses to this area of Plat 202 would be detrimental to the desired commercial activity and whether the residential use would be detrimental to the public health, safety, peace, or comfort of the neighborhood. A review of this property shows that over its almost 50-year history it has not fully developed and has been considerably underutilized.  The applicant for this case will provide activity on the ground level by opening his office and will provide constant activity for the development by virtue of also residing on the property.  The introduction of live/work units as well as four, stand-alone residential units at this location would not be detrimental to the neighborhood and could likely benefit the area by having this development more actively used. Furthermore, the existing condominiums to the west of the alley help provide a good transition between the mixed-use nature of this development and the single-family residential properties even further to the west.  Should Town Council approve the Special Use Permit, staff will continue to work with the applicant on Should Town Council approve the Special Use Permit, staff will continue to work with the applicant on details related to the site plan, grading and drainage plan, and required landscaping before filing for a building permit. Planning and Zoning Commission Discussion At the Planning and Zoning Commission meeting on August 9, there was significant concern shared by some Commissioners regarding the adequacy of the common parking area for this development; that there may not be sufficient parking in the established parking lot for all the development which could occur within this development.  The Commissioners were concerned that the proposed development would result in a demand for more parking than is available as the site continues to build out. Since the meeting, staff has further reviewed the existing development and considered the possible impacts of the proposed SUP on the development.  The approved entitlements for this property allow the site to be developed with two-story commercial uses covering each lot.  It was determined at the time of the initial platting and zoning that the parking provided would be sufficient for the amount of development that would occur.  The development which has taken place to date is less than the maximum entitlement on several of the lots.  Staff is not aware that there has ever been a parking issue with the existing development and statements at the Planning and Zoning hearing supports this condition. The specific request is to allow the second story of the proposed buildings to be used as residences.  There is a total of 10,800 square feet of second-story building space being proposed in the conceptual site plan.  If the second floor area were to be used as offices, staff would project a need for 44 parking spaces based on our ordinance requirements (more parking would be required for medical office uses).  If the second floor is built out with the maximum number of requested residential units and all were two-bedroom or larger units, 27 parking spaces would be required.  Therefore, approval of the request SUP should have the impact of reducing the overall parking demand rather than increase it.   Several members of the public also spoke at the P&Z Commission hearing, speaking both for and against the SUP. Opponents were generally concerned about traffic impacts, project scale, and potential view obstructions. (It should be noted that the ground elevation for the Saguaro Ridge Villas is approximately 16' above the property in question.)  The attached letter of opposition was also provided by the Saguaro Ridge Villas Association, which is located west of the site. Supporters spoke about the need for more businesses at the Town, and the potential for this to be a successful development. Related Ordinance, Policy or Guiding Principle Zoning Ordinance Section 2.02 - Special Use Permits Zoning Ordinance Section 12.03 - Uses Subject to Special Use Permits in the C-1, C-C, C-2, and C-3 Zoning Districts General Plan 2020, Section II: Thriving Neighborhoods General Plan 2020 Character Areas, Table 1 Character Area Plan Risk Analysis If the request for an extension is approved, the applicant is granted an additional six months to submit for a building permit.   Additionally, Chapter 2 of the Zoning Ordinance states, "No person shall reapply for the same or substantially the same use permit on the same or substantially the same plot, lot, or parcel of land within a period of one (1) year from the date of denial of said use permit." Recommendation(s) by Board(s) or Commission(s) At their regular meeting on August 9, 2021, the Planning and Zoning Commission recommended denial of the special use permit with a 4-2 vote, citing the aforementioned concerns regarding parking in relation to project scale. At the September 21, 2022 Town Council meeting, Council voted unanimously (7-0) to approve the Special Use Permit as presented. Staff Recommendation(s) Staff recommends approval of the six-month extension request of this Special Use Permit for a maximum 12 dwelling units. SUGGESTED MOTION MOVE to approve the request for a six-month extension to the Special Use Permit to allow a maximum 12 dwelling units at 17134 E. Kingstree Blvd. Attachments Request for Extension  Case Map  Aerial Photo  Narrative  Site Drawings  Letter of Opposition  Form Review Inbox Reviewed By Date Development Services Director John Wesley 03/03/2022 10:55 AM Form Started By: Farhad Tavassoli Started On: 03/03/2022 10:23 AM Final Approval Date: 03/03/2022  FH Urban District K Group SW Contracting, LLC PO Box 18571 Fountain Hills, AZ 85269 (480) 816-6155 office@kauffmanhomes.com March 2, 2022 Farhad Tavassoli Senior Planner Town of Fountain Hills Farhad, We would like to request a 6-month extension for the FH Urban District. We are currently in the process of getting all the development plans prepared, however due to the high volume of development/construction in the Phoenix area, we have had to reach out to quite a few engineers and put on their timeline, in order to get this accomplished. We do hope to have everything done within the next few months to submit for review. Thank you, Dan Kauffman CASE: SU2021-03 SITE / ADDRESS: 17134 E. Kingstree Blvd. APN #176-08-411A REQUEST: SPECIAL USE PERMIT to allow residential uses on a 0.58 acre property in the Community Commercial (C-C) zoning district at 17134 E. Kingstree Blvd., generally located at the northwest corner of Saguaro Blvd. and Kingstree Blvd. Site Location Subject Property Vicinity Map ITEM 8. A. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Regular Agenda Submitting Department: Court Prepared by: Joanna Elliott, Court Administrator Staff Contact Information: Joanna Elliott, Court Administrator Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Resolution 2022-13 approving an Intergovernmental Agreement with the City of Tempe authorizing the Town of Fountain Hills to participate in the East Valley Regional Veterans' Court. Staff Summary (background) The East Valley Regional Veterans' Court, established in July 2016, is a multicourt initiative that includes Chandler, Carefree, Cave Creek, Fountain Hills, Gilbert, Paradise Valley, Scottsdale and Tempe. The court attempts to address the underlying issues veterans have that may, in some cases, lead to committing crimes.  Veterans who commit misdemeanor crimes in any of the participating municipalities can have their case heard at the Tempe-based court and receive an individualized program designed to address the veteran’s underlying issues. If the veteran completes the program successfully, he or she may have their charges reduced or dismissed. The programs vary with each veteran, with some undergoing individual counseling, while others may attend an educational or inpatient treatment program.  Addressing the underlying issues and showing veterans the resources that are available to them makes it less likely that they will commit another crime. Since the Town of Fountain Hills has a significant number of veterans, Presiding Judge Robert Melton and staff believe that this diversion program will be beneficial to our community. In order for the Fountain Hills Municipal Court to participate in this program, the Town Council will need to approve the attached intergovernmental agreement with the City of Tempe.   Related Ordinance, Policy or Guiding Principle Administrative Orders 2016-035 and 2018-071. Risk Analysis N/A  Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) Staff recommends approval. SUGGESTED MOTION MOVE to adopt Resolution 2022-13.  Attachments Resolution 2022-13  Exhibit A  Form Review Inbox Reviewed By Date Town Clerk Elizabeth A. Klein 02/08/2022 10:07 AM Court Administrator (Originator)Joanna Elliott 02/23/2022 10:53 AM Town Attorney Aaron D. Arnson 02/23/2022 12:44 PM Town Manager Grady E. Miller 02/23/2022 03:58 PM Form Started By: Joanna Elliott Started On: 02/08/2022 09:58 AM Final Approval Date: 02/23/2022  RESOLUTION NO. 2022-13 A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF FOUNTAIN HILLS, MARICOPA COUNTY, ARIZONA, APPROVING AN INTERGOVERNMENTAL AGREEMENT WITH THE CITIES OF TEMPE, CHANDLER, SCOTTSDALE, AND THE TOWNS OF CAREFREE, GILBERT, AND PARADISE VALLEY RELATING TO THE EAST VALLEY REGIONAL VETERANS COURT RECITALS: WHEREAS, the Mayor and Town Council of the Town of Fountain Hills (the “Town”) acknowledge the benefit of, and desire to participate in, the East Valley Regional Veterans Court (“EVRVC”); and WHEREAS, the cities of Tempe, Chandler, and Scottsdale, and the towns of Carefree, Gilbert, and Paradise Valley desire to cooperate in the EVRVC. ENACTMENTS: NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE TOWN OF FOUNTAIN HILLS as follows: SECTION 1. That the Town, through its Mayor and Council, hereby approves the Intergovernmental Agreement (the “Agreement”), in substantially the form attached hereto as Exhibit A. SECTION 2. That the Town hereby authorizes the expenditure of funds for EVRVC, as more specifically detailed in the Agreement. SECTION 3. That the Mayor, the Town Manager, the Town Clerk, and the Town Attorney are hereby authorized and directed to cause the execution of the Agreement and to take all steps necessary to carry out the purpose and intent of this Resolution. PASSED AND ADOPTED by the Mayor and Council of the Town of Fountain Hills, Maricopa County, Arizona, this 15th day of March, 2022. FOR THE TOWN OF FOUNTAIN HILLS: ATTESTED TO: __________________________________ ____________________________________ Ginny Dickey, Mayor Elizabeth A. Klein, Town Clerk REVIEWED BY: APPROVED AS TO FORM: __________________________________ ____________________________________ Grady E. Miller, Town Manager Aaron D. Arnson, Town Attorney RESOLUTION NO. 2022-13 PAGE 2 EXHIBIT A INTERGOVERNMENTAL AGREEMENT Contract No. 2022-___-COS INTERGOVERNMENTAL AGREEMENT BETWEEN THE CITY OF TEMPE AND THE EAST VALLEY REGIONAL VETERANS COURT PARTICIPATING MUNICIPALITIES This Intergovernmental Agreement (“Agreement”) is made and entered into this ___ day of __________, 2022, by and between the Cities of Tempe, Chandler, and Scottsdale, each individual Arizona municipal corporations (“Tempe”, “Chandler” and Scottsdale”, respectively) and the Towns of Carefree, Fountain Hills, Gilbert, and Paradise Valley, each individual Arizona municipal corporations (“Carefree”, “Fountain Hills”, “Gilbert” and “Paradise Valley”, respectively). Participating municipalities will be referred to individually in this Agreement as a “Party” and collectively as the “Parties.” RECITALS A. The Parties are authorized and empowered to enter into this Agreement pursuant to Arizona Revised Statutes (“A.R.S.”) §§ 11-951 and 11-952 and their respective city charters or other governing authority. B. Pursuant to A.R.S. § 22-601, the presiding judge of the superior court in each county may establish a veterans court to adjudicate cases filed in a justice court or a municipal court in the county. C. On April 15, 2016, the Presiding Judge of the Maricopa County Superior Court issued Administrative Order No. 2016-035, which established the East Valley Regional Veterans Treatment Court (“EVRVC”) for the municipal courts in the East Valley of Maricopa County, including Tempe Municipal Court, Chandler Municipal Court, Gilbert Municipal Court and Scottsdale Municipal Court and other municipal courts as set forth in Administrative Order No. 2016-035, and provided that each municipal court would establish its own eligibility criteria for referral to the veterans court. On August 12, 2016, the Presiding Judge of the Maricopa County Superior Court issued Administrative Order No. 2016-071 adding the municipal courts of Fountain Hills and Carefree-Cave Creek to the EVRVC. On August 26, 2016, the Presiding Judge of the Maricopa County Superior Court issued Administrative Order No. 2016-076 adding the municipal court of Paradise Valley to the EVRVC. On May 9, 2018, the Presiding Judge of the Maricopa County Superior Court issued Administrative Order No. 2018-071 to establish an EVRVC Governing Council and to appoint a chairperson to assist with the EVRVC. The foregoing administrative orders are collectively referred to as the “Administrative Orders” and are attached hereto as Exhibit “A” and incorporated herein by reference. D. Prior to the issuance of Administrative Order No. 2016-035, Tempe had operated its own veterans court. As of the effective date of this Agreement, pursuant to the direction of the Administrative Order, the presiding judges of the participating municipal courts of the EVRVC have agreed to hold dockets at the Tempe Municipal Court, located at 140 East Fifth Street, Tempe, Arizona 85281. E. Pursuant to A.R.S. § 22-602 and the Administrative Orders, any judicial officer qualified to hear cases in any of the participating municipal courts shall have the authority to adjudicate a case referred to the EVRVC. 19255693v1 Page 1 of 10 Contract No. 2022-___-COS F. Tempe employs judges pro tempore who are qualified to hear cases in Tempe Municipal Court (“Tempe Pro Tem Judges”). G. Tempe has hired an EVRVC coordinator (“Coordinator”) to assist in the operation of the EVRVC at the direction of the Tempe Court Administrator. H. The Parties previously entered into an intergovernmental agreement on June 12, 2018 to establish the terms and conditions by which Parties will work together on the EVRVC, including how Parties will proportionately share costs for the wages of designated court staff and operating costs based on the volume of cases referred to the EVRVC. I. The Parties now desire to enter into a new intergovernmental agreement to continue this cooperative effort under the terms and conditions of this Agreement. NOW, THEREFORE, in consideration of the covenants and promises contained in this agreement and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, the Parties agree as follows: TERMS 1.0 Recitals. The foregoing introduction and recitals are incorporated into this Agreement. 2.0 Purpose. The Parties desire to work cooperatively and share the cost of the EVRVC, using Tempe’s Municipal Court location, the EVRVC Coordinator, and Court Services Specialist to support the EVRVC. 3.0 Additional Agencies. 3.1 The Presiding Judge of the Maricopa County Superior Court may issue future Administrative Orders authorizing additional municipal courts to participate in the EVRVC. Upon issuance of such Administrative Order, a newly authorized municipality may be invited to and become a Party to this Agreement after approval by the majority of the Parties, represented by their presiding judges (or their designees). Such approval shall be documented by a letter of invitation to the presiding judge of the municipality wishing to join along with a copy to all existing members. The addition of a new municipality shall be subject to the provisions of A.R.S. §§11-951 et seq. 3.2 A public agency approved by the presiding judges (or designees) in accordance with Subsection 3.1, shall become a Party to this Agreement as of the date that the Agreement is adopted by its governing body and properly executed by it. 3.3 Each Party shall provide a copy of its fully executed Agreement to every other Party. 4.0 Term. The initial term of this Agreement shall be for a period of five (5) years, commencing on July 1, 2022, and ending on June 30, 2027 (the “Initial Term”), unless terminated as otherwise provided in this Agreement. After the expiration of the Initial Term, this Agreement may be renewed once for a five (5) year renewal term (“Renewal Term”) upon mutual written agreement by the presiding judge of each Party, and filed with the Parties’ City Clerks. The Initial Term and any Renewal Term are collectively referred to herein as the 19255693v1 Page 2 of 10 Contract No. 2022-___-COS “Term.” Upon renewal, the terms and conditions of this Agreement shall remain in full force and effect. 5.0 General Operation of the EVRVC. The Parties acknowledge that: 5.1 Location of Court. The presiding judges of the participating municipal courts of the EVRVC have agreed to refer cases to the EVRVC at the Tempe Municipal Court and/or via a virtual platform. 5.2 Referral. Participating municipal courts may refer cases to the EVRVC for adjudication, in accordance with their respectively established eligibility criteria. 5.3 Scheduling. The Coordinator will coordinate with the Parties the days that each participating municipal court’s referred cases will be adjudicated at the EVRVC. 5.4 Administration. Court administration for each participating court will establish its own case referral process, determine how its cases will be handled in the case management system, and establish how fines, fees, surcharges and any other costs will be allocated. 5.5 Jurisdiction. The originating court will retain jurisdiction of any case referred to the EVRVC. 6.0 Cost Sharing. Parties shall be charged a flat fee per case referred to the EVRVC from their jurisdiction. The flat fee is based on the average cost per case. The average cost per case shall be calculated by dividing total costs by volume using data from the previous fiscal year. The flat fee will include EVRVC operating expenses (exclusive of court costs as defined in Section 8 of this Agreement), as well as the costs associated with the EVRVC Coordinator and a Court Services Specialist. Future grant funding, if any, will be applied to reduce total costs before the average cost per case is calculated. Any changes to the cost sharing formula can only be made prospectively and will require majority approval by Court Administration for each participating court. If the majority approves a formula change, any Party not approving of the formula change will terminate its participation in the Agreement. 6.1 Reimbursement Payments. Tempe shall bill the Parties on a quarterly basis, and each invoice shall reflect costs incurred during the preceding quarter. Payments are due to Tempe EVRVC within thirty (30) days of receipt of invoice. An audit shall be completed at the end of the fiscal year to ensure the accuracy of costs billed. Any difference at year end will either be invoiced or credited to the appropriate Party. 7.0 EVRVC Staff. Tempe has employed the Coordinator and the Court Services Specialist to assist in the operation of the EVRVC. The Parties acknowledge that the staff will be working under the jurisdiction and control of Tempe. 7.1 Duties. The Coordinator shall establish the priority of cases to be heard in the EVRVC, handle the scheduling of cases, coordinate with the clerks of each participating court, and coordinate with the U.S. Department of Veterans Affairs for the provision of treatment services to eligible veterans in the EVRVC. The Court Services Specialist shall perform administrative duties as assigned and necessary for the operation of the EVRVC. 19255693v1 Page 3 of 10 Contract No. 2022-___-COS 7.2 Change in Employment. If the Coordinator will no longer be employed by Tempe and Tempe determines not to reassign the Coordinator’s duties to another Tempe employee or contractor, Tempe shall provide Parties with as much notice as possible so the Parties can determine how such duties will be handled. 8.0 Court Costs. Tempe shall pay for any other costs incurred in operating the EVRVC, including without limitation, utilities in the Tempe Municipal Court, office supplies, and parking, but excluding any costs incurred by any Party in using Tempe’s network connection, which costs are the responsibility of that Party. 9.0 Indemnification. To the fullest extent permitted by law, each Party shall indemnify, defend and hold harmless the other Party and its agents, representatives, officers, directors, officials and employees from and against all allegations, demands, proceedings, suits, actions, claims, damages, losses, expenses, including, but not limited to, attorney fees, court costs, and the cost of appellate proceedings, related to, arising from or out of, or resulting from any acts, errors, mistakes, omissions or negligent, reckless, or intentional actions caused in whole or in part by the other Party relating to work or services in the performance of this Agreement, including, but not limited to, any subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable and any injury or damages claimed by any of the Party’s or its subcontractor’s employees. 9.1 Insurance provisions set forth in this Agreement are separate and independent from the indemnity provisions of this paragraph and shall not be construed in any way to limit the scope and magnitude of the indemnity provisions. The indemnity provisions of this Section shall not be construed in any way to limit the scope and magnitude and applicability of the insurance provisions. 10.0 Insurance Coverage. Each Party will obtain such public liability insurance as is reasonably necessary to protect against claims, losses or judgments that might be occasioned by the negligent acts or omissions of the Party, their employees and agents, during the time that the respective Party is performing acts pursuant to this Agreement. The minimum amount of such coverage shall be in the amount of $1,000,000 for each occurrence, $2,000,000 Products and Completed Operations Annual Aggregate, and a $2,000,000 General Aggregate Limit, and any of the Parties may be self-insured. The Parties acknowledge that Chandler, Scottsdale and Tempe are self-insured as provided in A.R.S. § 11-981 and that this self-insurance fully complies with the requirements under this Section. 10.1 Workers’ Compensation. Tempe staff, including the Coordinator, the Court Services Specialist and other Tempe employees assisting with the EVRVC shall be considered “employees” of Tempe and not of any other jurisdiction (no joint employer). Employees of other participating jurisdictions assisting with the EVRVC shall not be considered “employees” of Tempe (no joint employer). Accordingly, such employees of one Party shall not be entitled to employee benefits normally provided to bona fide employees of another Party. Nothing in this Agreement or its performance, except as provided in A.R.S. § 23-1022(D) and described below, shall be construed to result in any person being the officer, agent, employee, or servant of either Party when such person, absent this Agreement and the performance thereof, would not in law have such status. The primary employer shall be solely liable for any workers’ compensation benefits, that may accrue. Each Party shall post a notice pursuant to the provisions of A.R.S. § 23-1022. 19255693v1 Page 4 of 10 Contract No. 2022-___-COS 11.0 Termination; Cancellation. 11.1 Termination. Any Party shall have the right to terminate its participation in this Agreement, with or without cause, upon giving the other Parties not less than 30 days’ notice, in writing, of intent to terminate. Any such termination shall be signed by the Party’s Contract Administrator. Notice of intent to terminate shall be given as provided in Section 12.0 below. Following termination of participation by one or more Parties, this Agreement shall remain in full effect with respect to the remaining Parties; provided, however, that if Tempe terminates its participation in this Agreement, the Agreement terminates as to all Parties. 11.2 Cancellation for Conflict of Interest. Pursuant to A.R.S. § 38-511, any Party may cancel this Agreement, without penalty or further obligation, if any person significantly involved in initiating, negotiating, securing, drafting or creating the Agreement on behalf of any Party is, at any time while the Agreement is in effect, an employee of any other Party in any capacity, or a consultant to any other Party with respect to the subject matter of the Agreement. The cancellation shall be effective when written notice is received by the other Parties to the Agreement, unless the notice specifies a later time. 11.3 Disposition of Property Upon Termination. The Parties do not anticipate having to dispose of any property upon partial or complete termination of this Agreement. However, to the extent that such disposition is necessary, property shall be returned to its original owner. 12.0 Notices. Any notice required or permitted to be given pursuant to this Agreement, unless otherwise expressly provided herein, shall be given in writing, either personally to the authorized representatives of the other Parties, or by United States Postal Service certified mail, return receipt requested, as shown below or to such other street address(es) as may be designated by the respective Parties in writing from time to time. The notice shall be deemed complete when received by the person receiving it or, when certified mail is used, five days from the date of mailing, whichever occurs first. If a copy of the notice is also given to a Party’s counsel or other recipient, the date on which a notice is deemed to have been received by a Party shall mean and refer to the date on which the Party, and not its counsel or other recipient to which a copy of the notice may be sent, is deemed to have received the notice. If to Carefree: Presiding Judge Carefree-Cave Creek Consolidated Court 37622 N. Cave Creek Rd., Suite B Cave Creek, AZ 85331 Town of Carefree P.O. Box 740 Carefree, AZ 85377 If to Chandler: Presiding Judge Chandler Municipal Court 200 E Chicago St Chandler AZ 85225 City of Chandler Mail Stop 602 19255693v1 Page 5 of 10 Contract No. 2022-___-COS P.O. Box 4008 Chandler, AZ 85244-4008 ATTN: City Attorney If to Fountain Hills: Presiding Judge Fountain Hills Municipal Court 16705 E Avenue of the Fountains Fountain Hills, AZ 85268 Town Attorney Town of Fountain Hills 16705 E Avenue of the Fountains Fountain Hills, AZ 85268 If to Gilbert: Presiding Judge Gilbert Municipal Court 55 East Civic Center Dr, STE 101 Gilbert, AZ 85296 Town Attorney Town of Gilbert 50 East Civic Center Dr Gilbert, AZ 85296 If to Paradise Valley: Presiding Judge Paradise Valley Municipal Court 6517 E. Lincoln Drive Paradise Valley, AZ 85253 Town Attorney Town of Paradise Valley 6401 E. Lincoln Dr. Paradise Valley, AZ 85253 If to Scottsdale: Presiding Judge Scottsdale City Court 3700 N. 75th Street Scottsdale, AZ 85251 City of Scottsdale 3939 North Drinkwater Boulevard Scottsdale, AZ 85251 ATTN: City Attorney If to Tempe:Presiding Judge Tempe Municipal Court 140 East Fifth Street Tempe AZ 85281 City of Tempe P. O. Box 5002 19255693v1 Page 6 of 10 Contract No. 2022-___-COS Tempe, AZ 85280 ATTN: City Attorney 13.0 Miscellaneous. 13.1 Invalid Provisions. In the event any term, condition, covenant, stipulation, agreement or provision herein contained is held to be invalid or unenforceable for any reason, the invalidity of any such term, condition, covenant, stipulation, agreement or provision shall in no way affect any other term, condition, covenant, stipulation, agreement or provision herein contained. 13.2 Paragraph Headings. The paragraph headings contained herein are for convenience in reference and not intended to define or limit the scope of any provision of this Agreement. 13.3 Attorneys’ Fees. In the event either Party brings any action for any relief, declaratory or otherwise, arising out of this Agreement, or on account of any breach or default hereof, the prevailing Party shall be entitled to receive from the other Party reasonable attorneys’ fees and reasonable costs and expenses, determined by the court, sitting without jury, which shall be deemed to have accrued on the commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. 13.4 No Third-Party Beneficiaries. No person or entity shall be a third-party beneficiary to this Agreement. 13.5 Entire Agreement. While separate reimbursement arrangements may exist between individual Parties, this Agreement constitutes the entire agreement between the Parties with respect to the subject matter hereof and supersedes any prior agreement, understanding, negotiation or representation regarding the EVRVC. 13.6 Further Assurances. The Parties agree to do such further acts and things and to execute and deliver such additional Agreements and instruments as any Party may reasonably require to consummate, evidence, confirm or carry out the Agreement contained herein. 13.7 Contract Administrator. Each party shall designate a Contract Administrator. The Contract Administrator shall be responsible for administering the terms of this Agreement, and shall be the primary contact point for the other Parties for all matters arising under this Agreement. The Contract Administrator shall be designated by the effective date of this Agreement and noticed in a separate writing between the parties. If no Contract Administrator is separately designated, the presiding judge for the jurisdiction shall be considered the Contract Administrator. 13.8 Law Governing; Venue. This Agreement shall be governed by the laws of the State of Arizona, and suit pertaining to this Agreement may be brought only in courts in Maricopa County, Arizona. 13.9 Non-assignability. This Agreement is not assignable by any Party. 19255693v1 Page 7 of 10 Contract No. 2022-___-COS 13.10 Severability. If any term or provision of this Agreement shall be found to be illegal or unenforceable, then notwithstanding such illegality or unenforceability, this Agreement shall remain in full force and effect and such term or provision shall be deemed to be deleted. 13.11 Arizona Legal Workers Act. To the extent applicable under A.R.S. § 41-4401, the Parties warrant compliance, on behalf of themselves and any and all subcontractors, with all federal immigration laws and regulation that relate to their employees and compliance with the E-Verify requirements under A.R.S. § 23- 214(A). A Party’s breach of the above-mentioned warranty shall be deemed a material breach of this Agreement and a non-breaching Party may terminate this Agreement. The Parties retain the legal right to inspect the papers of the other Parties to ensure that each Party is complying with the above-mentioned warranty under this Agreement. 13.12 Availability of Funds. This subsection shall control despite any provision of this Agreement or any exhibit or other agreement or document related to this Agreement. The provisions of this Agreement for payment of funds or the incurring of expenses by the Parties shall be effective when funds are appropriated for purposes of this Agreement and are actually available for payment. Each Party shall be the sole judge and authority in determining the availability of funds for its obligations under this Agreement and each Party shall keep the other Parties fully informed as to the availability of funds for this Agreement. The obligation of each Party to make any payment pursuant to this Agreement is a current expense of such Party, payable exclusively from such annual appropriations, and is not a general obligation or indebtedness of such Party. If the governing body of any Party fails to appropriate money sufficient to pay the amounts as set forth in this Agreement during any fiscal year, this Agreement shall terminate at the end of that fiscal year as to such party and such Party shall be relieved of any subsequent obligation under this Agreement. The Agreement shall remain in full effect for the remaining Parties to the Agreement; provided, however, that if Tempe terminates its participation in this Agreement, the Agreement shall terminate as to all Parties. 13.13 Counterparts. This Agreement may be executed in two or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. The signature pages from one or more counterparts may be removed from such counterparts and such signature pages all attached to a single instrument so that the signatures of all Parties may be physically attached to a single document. [Signatures on following pages.] 19255693v1 Page 8 of 10 Contract No. 2022-___-COS IN WITNESS WHEREOF, the Parties have executed this Agreement by signing their signatures, as of the date first written above. CITY OF TEMPE, an Arizona municipal corporation Corey D. Woods, Mayor ATTEST: Carla R. Reece, City Clerk In accordance with the requirements of A.R.S. § 11-952(D), the undersigned attorney acknowledges: 1) that she has reviewed the above Agreement on behalf of Tempe; and, 2) that, as to Tempe only, has determined that this Agreement is in proper form and is within the powers and authority granted under the laws of the State of Arizona. Judith R. Baumann, City Attorney 19255693v1 Page 9 of 10 Contract No. 2022-___-COS CITY OF x, an Arizona municipal corporation ATTEST:_______________________ xxxxxxxxx Mayor _____________________ xxxxxxxxxx City Clerk In accordance with the requirements of A.R.S. § 11-952(D), the undersigned attorney acknowledges: 1) that she has reviewed the above Agreement on behalf of Scottsdale; and, 2) that, as to Scottsdale only, has determined that this Agreement is in proper form and is within the powers and authority granted under the laws of the State of Arizona. _______________________ xxxxxxxxx City Attorney 19255693v1 Page 10 of 10 Exhibit A SUPERIOR COURT OF ARIZONA MARICOPA COUNTY IN THE MATTER OF THE EAST VALLEY REGIONAL VETERANS COURT ) ) ) ) ) ) ADMINISTRATIVE ORDER No. 2016 – 035 The Presiding Judges in several East Valley municipal courts seek to establish a regional Veterans Court pursuant to A.R.S. § 22-601, in order to maximize available resources and ensure the participation of a Veterans Justice Outreach specialist (VJO) from the U.S. Department of Veterans Affairs (V.A.). Each participating court will continue to establish which of its cases will be referred to the Veterans Court docket and each court will continue to maintain its cases in its case management system. However, the Veterans Court docket will be held at a centralized location to share resources and lessen the impact to the VJO from having to travel to multiple court locations throughout the valley. Therefore, IT IS ORDERED establishing a Regional Veterans Treatment Court for the municipal courts in the East Valley of Maricopa County, referred to as the East Valley Municipal Regional Veterans Treatment Court (Regional Veterans Court). The Regional Veterans Court shall include Tempe Municipal Court, Mesa Municipal Court, Gilbert Municipal Court, Scottsdale Municipal Court, and Chandler Municipal Court. Any additional municipal court in Maricopa County can join the Regional Veterans Court upon the written approval of the Presiding Judge of the Superior Court in Maricopa County. Any participating court can withdraw from the Regional Veterans Court by subm itting a written notification of withdrawal to the Presiding Judge of the Superior Court. IT IS FURTHER ORDERED as follows: 1. The Court adopts the referral criteria of each participating municipal court and the Chief Prosecuting Attorneys, after consultation with the respective Public Defenders. Based on the established criteria, each participating court shall determine which cases are appropriate for referral to the Regional Veterans Court. 2. Any judicial officer of a participating municipal court may refer a case to the Regional Veterans Court. The originating court shall maintain jurisdiction over the case. Participation in Regional Veterans Court is voluntary, and as such, the referring judicial officer shall determine if the defendant wishes to have the case transferred to the Regional Veterans Court. The court shall notify the prosecutor of the transfer. 3. The Regional Veterans Court shall hold dockets in a location agreed upon by the Presiding Judges of participating municipal courts. Participating courts will be responsible for the administration of each case referred from their court to the Regional Veterans Court. Any judicial officer qualified to hear cases in any of the participating municipal courts shall have the authority to adjudicate a case referred to the Regional Veterans Court. 4. The Presiding Judges of the participating courts shall coordinate and establish a consistent court calendar for the Regional Veterans Court to be in session. The Presiding Judges shall also establish a consistent schedule for Regional Veterans Court cases to be staffed prior to each court session. 5. Court administration for participating courts shall establish the case transfer process; determine how cases will be handled in the case management system, and how fines, fees, surcharges and any other costs will be allocated. The referring court shall be the custodian of records for its cases at the Regional Veterans Court. 6. Prosecutors for participating municipalities will prosecute their respective municipality’s cases, unless such authority is delegated, in writing, to another agency among the participating municipalities. 7. The Regional Veterans Court Judge will coordinate with the V.A. for the provision of treatment services to eligible veterans in the Regional Veterans Court. The Regional Veterans Court Judge may also utilize local, community-based treatment programs, social services and veterans service organizations that further the purpose of the Regional Veterans Court. 8. In the event a defendant is removed from the Regional Veterans Court for failing to make satisfactory progress in court-ordered treatment, or for any other lawful reason, the Regional Veterans Court Judge shall transfer the case back to the referring court for adjudication. 9. The Presiding Judges, in coordination with the respective City Prosecutors, and after consultation with the respective Public Defenders, shall develop and implement any other standard operating procedures consistent with this order. DATED this 15th day of April, 2016 /s/ Janet E. Barton _________________________________ Janet E. Barton Presiding Judge Original: Clerk of the Superior Court Copies: Municipal Court Presiding Judges in Maricopa County Raymond Billotte, Judicial Branch Administrator Karen Westover, Deputy Court Administrator SUPERIOR COURT OF ARIZONA MARICOPA COUNTY IN THE MATTER OF THE EAST VALLEY REGIONAL VETERANS COURT ) ) ) ) ADMINISTRATIVE ORDER No. 2016-071 Administrative Order No. 2016-035 established the East Valley Municipal Regional Veterans Treatment Court consisting of Tempe Municipal Court, Mesa Municipal Court, Gilbert Municipal Court, Scottsdale Municipal Court, and Chandler Municipal Court. The Administrative Order indicated that any additional municipal court in Maricopa County can join the Regional Veterans Court upon the written approval of the Presiding Judge of the Superior Court in Maricopa County. The Presiding Judge of the Superior Court having received a request from the Fountain Hills Municipal Court and the Carefree-Cave Creek Consolidated Court to join the Regional Veterans Court; and there being no objections from the other participating municipal courts in the Regional Veterans Court; IT IS THEREFORE ORDERED adding the Fountain Hills Municipal Court and the Carefree-Cave Creek Consolidated Court to the East Valley Municipal Regional Veterans Treatment Court. DATED this 12th day of August, 2016 /s/ Janet E. Barton _________________________________ Janet E. Barton Presiding Judge Original: Clerk of the Superior Court Copies: Municipal Court Presiding Judges in Maricopa County Raymond Billotte, Judicial Branch Administrator Karen Westover, Deputy Court Administrator SUPERIOR COURT OF ARIZONA MARICOPA COUNTY IN THE MATTER OF THE EAST VALLEY REGIONAL VETERANS COURT ) ) ) ) ADMINISTRATIVE ORDER No. 2016-076 Administrative Order No. 2016-035 established the East Valley Municipal Regional Veterans Treatment Court consisting of Tempe Municipal Court, Mesa Municipal Court, Gilbert Municipal Court, Scottsdale Municipal Court, and Chandler Municipal Court. The Administrative Order indicated that any additional municipal court in Maricopa County can join the Regional Veterans Court upon the written approval of the Presiding Judge of the Superior Court in Maricopa County. The Presiding Judge of the Superior Court having received a request from the Paradise Valley Municipal Court to join the Regional Veterans Court; and there being no objections from the other participating municipal courts in the Regional Veterans Court; IT IS THEREFORE ORDERED adding the Paradise Valley Municipal Court to the East Valley Municipal Regional Veterans Treatment Court. DATED this 26th day of August, 2016 /s/ Janet E. Barton _________________________________ Janet E. Barton Presiding Judge Original: Clerk of the Superior Court Copies: Municipal Court Presiding Judges in Maricopa County Raymond Billotte, Judicial Branch Administrator Karen Westover, Deputy Court Administrator ITEM 8. B. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Regular Agenda                  Submitting Department: Development Services Prepared by: John Wesley, Development Services Director Staff Contact Information: John Wesley, Development Services Director Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Reconsideration of denial of the Park Place Site Plan, Phase III. Staff Summary (Background) At the March 1, 2022, following presentations and discussions, the Town Council voted to deny the site plan which had been submitted for Phases II and III of the Park Place site plan.  The applicant has asked for reconsideration of the Phase III portion of the site plan. The request to review and possibly take different action on the site plan for Phase III has been placed on the Town Council agenda.  Should the Council vote to allow reconsideration, the Council can then move to that item, view a presentation, hold a discussion, and then take action on the request.  That action can be to approve, approve with conditions, continue, or deny the request.  Should the Council not agree to a reconsideration, the site plan will not be discussed. Related Ordinance, Policy or Guiding Principle N/A Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) The Town Council did not spend as much time at its meeting on March 1, 2022, discussing this part of the site plan as was done on the Phase II portion of the site plan.  Allowing for further review and discussion of the Building B site plan is appropriate.  SUGGESTED MOTION MOVE to reconsider the site plan for Park Place Phase III. Form Review Inbox Reviewed By Date Development Services Director (Originator)John Wesley 03/03/2022 02:24 PM Finance Director David Pock 03/07/2022 08:18 AM Town Attorney Elizabeth A. Klein 03/08/2022 11:29 AM Town Manager Grady E. Miller 03/08/2022 11:38 AM Form Started By: John Wesley Started On: 03/03/2022 02:14 PM Final Approval Date: 03/08/2022  ITEM 8. C. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Regular Agenda Submitting Department: Development Services Prepared by: John Wesley, Development Services Director Staff Contact Information: John Wesley, Development Services Director Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: regarding the proposed site plan for Phase III, Building B, of Park Place located on the west side of the 13000 block of North Verde River Dr.  Staff Summary (Background) At the March 1, 2022, Town Council meeting the Council reviewed the proposed site plan for Phases II and III of Park Place.  Based on the information provided and available at the time, the Council voted to deny that site plan.  Following the meeting the applicant noted that the Council seemed to have more concerns regarding the buildings in Phase II and did not voice as many concerns regarding the building in Phase III.  Therefore, the applicant is now requesting the Council give consideration just to Phase III. Review and consideration of the site plan is based on the Development Agreement, the General Plan, the Downtown Specific Plan, and the TCCD zoning district requirements.  Key elements from these documents as they apply to this portion of the development are:  Development Agreement:  Maximum 3-stories of residential and 54' of height All residential building allowed Provide the Art Walk Provide parking for one of the "New Town Parking Lots" to provide a total of at least 130 parking spaces General Plan:  The 2010 Plan designated this area as part of the Town Center Mixed Use area.  Development in this area could accommodate a mix of retail, office, high-density residential, and other related uses.  A mix of uses should be "carefully designed to be mutually supportive" and the project as a whole should "reinforce the viability and vision of the Town Center."  The primary vision for the Town Center was contained in the Downtown Area Specific Plan. Downtown Area Specific Plan: The area to the south of the Avenue along Verde River is designated in the Plan as "The South End District."  This area is "envisioned as a mixed-use downtown neighborhood with a predominance of residential living opportunities."  The Plan further states the residential development in this area "is intended to incorporate an active street front with parking and garages strategically located to the rear of lots with access from alleys.  The range of residential products may include single-family detached homes, townhomes, brownstones, row homes, condominiums and apartments. The fabric of the neighborhood should be  complimented with small streets, comfortable sidewalks, generous street trees for shade, on-street parking, and pocket parks that provide strategic open space for adjacent development." Town Center Commercial District:  Allows residential only buildings when setback at least 50' from the street.  Required building setbacks are 0' and can have 100% lot coverage.   Phase III Site Plan: The site plan for Phase III contains one building.  The building has three floors of apartments; the apartments on the third floor units include an upper loft level making them two-story in height. The proposed building contains 102 apartments, this is the same number shown on the Land Use Master Plan.  The building is placed over 60' back from the Verde River right-of-way.  There is no significant "front" or main entry to the building; access is through five locations, three from the south and two from the north. The placement and design of this building is not consistent with the Downtown Area Specific Plan in that the building is isolated in a parking lot and does not engage the street or complement the setting for the Art Walk.  This site plan includes an Art Walk that will connect Paul Nordin Parkway to the Community Center Campus.    These units will provide much needed housing for the downtown area. Site plan components: Parking. The zoning ordinance would require 218 parking spaces for this number of units.  The allowed 20% reduction places a requirement of 174 spaces; 141 "on-site" spaces are provided.  In addition, there are 50 spaces in the adjacent parking area next to the Art Walk to meet the requirements of the DA for the New Town Parking Lots. The DA requires 130 spaces in the New Town Parking Lots.  Due to various requirements outside the control of the developer, the New Town Parking lot west of Building C ended up with just 53 spaces, leaving a requirement for 77 spaces; only 50 are provided leaving the site 27 spaces short of what is required by the DA. There is one covered space per unit "on-site" plus an additional 39 uncovered spaces.  There is a good possibility residents and/or visitors to this property will need to utilize the spaces in the Town parking lot along the Art Walk. Lighting. A light plan was submitted on March 8.  The photometric plan shows the proposed light level will meet ordinance standards in the parking lot.  Staff has not had time to review the rest of the information provided in time to provide this report.  More information will be provided at the Council meeting. Elevations.  The building exterior is primarily stucco with a white and three shades of gray.  Some areas of accent cultured stone veneer are also provided.  Accent color for balconies, railing and awnings is a shade of red and a shade of orange.  Elevations consistent with the revised floor plans have been provided. Landscaping. The landscape plan has been provided and is attached.  Staff has not been able to review it in detail, but it appears to provide a good pallette of plant material appropriate for this location.   Art Walk.  A requirement of this development is the provision of an "Art Walk" on the Town owned property from the corner of Verde River and Paul Nordin Parkway to the Community Center.  A conceptual plan is shown that has a center seating area with some shade and the walkway through the area.  A more detailed plan will be required as part of the permitting process. Miscellaneous Relocation of electric boxes.  There are two areas of the site, one toward the northwest corner of the property and one just south of the southeast corner of the building, that contain existing electrical boxes.  These will have to be relocated.  The developer has yet to identify where these will go.  This will have to be done with the construction documents.  They will not be allowed in the Verde River Dr. right-of-way or the Art Walk, and must be located and screened to not interfere with walkways or landscaping. Fountain Hills Sanitary District Monitoring well.  There is an existing monitoring well in the right-of-way along the curve at the street intersection next to where the access is proposed to the Town parking lot.  Continuous power will be needed to this well and final plans will need to ensure any underground storm water storage will not impact the monitoring wells. Paul Nordin Parkway right-of-way.  The right-of-way for the extension of Paul Nordin Parkway still exists through this site. The south half of the parking spaces just south of the building and the nest two rows of parking are in this right-of-way.  Because this area is proposed for private use, including covered parking, the right-of-way should be abandoned.  When this happens the north have would become part of the lot to the north and the south have to the Town property to the south.  The developer has applied for this abandonment.  It will need to be completed prior to issuance of a building permit. Parking Easement and Maintenance.  The proposed site plan includes development on public property.  The DA requires an easement and maintenance agreement for this private use of the public property.  The documents will need to be prepared and filed prior to issuance of a building permit on the property. Staff has not had time to fully review the most recent plan submittal.  This will take place following Council action on the site plan with a complete list of any modifications that may be needed. Related Ordinance, Policy or Guiding Principle Zoning Ordinance Section 2.04 Site Plans Zoning Ordinance Chapter 18, Town Center Commercial Zoning District 2010 General Plan 2020 General Plan Town Center Specific Plan Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) The Planning and Zoning Commission reviewed and discussed this site plan at their February 14, 2022, regular meeting.  Staff and the applicant made presentations and provided the Commission with information regarding the proposed development.  Two citizens spoke regarding the proposed development. As it relates to Phase III, the P & Z Commission voted to recommend approval subject to returning the size of the Art Walk to what was included in the Master Land Use Plan approved as part of the 2016 application and finding another alternative through shared parking arrangements for the needed parking.  The revised site plan is consistent with the motion to return the Art Walk to is previous size, but staff has not seen any solutions to the additional New Town Parking Lot spaces needed to provide the 130 total spaces required in the DA. Staff Recommendation(s) Staff does not have concerns with the Phase III development and supports approval.  Approval would need to be conditioned on allowing staff time to complete a final review and receiving a set of final site plan drawings, as required by Section 2.04 of the Zoning Ordinance which address all comments and conditions of approval prior to beginning review of the construction documents. SUGGESTED MOTION MOVE to approve subject to providing staff with a complete site plan package as required by the Zoning Ordinance. OR Move to deny the site plan. Attachments Site Plan, Floor Plans, Elevations  Colored Landscape Plan  Colored Elevations  Rendering  Civil Plans  Form Review Inbox Reviewed By Date Development Services Director (Originator)John Wesley 03/03/2022 02:24 PM Town Manager Grady E. Miller 03/08/2022 11:41 AM Development Services Director (Originator)John Wesley 03/08/2022 06:08 PM Town Attorney Elizabeth A. Klein 03/09/2022 05:40 PM Town Manager Grady E. Miller 03/09/2022 05:44 PM Form Started By: John Wesley Started On: 03/02/2022 04:33 PM Final Approval Date: 03/09/2022  A H B H D E A ABH ? A CA E A C HBHHABH E A D E C C CH C H E CD A E B CB A E D A.STUCCO FINISH DUNN EDWARDS IGLOO DEW379 B.STUCCO FINISH DUNN EDWARDS SILVER LINED DE6353 C.STUCCO FINISH DUNN EDWARDS WALRUS DE6368 D.STUCCO FINISH DUNN EDWARDS BLACK BEAN DE6385 E.CULTURED STONE VENEER 8X8 CULTURED STONE CAST-FIT CARBON G.METAL (S) AWNINGS: SHERWIN WILLIAMS SW42152 H.STUCCO FINISH & BALCONY RAILING DUNN EDWARDS CAMPFIRE DE5146 LANDMARK 8777 E. VIA DE VENTURA, STE. 250, SCOTTSDALE, AZ 85258 d e s i g n DATE:REVISIONS: DATE:SHEET:JOB NO. 12/21/21 TOWN OF FOUNTAIN HILLS REVIEW COMMENTS JUNE 16 202121-201 F O U N T A I N H I L L S , A R I Z O N A PRINTED2 1 3 4 5 Koba I - Apartments CE1 SCALE:3/32" = 1'-0"1 SOUTH SCALE: 3/32" = 1'-0" 2 EAST (WEST MIRRORED) COLOR LEGEND E B ? B H C ABHHBAH D E B A B E B B A.STUCCO FINISH DUNN EDWARDS IGLOO DEW379 B.STUCCO FINISH DUNN EDWARDS SILVER LINED DE6353 C.STUCCO FINISH DUNN EDWARDS WALRUS DE6368 D.STUCCO FINISH DUNN EDWARDS BLACK BEAN DE6385 E.CULTURED STONE VENEER 8X8 CULTURED STONE CAST-FIT CARBON G.METAL (S) AWNINGS: SHERWIN WILLIAMS SW42152 H.STUCCO FINISH & BALCONY RAILING DUNN EDWARDS CAMPFIRE DE5146 LANDMARK 8777 E. VIA DE VENTURA, STE. 250, SCOTTSDALE, AZ 85258 d e s i g n DATE:REVISIONS: DATE:SHEET:JOB NO. 12/21/21 TOWN OF FOUNTAIN HILLS REVIEW COMMENTS JUNE 16 202121-201 F O U N T A I N H I L L S , A R I Z O N A PRINTED2 1 3 4 5 Koba I - Apartments CE2 SCALE:3/32" = 1'-0"2 NORTH COLOR LEGEND CONCEPTUAL GRADING & DRAINAGE PLAN KOBA 2 NO. 208 BLOCK 2 REPLAT LOT 1 REPLAT FOUNTAIN HILLS, AZ CONCEPTUAL GRADING PLANKOBA 2A PORTION OF THE SOUTHEAST QUARTER OF SECTION 15, TOWNSHIP 3NORTH, RANGE 6 EAST OF THE G.&S.R.B.&M., MARICOPA COUNTY, ARIZONATHISSITEVICINITY MAPNSITE DATACIVIL ENGINEEROWNERLEGAL DESCRIPTIONSHEET INDEXBENCHMARKRETENTION NOTEREQUIRED RETENTION∴JARRETT ENGINEERING STANDARD NOTESUTILITY PROVIDERSFOUNTAIN HILLS GRADING & DRAINAGE NOTESWMLEGENDFEMA CERTIFICATION 823102162718LOADING 889VANVANVAN21VAN VANLOADING 8868881118448101010578VERDE RIVER DR. CONCEPTUAL GRADING & DRAINAGE PLAN KOBA 2 NO. 208 BLOCK 2 REPLAT LOT 1 REPLAT FOUNTIAN HILLS, AZ 0SCALE: 1" = 20'20'10'20' ITEM 8. D. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Regular Agenda                  Submitting Department: Public Works Prepared by: David Janover, Town Engineer Staff Contact Information: Justin Weldy, Public Works Director Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Authorization to Purchase and Install Illuminated Speed Limit Signs. Staff Summary (Background) On June 6, 2020, Town Council approved the designation of two Traffic Safety Corridors within the Town: (1) a 2.3-mile corridor on Palisades Boulevard between El Lago Boulevard and Saguaro Boulevard, and (2) a 1-8 mile corridor along Saguaro Boulevard between Desert Vista and Grande Boulevard.  These Traffic Safety Corridors are special segments of roadway that were identified by both engineering and data analysis to be either high pedestrian/vehicle or vehicle/vehicle conflict zones, with primary issues stemming from driver behavior in the form of speeding, aggressive driving, impairment and distracted driving.  Signage was installed at the entry points of each corridor, advising drivers that they were entering a Traffic Safety Corridor.  The Town is interested in purchasing and installing several Illuminated Speed Limit Signs, also known as driver feedback signs.  These are signs which display the speed limit, as well as the speed of the approaching driver, and are considered to be traffic-calming devices, as they are designed to slow speeders down by alerting them of their speed. These signs have been proven effective around the country, and tests have shown that:  Speeders will slow down up to 80% of the time when alerted by Illuminated Speed Limit Signs Typical speed reductions are 10-20% Overall, compliance with the posted speed limit will go up by 30-60% Illuminated Speed Limit signs are particularly effective at getting “excessive speeders”—speeders driving 20 mph or more over the posted speed limit—to slow down The signs are solar-powered and do not need to be connected to electrical power.  The attached exhibit shows the Traffic Corridors and the proposed locations of the Illuminated Speed Limit Signs.  The plan shows five (5) signs to be located throughout the Traffic Safety Corridors, and one (1) additional sign on Golden Eagle Drive, east of Sunridge Drive.  The sign location plan was presented to the Pedestrian and Traffic Safety Committee on November 9, 2021, and the Committee was in agreement with the plan.   Town staff requested three (3) quotations from suppliers to provide Illuminated Speed Limit Signs.  Staff asked each vendor to provide a price for ten (10) Illuminated Speed Limit Signs, which would provide several additional signs to be installed at a future date, where deemed appropriate, following approval from the Pedestrian and Traffic Safety Committee.  The quotations from the vendors are attached, and summarized as follows:  Interwest Safety Supply - $30,052.40 Centerline Supply - $32,959.90 Zumar - $34,260.00 Staff recommends proceeding with Centerline Supply, as their system is the only one that includes StreetSmart Data Collection Software, a cloud-based service giving staff the ability to review (for each sign) 35 different charts, graphs and tables for weekly, daily, hourly and 1/2 hour data on vehicle volumes, number of speeders, average speeds, peak speeds, and 50th and 85th percentile speeds.  Staff plans to review the data on a regular basis, which will clearly indicate when and where speeding patterns occur, and will aid Law Enforcement with focused monitoring activities. Although the total purchase price for the signs is below the $50,000 threshold, staff is seeking Council approval for the purchase and installation of the Illuminated Speed Limit Signs as shown on the attached exhibit.  If approved, the signs would either be installed by the Town or a JOC contractor.  Related Ordinance, Policy or Guiding Principle The purchase and installation of the Illuminated Speed limit Signs will improve overall roadway safety by slowing down traffic at key locations throughout the Town, and will provide Staff with data regarding times and locations where speeding occurs that will assist Law Enforcement in focusing their monitoring activities. Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) Staff recommends Council authorization to purchase ten (10) Illuminated Speed Limit Signs in the amount of $30,410.00 from Centerline Supply.  SUGGESTED MOTION MOVE to authorize the purchase of ten (10) Illuminated Speed Limit Signs in the amount of $30,410.00 from Centerline Supply, and for staff to install the signs shown on the attached exhibit. Fiscal Impact Fiscal Impact:$30,410 Budget Reference: Funding Source: If Multiple Funds utilized, list here: Budgeted: if No, attach Budget Adjustment Form: Attachments Sign Locations  Sign Quote - Interwest Supply  Sign Quote - Centerline Supply  Sign Quote - Zumar  Form Review Inbox Reviewed By Date Public Works Director Justin Weldy 02/23/2022 05:32 PM Finance Director David Pock 02/24/2022 06:49 AM Town Attorney Aaron D. Arnson 02/24/2022 08:08 AM Town Manager Grady E. Miller 03/03/2022 03:48 PM Form Started By: David Janover Started On: 02/08/2022 12:57 PM Final Approval Date: 03/03/2022  LINEBEEHWY SHEA BLVDHILLSFOUNTAIN SAGUARO SAGUAROBLVD BLVDG O L D E N EAGLEBLVDEL L A G O BLVD PALISAD E S BLVDBLVD GRANDEBLVD DESERTVISTASUNRIDGEDRSAGUAROBLVDBONDDRWESTBYEL LAGO BLVD OASISDRPANORAMADRTown of Fountain Hills All that is A r izonaFOUN T A IN HIL L S TOWN OFINC. 1989TRAFFIC SAFETY CORRIDORS SPEED FEEDBACK SIGN & SPEED LIMIT SIGN LOCATIONS 2.3-mile safety corridor from El Lago Blvd to Saguaro Blvd PALISADES BLVD 1.8-mile safety corridor from Desert Vista to Grande Blvd SAGUARO BLVD INSTALL SPEED FEEDBACK SIGN & SPEED LIMIT SIGN EXISTING SAFETY CORRIDOR SIGNS SAFETY CORRIDOR STRICT ENFORCEMENT SPEEDING AND OTHER VIOLATIONS Quotation 18499 Page 1 of 2 Utah Branch 744 E. Lakeview Pkwy Provo, UT 84606 801-375-6321 Colorado Branch 195 S. Navajo Denver, CO 80223 303-733-8447 New Mexico Branch 5821 Coronado NE Albuquerque, NM 87109 505-797-2300 Arizona Branch 5302 W. Buckeye Rd. Ste 400 Phoenix, AZ 85043 602-253-0683 Nevada Branch 4475 Delancey Dr. Las Vegas, NV 89103 702-641-0447 QUOTATION TO: FOUNTAIN HILLS QUOTE DATE: 8/6/2021 BID DATE: 8/13/2021 SALES REP: Rick Belanger rbelanger@iwsafety.com FOB: DESTINATION DELIVERY: DELIVER TERMS: NET 30 PROJECT NAME: QUOTE PROJECT #: QUOTE CLASS: ARIZONA BID #ITEM #QTY SIZE DESCRIPTION EACH EXT REQ-PN 10 EV12FMEYL - SOLLA Evolution 12 Solar - Full Matrix - Inc. Solar Panel and Battery. TO INCLUDE: Evolution 11 & 12 - Universal Mount Kit - Full Set $3,005.240 $30,052.40 NOTES: Sub Total $30,052.40 Tax $0.00 Quotation Total 30,052.40 TERMS: PRICES QUOTED ARE FOR FURNISHED MATERIALS ONLY. SALES TAX NOT INCLUDED UNLESS SPECIFIED ABOVE. PRICES ARE VALID FOR 30 DAYS. ANY CHANGE IN QUANTITIES ORDERED MAY RESULT IN A CHANGE IN PRICE. PRICING DOES NOT INCLUDE MOUNTING HARDWARE UNLESS NOTED.ALL SIGNS ARE WARANTED IN ACCORDANCE WITH SHEETING MANUFACTURER PRODUCT BULLETINS.NEVER STORE SIGNS OUTSIDE OR EXPOSE THEM TO MOISTURE BEFORE INSTALLATION. Quotation 18499 Page 2 of 2 ASK US ABOUT TRAFFIC SAFETY RENTALS ARROW BOARDS, TRAFFIC SIGNALS, TRUCK MOUNTED ATTENUATORS, & VARIABLE MESSAGE SIGNS Quote Page 1 Centerline Supply, Inc. 1301 East Hadley Street Phoenix, AZ 85034 United States P: (602) 258-3142 Quote Number:QTE0015092 Quote Date:02/16/22 Prepared By:DEKE SHIP TO: FOUNTAIN HILLS, TOWN OF 16705 E. AVENUE OF THE FOUNTAINS FOUNTAIN HILLS AZ 85268 BILL TO: JUSTIN WELDY FOUNTAIN HILLS, TOWN OF 16705 E. AVENUE OF THE FOUNTAINS FOUNTAIN HILLS AZ 85268 Notes: Customer P.O.Ship VIA Terms Shipping Terms BESTWAY NET30 Prepaid & Add Item Number Ordered Unit Price Extended Price 30404-102 10 EA $3,295.00 $32,950.00 30K [P] RADARSIGN-13" LED TC600S (SOLAR POWERED) W/ACCESSORIES 90900-QUOTE 10 EA $0.00 $0.00 UNIVERSAL PIVOT POLE MOUNT BRACKET SET, TC 600 INCLUDED 90900-QUOTE 10 EA $0.00 $0.00 STANDARD FACEPLATE, 28" X 33", 4 " LETTERING, VARIOUS COLORS INCLUDED 90900-QUOTE 10 EA $20.00 $200.00 OPTIONAL HEAVY DUTY LOCK FOR THE TC-600 90900-QUOTE 10 EA $90.00 $900.00 OPTIONAL SIMULATED CAMERA FLASH AND WHITE STROBE 90900-QUOTE 10 EA $0.00 $0.00 OPTIONAL INTERNAL CELL MODEM (INCLUDE WITH RS-MODEM1) N/C 30404-207 10 EA $295.00 $2,950.00 30K [P] RADARSIGN-EASY COMM PACKAGE 1 YR CONNECTIVITY SERVICE 90900-QUOTE 10 EA $0.00 $0.00 50 WATT SOLAR PANEL, INCLUDES BRACKET INCLUDED 30404-200 10 EA $175.00 $1,750.00 30K [P] RADARSIGN-STREETSMART COMPUTER SOFTWARE 90900-QUOTE 10 EA $0.00 $0.00 TWO YEAR WARRANTY, INCLUDES PARTS AND LABOR AND BACK-UP BATTERIES INCLUDED Quote Page 2 Centerline Supply, Inc. 1301 East Hadley Street Phoenix, AZ 85034 United States P: (602) 258-3142 Quote Number:QTE0015092 Quote Date:02/16/22 Prepared By:DEKE SHIP TO: FOUNTAIN HILLS, TOWN OF 16705 E. AVENUE OF THE FOUNTAINS FOUNTAIN HILLS AZ 85268 BILL TO: JUSTIN WELDY FOUNTAIN HILLS, TOWN OF 16705 E. AVENUE OF THE FOUNTAINS FOUNTAIN HILLS AZ 85268 Notes: Customer P.O.Ship VIA Terms Shipping Terms BESTWAY NET30 Prepaid & Add Item Number Ordered Unit Price Extended Price Quotations are valid for 30 days from the date of quotation. Signature: _________________________ Printed Name: ________________________ Net Order:$38,750.00 Discount %0% Less Discount:$9,100.00 Freight:$760.00 Sales Tax:$2,549.90 Order Total:$32,959.90 WE NOW OFFER CUSTOM VINYL DECALS, FLEET GRAPHICS, WINDOW PRINT FILMS, AND MORE! 1.5% FINANCE CHARGE FOR INVOICES OVER 30 DAYS. Terms & Conditions Apply. CENTERLINE SUPPLY, INC. - PHONE (602) 258-3142 - SALES@CLSUSA.COM ISSUE PO TO ESTIMATE DATE ESTIMATED: 8/5/2021 ESTIMATE NUMBER: 41512ZUMAR 12015 Steele Street South Tacoma, WA 98448 BILL TO SHIP TO TOWN OF FOUNTAIN HILLS ** accountspayable@fh.az.gov **CLOSED FRIDAYS** TOWN OF FOUNTAIN HILLS 16705 E. AVE OF FOUNTAIN 17137 E FALCON DRIVE ATTN: ACCTS PAYABLES FOUNTAIN HILLS, AZ 85268 US FOUNTAIN HILLS, AZ 85268 US ATTENTION: JEFFREY PIERCE CUST. NO.TERMS Net 30 ACCOUNT MANAGER 001875 Laura Trujillo FOB ESTIMATED SHIP DATE FOB Destination UNIT PRICE QUANTITY ESTIMATED TOTAL PRICEUOMPART NUMBERITEM DESCRIPTION 001 USD 23,292.50EA 10300-226 2,329.25 iQ1200 FULL MATRIX DRIVER FEEDBACK SIGN WHITE M75-12DFB-0001 002 USD 10,967.50EA 10300-267 1,096.75 60W SOLAR KIT INCL 60W SOLAR PANEL 35ah BATT,BATT BOX,WIRING/CONDUIT M75-SOLAR-000S TOTAL FOR ESTIMATE : 34,260.00 USD This is a quotation on the goods named above and is subject to the conditions noted below: Quote is valid today through date of expiration shown above. Prices are for goods shown on the plan and/or takeoff sheet provided at the time of quote request. Pricing is for furnish only and does not include installation or hardware unless otherwise pecified. Production days begin upon receipt of approved layouts (if applicable). Customer is responsible for all applicable sales taxes and duty which are calculated at the time of invoicing. Quotation valid for 30 days unless otherwise specified. ITEM 8. E. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Regular Agenda                  Submitting Department: Public Works Prepared by: Justin Weldy, Public Works Director Staff Contact Information: Justin Weldy, Public Works Director Request to Town Council Regular Meeting (Agenda Language):  CONSIDERATION AND POSSIBLE ACTION: Approving Professional Services Agreement 2022-074 with Cactus Asphalt. Staff Summary (Background) By utilizing State, County and City Government cooperative purchasing agreement contracts, the Town has been able to take advantage of competitive pricing received by other municipalities.  Recently, the Pinal County Public Works Department solicited bids for Street Maintenance & Repair Services (RFQ - 177592). The Pinal County Board of Supervisors selected and awarded the contract to Cactus Asphalt. The company has agreed to extend Pinal County contract pricing to the Town of Fountain Hills. In order to effectively utilize the Town’s limited street maintenance budget, staff is proposing a pilot program that outlines the steps needed to preserve the current pavement condition on two local street segments. The two street segments selected (Chama and Primrose, see attached map) have reached the end of their service life and require reconstruction. The proposed pilot program (chip seal with a cape seal) has been utilized by the City of Glendale, the Town of Florence and other County and municipal governments with favorable results on streets of similar condition. The estimated cost for reconstruction for these segments is $600,000 to $900,000 while the cost for the chip seal with cape seal is $209,473.72 The chip seal with cape seal treatment is a much less expensive alternative to complete reconstruction for road segments at the end of their service life, ideal for residential and collector streets.  As the name suggests, this treatment consists of two preventative maintenance applications; a chip seal overcoated with a slurry seal. A chip seal is an application of small angular rock (chips) approximately 1/4” to 3/8” in maximum size, embedded into a thick application of asphalt emulsion. Most chip seals incorporate polymer modified binders. The chip seal with a cape seal treatment will maintain a pavement which needs to be reconstructed, and can extend the service life of pavement for up to 8 to 10 years. For the proper application of a chip seal with cape seal, an initial chip seal is applied to the surface of the road, followed by the application of a slurry seal on top of that surface seven to ten days later. The slurry seal (cape seal) prevents water from penetrating through the roadway section and provides a new skid resistant surface. If the Town experiences favorable results from these pilot locations, it will utilize this treatment on many of our roads that are at the end of their useful service life and currently slated for complete re-construction.  The cost savings resulting from the less costly chip seal with cape seal, coupled with extending the life of these roads for 8-10 years will have an enormous positive impact on the Town’s roadway budget, allowing the Town to treat more of our roadways and “catch up” on our current deficiencies, and increase the overall pavement condition index (PCI) of our roadway network.  Related Ordinance, Policy or Guiding Principle Pavement Management best practices  Risk Analysis These street segments are close to failure and will benefit from a chip seal overcoated with a slurry seal.  By using this less expensive method to repair these street segments, the town is able to extend the life of the streets and avoid a considerably higher cost of reconstructing the streets.   Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) Staff recommends approval of Professional Services Agreement 2022-074 SUGGESTED MOTION MOVE to approve Professional Services Agreement 2022-074, between the Town of Fountain Hills and Cactus Transport, Inc, D/B/A Cactus Asphalt in the amount of $209,473.72 Fiscal Impact Fiscal Impact:$209,473.72 Budget Reference:280 Funding Source:Streets fund If Multiple Funds utilized, list here:N/A Budgeted: if No, attach Budget Adjustment Form:N/A Attachments Professional Services Agreement  Scope and Fee  Underlying Agreement  Chama map  Primrose map  Form Review Inbox Reviewed By Date Public Works Director (Originator)Justin Weldy 03/02/2022 03:51 PM Finance Director David Pock 03/03/2022 09:08 AM Town Attorney Aaron D. Arnson 03/03/2022 10:58 AM Town Manager Grady E. Miller 03/03/2022 04:04 PM Form Started By: Justin Weldy Started On: 03/02/2022 03:01 PM Final Approval Date: 03/03/2022  1 Contract No. 2022-074 COOPERATIVE PURCHASING AGREEMENT BETWEEN THE TOWN OF FOUNTAIN HILLS AND CACTUS TRANSPORT, INC. D/B/A CACTUS ASPHALT THIS COOPERATIVE PURCHASING AGREEMENT (this “Agreement”) is entered into as of March 15, 2022, between the Town of Fountain Hills, an Arizona municipal corporation (the “Town”), and Cactus Transport, Inc., d/b/a Cactus Asphalt, a(n) Arizona corporation (the “Contractor”). RECITALS A. After a competitive procurement process (Solicitation ROQ-175923), Pinal County (AZ) (the “County”) entered into Contract 175923ROQ, dated June 27, 2018 (the “County Contract”), for the Contractor to provide JOC Asphalt Maintenance and Repair Service. A copy of the County Contract is attached hereto as Exhibit A and incorporated herein by reference, to the extent not inconsistent with this Agreement. B. The Town is permitted, pursuant to Section 3-3-27 of the Town Code, to make purchases under the County Contract, at its discretion and with the agreement of the awarded Contractor, and the County Contract permits its cooperative use by other public entities, including the Town. C. The Town and the Contractor desire to enter into this Agreement for the purpose of (i) acknowledging their cooperative contractual relationship under the County Contract and this Agreement, (ii) establishing the terms and conditions by which the Contractor may provide JOC Asphalt Maintenance and Repair Service (the “Materials and Services”) and (iii) setting the maximum aggregate amount to be expended pursuant to this Agreement related to the Materials and Services. AGREEMENT NOW, THEREFORE, in consideration of the foregoing introduction and recitals, which are incorporated herein by reference, the following mutual covenants and conditions, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Town and the Contractor hereby agree as follows: 1. Term of Agreement. This Agreement shall be effective as of the date first set forth above and shall remain in full force and effect until March 14, 2023 (the “Initial Term”), unless terminated as otherwise provided in this Agreement or the County Contract. After the expiration of the Initial Term, this Agreement may be renewed for up to four successive one-year terms (the “Renewal Term”) if: (i) it is deemed in the best interests of the Town, subject to availability and 2 appropriation of funds for renewal in each subsequent year, (ii) the term of the County Contract has not expired or has been extended, (iii) at least 30 days prior to the end of the then-current term of this Agreement, the Contractor requests, in writing, to extend this Agreement for an additional one- year term and (iv) the Town approves the additional one-year term in writing (including any price adjustments approved as part of the County Contract), as evidenced by the Town Manager’s signature thereon, which approval may be withheld by the Town for any reason. The Contractor’s failure to seek a renewal of this Agreement shall cause this Agreement to terminate at the end of the then-current term of this Agreement; provided, however, that the Town may, at its discretion and with the agreement of the Contractor, elect to waive this requirement and renew this Agreement. The Initial Term and any Renewal Term(s) are collectively referred to herein as the “Term.” Upon renewal, the terms and conditions of this Agreement shall remain in full force and effect. 2. Scope of Work. Contractor shall provide to the Town the Services under the terms and conditions of the County Contract and according to the specifications set forth in the Contractor’s Proposal attached hereto as Exhibit B and incorporated herein by reference. 2.1 Inspection; Acceptance. All Materials and Services are subject to final inspection and acceptance by the Town. Materials failing to conform to the requirements of this Agreement and/or the State Contract will be held at Contractor’s risk and may be returned to the Contractor. If so returned, all costs are the responsibility of the Contractor. Upon discovery of non- conforming Materials or Services, the Town may elect to do any or all of the following by written notice to the Contractor: (i) waive the non-conformance; (ii) stop the work immediately; or (iii) bring Materials or Services into compliance and withhold the cost of same from any payments due to the Contractor. 2.2 Cancellation. The Town reserves the right to cancel any work order within a reasonable time after issuance. Should a work order be canceled, the Town agrees to reimburse the Contractor, but only for actual and documentable costs incurred by the Contractor due to and after issuance of the work order. The Town will not reimburse the Contractor for any costs incurred after receipt of the Town notice of cancellation, or for lost profits, shipment of product prior to issuance of a work order or for anything not expressly permitted pursuant to this Agreement. 3. Compensation. The Town shall pay Contractor an amount not to exceed $209,473.72 for the Materials and Services at the rates set forth in the County Contract and as more particularly set forth in Exhibit B. The aggregate amount per renewal term shall not exceed $50,000 in any case unless the Agreement is affirmed and ratified via an executed amendment. All remaining terms and conditions of the Agreement shall remain in full force and effect. 4. Payments. The Town shall pay the Contractor monthly (and the Contractor shall invoice monthly), based upon acceptance and delivery of Materials and/or Services performed and completed to date, and upon submission and approval of invoices. Each invoice shall (i) contain a reference to this Agreement and the County Contract and (ii) document and itemize all work completed to date. The invoice statement shall include a record of materials delivered, time expended, and work performed in sufficient detail to justify payment. Additionally, invoices submitted without referencing this Agreement and the County Contract will be subject to rejection and may be returned. 3 5. Records and Audit Rights. To ensure that the Contractor and its subcontractors are complying with the warranty under Section 6 below, Contractor’s and its subcontractors’ books, records, correspondence, accounting procedures and practices, and any other supporting evidence relating to this Agreement, including the papers of any Contractor and its subcontractors’ employees who perform any work or services pursuant to this Agreement (all of the foregoing hereinafter referred to as “Records”), shall be open to inspection and subject to audit and/or reproduction during normal working hours by the Town, to the extent necessary to adequately permit evaluation of the Contractor’s and its subcontractors’ compliance with the Arizona employer sanctions laws referenced in Section 6 below. To the extent necessary for the Town to audit Records as set forth in this Section, Contractor and its subcontractors hereby waive any rights to keep such Records confidential. For the purpose of evaluating or verifying such actual or claimed costs or units expended, the Town shall have access to said Records, even if located at its subcontractors’ facilities, from the effective date of this Agreement for the duration of the work and until three years after the date of final payment by the Town to Contractor pursuant to this Agreement. Contractor and its subcontractors shall provide the Town with adequate and appropriate workspace so that the Town can conduct audits in compliance with the provisions of this Section. The Town shall give Contractor or its subcontractors reasonable advance notice of intended audits. Contractor shall require its subcontractors to comply with the provisions of this Section by insertion of the requirements hereof in any subcontract pursuant to this Agreement. 6. E-verify Requirements. To the extent applicable under ARIZ. REV. STAT. § 41- 4401, the Contractor and its subcontractors warrant compliance with all federal immigration laws and regulations that relate to their employees and their compliance with the E-verify requirements under ARIZ. REV. STAT. § 23-214(A). Contractor’s or its subcontractors’ failure to comply with such warranty shall be deemed a material breach of this Agreement and may result in the termination of this Agreement by the Town. 7. Israel. Contractor certifies that it is not currently engaged in and agrees for the duration of this Agreement that it will not engage in a “boycott,” as that term is defined in ARIZ. REV. STAT. § 35-393, of Israel. 8. Conflict of Interest. This Agreement may be canceled by the Town pursuant to ARIZ. REV. STAT. § 38-511. 9. Applicable Law; Venue. This Agreement shall be governed by the laws of the State of Arizona and a suit pertaining to this Agreement may be brought only in courts in Maricopa County, Arizona. 10. Agreement Subject to Appropriation. The Town is obligated only to pay its obligations set forth in this Agreement as may lawfully be made from funds appropriated and budgeted for that purpose during the Town’s then current fiscal year. The Town’s obligations under this Agreement are current expenses subject to the “budget law” and the unfettered legislative discretion of the Town concerning budgeted purposes and appropriation of funds. Should the Town elect not to appropriate and budget funds to pay its Agreement obligations, this Agreement shall be deemed terminated at the end of the then-current fiscal year term for which such funds were appropriated and budgeted for such purpose and the Town shall be relieved of any subsequent obligation under this Agreement. The parties agree that the Town has no obligation or duty of good faith to budget or appropriate the payment of the Town’s obligations set forth in this Agreement in 4 any budget in any fiscal year other than the fiscal year in which this Agreement is executed and delivered. The Town shall be the sole judge and authority in determining the availability of funds for its obligations under this Agreement. The Town shall keep Contractor informed as to the availability of funds for this Agreement. The obligation of the Town to make any payment pursuant to this Agreement is not a general obligation or indebtedness of the Town. Contractor hereby waives any and all rights to bring any claim against the Town from or relating in any way to the Town's termination of this Agreement pursuant to this section. 11. Conflicting Terms. In the event of any inconsistency, conflict or ambiguity among the terms of this Agreement, the County Contract, the Proposal, and invoices, the documents shall govern in the order listed herein. Notwithstanding the foregoing, and in conformity with Section 2 above, unauthorized exceptions, conditions, limitations or provisions in conflict with the terms of this Agreement or the County Contract (collectively, the “Unauthorized Conditions”), other than the Town’s project-specific requirements, are expressly declared void and shall be of no force and effect. Acceptance by the Town of any work order or invoice containing any such Unauthorized Conditions or failure to demand full compliance with the terms and conditions set forth in this Agreement or under the County Contract shall not alter such terms and conditions or relieve Contractor from, nor be construed or deemed a waiver of, its requirements and obligations in the performance of this Agreement. 12. Rights and Privileges. To the extent provided under the County Contract, the Town shall be afforded all of the rights and privileges afforded to the State and shall be the “State” (as defined in the County Contract) for the purposes of the portions of the County Contract that are incorporated herein by reference. 13. Indemnification; Insurance. In addition to and in no way limiting the provisions set forth in Section 12 above, the Town shall be afforded all of the insurance coverage and indemnifications afforded to the State to the extent provided under the County Contract, and such insurance coverage and indemnifications shall inure and apply with equal effect to the Town under this Agreement including, but not limited to, the Contractor’s obligation to provide the indemnification and insurance. In any event, the Contractor shall indemnify, defend and hold harmless the Town and each council member, officer, employee or agent thereof (the Town and any such person being herein called an “Indemnified Party”), for, from and against any and all losses, claims, damages, liabilities, costs and expenses (including, but not limited to, reasonable attorneys’ fees, court costs and the costs of appellate proceedings) to which any such Indemnified Party may become subject, under any theory of liability whatsoever (“Claims”), insofar as such Claims (or actions in respect thereof) relate to, arise out of, or are caused by or based upon the negligent acts, intentional misconduct, errors, mistakes or omissions, in connection with the work or services of the Contractor, its officers, employees, agents, or any tier of subcontractor in the performance of this Agreement. 14. Notices and Requests. Any notice or other communication required or permitted to be given under this Agreement shall be in writing and shall be deemed to have been duly given if (i) delivered to the party at the address set forth below, (ii) deposited in the U.S. Mail, registered or certified, return receipt requested, to the address set forth below or (iii) given to a recognized and reputable overnight delivery service, to the address set forth below: If to the Town: Town of Fountain Hills 5 16705 E. Avenue of the Fountains Fountain Hills, Arizona 85268 Attn: Grady E. Miller, Town Manager With copy to: Town of Fountain Hills 16705 East Avenue of the Fountains Fountain Hills, Arizona 85268 Attn: Aaron D. Arnson, Town Attorney If to Contractor: Cactus Transport, Inc. d/b/a Cactus Asphalt 8211 W. Sherman St. Tolleson, Arizona 85353 Attn: John Flores or at such other address, and to the attention of such other person or officer, as any party may designate in writing by notice duly given pursuant to this subsection. Notices shall be deemed received: (i) when delivered to the party, (ii) three business days after being placed in the U.S. Mail, properly addressed, with sufficient postage or (iii) the following business day after being given to a recognized overnight delivery service, with the person giving the notice paying all required charges and instructing the delivery service to deliver on the following business day. If a copy of a notice is also given to a party’s counsel or other recipient, the provisions above governing the date on which a notice is deemed to have been received by a party shall mean and refer to the date on which the party, and not its counsel or other recipient to which a copy of the notice may be sent, is deemed to have received the notice. [SIGNATURES APPEAR ON FOLLOWING PAGES] EXHIBIT B TO COOPERATIVE SERVICES AGREEMENT BETWEEN THE TOWN OF FOUNTAIN HILLS AND CACTUS TRANSPORT, INC. D/B/A CACTUS ASPHALT [Quote or Work Order] See following pages. To:Contact:Town Of Fountain Hills David A. Janover, PE Town Of Fountain Hills - Cape SealProject Name:Bid Number:CA252322009 Fax:(480) 837-8328Fountain Hills, AZ 85268 Address:16705 E. Avenue Of The Fountains Phone:(480) 816-5150 Project Location:Primrose (Lost Hills-Tumbleweed), Chama (Gunsight - FH BLVD), Fountain Hills, AZ Bid Date:2/25/2022 Total PriceUnit PriceUnitItem DescriptionItem # Line #Estimated Quantity $16,980.67$1.998,533.006-21 SYEDGE MILLING: Edge Of Pavement Will Be Wedge-Milled And The Asphalt Millings Removed, Hauled Off And Legally Disposed Of. - Chama (~ 8'x4,911') - Primrose (~ 8'x4,689') $37,957.92$862.6844.004-11 TONPMAR BINDER (16,700 SY @ 0.65 GAL/SY) (<100 TONS): $4,488.00$102.0044.004-19 TONBINDER HAUL AND APPLY: $27,604.00$103.00268.004-23 TONCHIPS - HV PRE-COATED (16,700 SY @ 32 LBS/SY): $1,760.00$40.0044.004-28 TONTRAFFIC CONTROL CHIP-SEAL (Based On Binder Tonnage): $24,469.12$941.1226.005-19 TONSLURRY SEAL CQS (< 100 TONS)(15% Of 168 Tons Aggregate): $20,496.00$122.00168.005-27 TONSLURRY SEAL AGGREGATE RES TYPE-II (16,700 SY @ 20LBS/SY): $3,666.00$141.0026.005-35 TONTRAFFIC CONTROL SLURRY (Based On Binder Ton): $10,256.00$641.0016.008-2 EACHADJUST VALVE BOX & COVER: $12,964.00$926.0014.008-5 EACHADJUST MANHOLE & COVER: $74.40$0.16465.007-4 LF15 MIL (4") WHITE TRAFFIC PAINT STRIPE : 12" Stop Bars Will Be Laid Out And Repainted In Their Original Locations. $302.25$0.65465.007-12 LFTRANSVERSE THERMOPLASTIC 12" STOP BARS (3x4"):~ 30 Days Later, Thermoplastic Markings Will Be Applied. $30,000.00$30,000.001.009-1 LSTRAFFIC CONTROL SET UP FOR MILLING, STRIPING & ADJUSTMENTS (Not Included With TC For Chip-Seal Or Slurry-Seal Items Above)(This Item Also Includes Mark-Up For Entire Project): $7,000.00$35.00200.009-4 HRFLAGGING SERVICES PER HOUR (Not Included With Either Chip-seal Or Slurry Seal TC Above):5 Flaggers For 6 Days During Milling & Patching Operations. $198,018.36Bid Price Subtotal: $11,455.36Maricopa County, State And Fountain Hills 5.7850%: $209,473.72Total Bid Price: Notes: •Standard Terms and Conditions to follow. •All scheduling contingent upon mutual agreement of Owner and Cactus Asphalt. •Quoted prices valid for 60 days unless otherwise noted. •Cactus is not responsible for notification, nor removal of vehicles and property from work areas. Page 1 of 22/25/2022 3:47:57 PM To:Contact:Town Of Fountain Hills David A. Janover, PE Town Of Fountain Hills - Cape SealProject Name:Bid Number:CA252322009 Fax:(480) 837-8328Fountain Hills, AZ 85268 Address:16705 E. Avenue Of The Fountains Phone:(480) 816-5150 Project Location:Primrose (Lost Hills-Tumbleweed), Chama (Gunsight - FH BLVD), Fountain Hills, AZ Bid Date:2/25/2022 •In the event that quantities differ from above, billing will reflect agreed upon measured quantities. •EXCLUSIONS (Unless Otherwise Specified): Plans, Engineering, Survey, Staking, As-Builts, Testing, Inspection, Gradework, Landscape Areas, Weed Killer, Crack-Sealing, ABC or Landscape Materials, Vegetation Replacement, Prime Coat, Concrete Structures, Irrigation or Pipe Work, Utility Removal or Relocation, Drywells, Rip/Rap, Structural Backfill, New Signage, Excavation, Subgrade Stabilization, Removal of Debris Generated by Other Trades, Erosion Control, Thickened Pavement Edge, Project Information Sign And Any Special Insurance Requirements. ACCEPTED: The above prices, specifications and conditions are satisfactory and hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: Cactus Asphalt Authorized Signature: Estimator:John Flores (602) 319-3420 jf@cactusasphalt.com Page 2 of 22/25/2022 3:47:57 PM EXHIBIT A TO COOPERATIVE SERVICES AGREEMENT BETWEEN THE TOWN OF FOUNTAIN HILLS AND CACTUS TRANSPORT, INC. D/B/A CACTUS ASPHALT [County Contract] See following pages. #Item Description Quantity Required Unit of Measure Unit Price #1-1 Crack Sealing 1/4 To 1" Width 1 LBS 1.27$ #1-2 Crack Routing 1 LBS 0.24$ #1-3 Crack Vacuum 1 LBS 0.15$ #1-4 Traffic Control - Crack Sealing 1 LBS 0.47$ #2-1 Crack Seal 1" To 2" Utilizing Crack Mastic 1 LBS 3.55$ #2-2 Traffic Control - Crack Mastic 1 LBS 1.03$ #3-1 Asphalt Emulsion Fog Seal SS 1:1 Or CSS 1:1, 1 TON 325.00$ #3-2 Asphalt Emulsion Fog Seal SS 1:1 Or CSS 1:1, 1 TON 223.00$ #3-3 Asphalt Emulsion Fog Seal TRMSS, < 50 TONS 1 TON 589.00$ #3-4 Asphalt Emulsion Fog Seal TRMSS, > 50 TONS 1 TON 549.00$ #3-5 Asphalt Emulsion Fog Seal PASS QB, < 50 TO 1 TON 447.00$ #3-6 Asphalt Emulsion Fog Seal PASS QB, > 50 TO 1 TON 414.00$ #3-7 Asphalt Emulsion Fog Seal CQS-TR, < 50 TON 1 TON 591.00$ #3-8 Asphalt Emulsion Fog Seal CQS-TR, > 50 TON 1 TON 566.00$ #3-9 Asphalt Emulsion Fog Seal CQS-LM, < 50 TON 1 TON 609.00$ #3-10 Asphalt Emulsion Fog Seal CQS-LM, > 50 TON 1 TON 583.00$ #3-11 Asphalt Emulsion Fog Seal TR-Fog, < 50 TONS 1 TON 457.00$ #3-12 Asphalt Emulsion Fog Seal TR-Fog, > 50 TONS 1 TON 435.00$ #3-13 Fog Seal Binder - Haul and Apply Services 1 TON 233.00$ #3-14 Traffic Control - Fog Seal (Based on Binder TO 1 TON 138.00$ #3-15 PMM Seal Coat 1 SY 0.60$ #3-16 MTR Seal Coat 1 SY 0.33$ #3-17 Seal Coat Binder - Haul and Apply Services 1 TON 569.00$ #3-18 Traffic Control - Seal Coat (Based on Binder TO 1 TON 222.00$ #4-1 Chip Seal Binder: AC15-5TR, < 100 TONS 1 TON 708.00$ #4-2 Chip Seal Binder: AC15-5TR, > 100 TONS 1 TON 691.00$ #4-3 Chip Seal Binder: MC-800 TR, < 100 TONS 1 TON 724.00$ #4-4 Chip Seal Binder: MC-800 TR, > 100 TONS 1 TON 707.00$ #4-5 Chip Seal Binder: Asphalt Rubber (PG 64-16, 1 1 TON 671.00$ #4-6 Chip Seal Binder: Asphalt Rubber (PG 64-16, 1 1 TON 486.00$ #4-7 Chip Seal Binder: Asphalt Rubber (PG 58-22, 1 1 TON 671.00$ #4-8 Chip Seal Binder: Asphalt Rubber (PG 58-22, 1 1 TON 486.00$ #4-9 Chip Seal Binder: RAB (Rubberized Asphalt Bin 1 TON 739.00$ #4-10 Chip Seal Binder: RAB (Rubberized Asphalt Bin 1 TON 554.00$ #4-11 Chip Seal Binder: Polymer Modified Asphalt Ru 1 TON 761.00$ #4-12 Chip Seal Binder: Polymer Modified Asphalt Ru 1 TON 576.00$ #4-13 Chip Seal Binder: Polymer Modified Asphalt Ru 1 TON 761.00$ #4-14 Chip Seal Binder: Polymer Modified Asphalt Ru 1 TON 576.00$ #4-15 Chip Seal Binder: CRS-TR, < 100 TONS 1 TON 579.00$ #4-16 Chip Seal Binder: CRS-TR, > 100 TONS 1 TON 566.00$ #4-17 Chip Seal Binder: CRS-2P, < 100 TONS 1 TON 513.00$ #4-18 Chip Seal Binder: CRS-2P, > 100 TONS 1 TON 500.00$ #4-19 Chip Seal Binder - Haul & Apply Services 1 TON 102.00$ #4-20 Scrub Seal Binder: Rubberized Asphalt Scrub S 1 TON 810.00$ #4-21 Scrub Seal Binder: Rubberized Asphalt Scrub S 1 TON 626.00$ #4-22 Scrub Seal Binder - Haul & Apply Services 1 TON 269.00$ Cactus Asphalt #4-23 Chip Seal Aggregate - HVT Pre-Coated 1 TON 103.00$ #4-24 Chip Seal Aggregate - LVT Pre-Coated 1 TON 103.00$ #4-25 Chip Seal Aggregate - HVT Non-Coated 1 TON 83.50$ #4-26 Chip Seal Aggregate - LVT Non-Coated 1 TON 83.50$ #4-27 Scrub Seal Aggregate 1 TON 168.00$ #4-28 Traffic Control - Chip and Scrub Seal (Based on 1 TON 40.00$ #4-29 Chip Seal Binder: PASS CR, <100 Tons 1 TON 718.00$ #4-30 Chip Seal Binder: PASS CR, >100 Tons 1 TON 702.00$ #5-1 Micro Surface Binder: LMCQSTR-MS, < 100 T 1 TON ####### #5-2 Micro Surface Binder: LMCQSTR-MS, > 100 T 1 TON ####### #5-3 Micro Surface Binder: MSE (MAG Spec.), < 10 1 TON ####### #5-4 Micro Surface Binder: MSE (MAG Spec.), > 10 1 TON 958.00$ #5-5 Micro Surface Binder: CQSLM, < 100 TONS 1 TON ####### #5-6 Micro Surface Binder: CQSLM, > 100 TONS 1 TON 958.00$ #5-7 Micro Surface Binder: CQSPM, < 100 TONS 1 TON ####### #5-8 Micro Surface Binder: CQSPM, > 100 TONS 1 TON ####### #5-9 Micro Surface Binder: CQSLM TR, < 100 TON 1 TON ####### #5-10 Micro Surface Binder: CQSLM TR, > 100 TON 1 TON ####### #5-11 Slurry Seal Binder: LMCQSTR, < 100 TONS 1 TON ####### #5-12 Slurry Seal Binder: LMCQSTR, > 100 TONS 1 TON ####### #5-13 Slurry Seal Binder: LMCQS, < 100 TONS 1 TON 981.00$ #5-14 Slurry Seal Binder: LMCQS, > 100 TONS 1 TON 843.00$ #5-15 Slurry Seal Binder: PMCQS (Solid Polymer SB 1 TON ####### #5-16 Slurry Seal Binder: PMCQS (Solid Polymer SB 1 TON 883.00$ #5-17 Slurry Seal Binder: PMQS h, < 100 TONS 1 TON #5-18 Slurry Seal Binder: PMQS h, > 100 TONS 1 TON #5-19 Slurry Seal Binder: CQS, < 100 TONS 1 TON 863.00$ #5-20 Slurry Seal Binder: CQS, > 100 TONS 1 TON 790.00$ #5-21 Slurry Seal Binder: CQSLM, < 100 TONS 1 TON 982.00$ #5-22 Slurry Seal Binder: CQSLM, > 100 TONS 1 TON 843.00$ #5-23 Slurry Seal Binder: CQS TR, < 100 TONS 1 TON ####### #5-24 Slurry Seal Binder: CQS TR, > 100 TONS 1 TON 941.00$ #5-25 Slurry Seal Binder: CQSLM TR, < 100 TONS 1 TON ####### #5-26 Slurry Seal Binder: CQSLM TR, > 100 TONS 1 TON ####### #5-27 Slurry Seal Aggregate (Type I) Residential 1 TON 219.00$ #5-28 Slurry Seal Aggregate (Type II) Residential 1 TON 122.00$ #5-29 Slurry Seal Aggregate (Type II) Arterial 1 TON 124.00$ #5-30 Slurry Seal Aggregate (Type III) Residential 1 TON 120.00$ #5-31 Slurry Seal Aggregate (Type III) Arterial 1 TON 123.00$ #5-32 Micro Surfacing Aggregate (Type II)1 TON 154.00$ #5-33 Micro Surfacing Aggregate (Type III)1 TON 124.00$ #5-34 Slurry Seal & Micro Seal Fiber Additive 1 LBS 8.00$ #5-35 Traffic Control - Slurry and Micro Seal (Based o 1 TON 141.00$ #6-1 Asphalt Concrete Pavement (Marshall 1/2" Mix 1 TON 123.75$ #6-2 Asphalt Concrete Pavement (Marshall 1/2" Mix 1 TON 89.10$ #6-3 Asphalt Concrete Pavement (Marshall 1/2" Mix 1 TON 123.75$ #6-4 Asphalt Concrete Pavement (Marshall 1/2" Mix 1 TON 89.10$ #6-5 Asphalt Concrete Pavement (Marshall 3/4" Mix 1 TON 123.75$ #6-6 Asphalt Concrete Pavement (Marshall 3/4" Mix 1 TON 89.10$ #6-7 Asphalt Concrete Pavement (Marshall 3/4" Mix 1 TON 123.75$ #6-8 Asphalt Concrete Pavement (Marshall 3/4" Mix 1 TON 89.10$ #6-9 Asphalt Concrete Pavement (Superpave 1/2" M 1 TON 123.75$ #6-10 Asphalt Concrete Pavement (Superpave 1/2" M 1 TON 89.10$ #6-11 Asphalt Concrete Pavement (Superpave 3/4" M 1 TON 123.75$ #6-12 Asphalt Concrete Pavement (Superpave 3/4" M 1 TON 89.10$ #6-13 Asphalt-Rubber Concrete Pavement, < 500 TO 1 TON 158.50$ #6-14 Asphalt-Rubber Concrete Pavement, > 500 TO 1 TON 122.50$ #6-15 Bituminous Tack Coat (CSS-1H, Diluted)1 TON 686.00$ #6-16 Asphaltic Concrete Patching (Remove And Rep 1 TON 275.00$ #6-17 Asphaltic Concrete Patching (Pothole Patching 1 TON ####### #6-18 Recondition Shoulder 1 SY 2.00$ #6-19 Shoulder Build-Up Material 1 TON 28.00$ #6-20 Saw Cut Asphaltic Concrete Pavement (Per Inc 1 LF 0.35$ #6-21 Asphaltic Concrete Pavement Milling (Edge Mil 1 SY 1.99$ #6-22 Asphalt Profiling (Micro Milling 1 to 2,000 SY)1 SY 6.40$ #6-23 Asphalt Profiling (Micro Milling 2,001 to 4,000)1 SY 4.21$ #6-24 Asphalt Profiling (Micro Milling 4,001 to 16,000)1 SY 2.89$ #6-25 Asphalt Profiling (Micro Milling 16,001 to 32,000 1 SY 2.20$ #6-26 Asphalt Profiling (Micro Milling 32,001 to 64,000 1 SY 2.02$ #7-1 Remove Thermoplastic Stripe 1 LF 0.63$ #7-2 Remove Thermoplastic Symbol Or Legend 1 EA 79.00$ #7-3 Remove Raised Pavement Marker 1 EA 2.35$ #7-4 15 MIL (4") White Traffic Paint Stripe 1 LF 0.16$ #7-5 15 MIL (4") Yellow Traffic Paint Stripe 1 LF 0.16$ #7-6 Paint Symbol Arrow 1 EA 79.00$ #7-7 Paint Symbol (RR Crossing)1 EA 150.00$ #7-8 Paint Symbol (Bike Lane Marking Set)1 EA 103.00$ #7-9 Paint Legend "Only"1 EA 79.00$ #7-10 60 MIL (4") White Thermoplastic Traffic Stripe 1 LF 0.38$ #7-11 60 MIL (4") Yellow Thermoplastic Traffic Stripe 1 LF 0.38$ #7-12 Transverse Thermoplastic 4" Equivalent 1 LF 0.65$ #7-13 Thermoplastic Pavement Arrow 90 MIL 1 EA 158.00$ #7-14 Thermoplastic Symbol, RR Crossing 90 MIL 1 EA 307.00$ #7-15 Thermoplastic Legend "Only" 90 MIL 1 EA 189.00$ #7-16 25 MIL (4") White Dual Component Pavement M 1 LF 0.41$ #7-17 25 MIL (4") Yellow Dual Component Pavement 1 LF 0.41$ #7-18 Transverse Dual Component Pavement Markin 1 EA 0.75$ #7-19 Dual Component Pavement Marking Symbol (E 1 EA 354.00$ #7-20 Dual Component Pavement Marking Legend (E 1 EA 354.00$ #7-21 Pre-Formed Tape Striping (3M 270 Series) 4" E 1 LF 2.75$ #7-22 Pre-Formed Symbol (3M 270 Series)1 EA 275.00$ #7-23 Pre-Formed Legend (3M 270 Series)1 EA 307.00$ #7-24 Reflectorized Raised Pavement Marker (Type D 1 EA 3.95$ #7-25 Reflectorized Raised Pavement Marker (Type G 1 EA 3.95$ #7-26 Reflectorized Riased Pavement Marker (Type H 1 EA 3.95$ #7-27 Reflectorized Raised Pavement Marker (Type 9 1 EA 3.95$ #7-28 Chip Seal Marker, ADOT Std M-20 1 EA 2.15$ #8-1 Adjust Round Frame & Cover To Grade, MAG D 1 EA 665.00$ #8-2 Adjust Valve Box & Cover To Grade, MAG Det. 1 EA 641.00$ #8-3 Adjust Valve Box & Cover To Grade, MAG Det. 1 EA 641.00$ #8-4 Adjust Valve Box & Cover To Grader, MAG Det 1 EA 641.00$ #8-5 Adjust Manhole Frame & Cover To Grade, MAG 1 EA 926.00$ #9-1 Traffic Control (Not for Items No. 1-5)1 LS -$ #9-2 Message Board (Per Unit Per Day)1 DY 75.00$ #9-3 Uniformed Off-Duty Pinal County Sheriff Deputy 1 HR 45.00$ #9-4 Flagging Services (Hours Vary By Job)1 HR 35.00$ #9-5 Pilot Car And Driver (Hours Vary By Job)1 HR 65.00$ #9-6 Document Existing Pavement Markings 1 LS -$ #9-7 Miscellaneous Removals And Other Work 1 LS -$ #9-8 Paved Surface Cleaning 1 MILE ####### #9-9 Community Relations 1 LS -$ ROQ-175923 JOC Asphalt Maintenance & Repair Services Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 1 of 37 NOTICE OF REVIEW OF QUALIFICATIONS Designated Agency: PINAL COUNTY PUBLIC WORKS DEPARTMENT Material or Service: JOC ASPHALT MAINTENANCE & REPAIR SERVICES Contract Type: FIRM FIXED PRICE Contract Period: ONE (1) YEAR INITIAL TERM FOUR (4) ONE-YEAR RENEWAL OPTIONS Pre-Submittal Conference: N/A Question Due Date: BY 5:00 PM ARIZONA TIME ON MAY 9, 2018 Solicitation Due Date: BY 2:00 PM ARIZONA TIME ON MAY 22, 2018 Number of Copies Required: ELECTRONIC SUBMITTAL Solicitation Opening Date: BY 2:15 PM ARIZONA TIME ON MAY 22, 2018 Solicitation Opening Location: 31 NORTH PINAL STREET BUILDING A FLORENCE, AZ 85132 Procurement Officer Contact Name: LORINA GILLETTE, CPPB Telephone: (520) 866- 6639 Fax: (520) 866- 2903 E-mail: Lorina.Gillette@pinalcountyaz.gov Table of Contents Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 2 of 37 SOLICITATION DOCUMENTS SCOPE OF WORK……………………………………………………………………………….…………….p. 3 DEFINITIONS…………………………………………………………………………………………………...p. 7 SPECIAL INSTRUCTIONS……………………………………………………………………………………p. 10 UNIFORM INSTRUCTIONS………………………………………………………………………………….. p. 13 TERMS AND CONDITIONS…………………………………………………………………………………. p. 18 ADDENDUM ACKNOWLEDGEMENT FORM…………………………………………………………….. p. 31 W-9 FORM …………………………………………………………………………………………………….. p. 32 RESPONDERS CHECKLIST………………………………….…………………………………………..... p. 33 OFFER AND ACCEPTANCE FORM……..……………….…………………………………………………p. 34 EXHIBITS AND ATTACHMENTS Attachment A – Bonfire Submission Instructions for Suppliers END OF SOLICITATION Statement of Work Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 3 of 37 1. INTRODUCTION 1.1 Purpose and Description Pinal County Public Works (County) is seeking experienced Contractors to provide Asphalt Maintenance and Repair Services on an as-needed basis at various project locations throughout the County utilizing the Job Order Contracting (JOC) project delivery method. It is the intent of the County to select four (4) contractors for contract award. The initial term of the JOC will be for a minimum of one (1) year and may be renewed up to four (4) additional one-year terms. Renewal of the contract will be at the sole option of the County and be based on the successful performance of the JOC Contractor and the needs of the County. The individual job order assignment maximum amount is $1,000,000. It is the County’s intent to enter into a cost plus fee structure. During the term of the JOC, work is performed as a series of individual job orders assignments. Individual projects may require the expenditure approval of the Pinal County Board of Supervisors. Each job order assignment, initiated by the owner, is defined cooperatively by the owner and contractor. A scope, schedule and price are negotiated and agreed upon. Then the contractor is directed to proceed with the work. Job Order Contracting may include design services, pre-construction services, construction work, maintenance and as-built documents. The County has elected to use the JOC delivery method for these projects as outlined under A.R.S. Title 34. Cost effective construction in the shortest possible time frame and within the County’s tolerance of financial risk will be the guiding principles behind the projects. 1.2 Cooperative Purchasing This contract shall be for the permissive use by Pinal County. The County has entered into various cooperative purchasing agreements with other Arizona government entities in order to conserve resources, reduce overhead and purchase costs and improve delivery time. The contract resulting from this Solicitation may be extended for use by other municipalities, school districts and government agencies in the State of Arizona with the approval of the Contractor. Orders placed by other agencies and payment thereof will be the sole responsibility of that agency. The County shall not be responsible for any disputes arising out of transactions made by others. 2. SCOPE OF WORK 2.1 Scope of Work The County maintains a network of civil infrastructure. The infrastructure includes, but not limited to, paved streets, dirt roads, trails, multi-use paths, park pavements, and parking lots. This JOC will be focused but not limited to, supplying all labor, material, and equipment for asphalt maintenance and repairs. Work assignments may include but not limited to, and the successful contractors shall have experience, knowledge and ability to accomplish the following tasks: 2.1.1 Obtain all necessary permits, required to complete the job order assignment, including but not limited to; Engineering off-site, haul route, stockpile, SWPPP, dust control, traffic control plans, etc. 2.1.2 Placing asphalt pavements including full depth sections, overlays, patches and repairs. 2.1.3 Pavement maintenance and rehabilitation; including but not limited to; crack sealing and joint sealing, crack routing and large crack repair, applying various types of surface treatments including fog seal, scrub seal, chip seal, other asphalt rejuvenation methods, milling and/or roadway profiling, saw cutting and removing both asphalt and concrete pavements. 2.1.4 Utility adjustments. 2.1.5 Minor subgrade preparation including compacting native soil, placing and compacting ABC, millings, soil stabilization and grading. 2.1.6 Minor earthwork: site rough and finishing grade. 2.1.7 Signing and striping including, survey of existing striping and signing, providing and installing project signs, obliteration of striping, layout and installing striping, symbols, raised pavement markers and signage. 2.1.8 Preparing traffic control plans, providing traffic set-up in accordance with the approved traffic control plans and barricading work areas. 2.1.9 Shoulder maintenance including grading, build-up, placement of surface treatment and sealing. Statement of Work Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 4 of 37 2.2 Project Information The successful JOC contractors will have documented established successful work relationships with various qualified subcontractors and knowledge of JOC project delivery methods. The specific work associated with each job order assignment shall be mutually agreed upon and issued by the County. For any project determined by the County to be appropriate for this Job Order Contract, the County will request that the contractor prepare a scope of work, cost proposal, project schedule and back-up supporting documentation. If acceptable, the County will issue a Purchas Order, at which time the parties will execute an individual job order assignment specifying the cost and completion schedule for that project. Although the County anticipates that the JOC Contractor will be issued work, the Contractor is neither guaranteed a minimum amount of work nor any jobs at all. The County reserves the right and will issue job order assignments based on ability of the contractor to meet the County’s work schedule and the availability of trades and expertise in relation to each project. All construction shall conform to the latest version of the Uniform Standard Specifications and Details for Public Works Construction published by the Maricopa Associate of Governments (MAG), Standard Specifications and Details for Road and Bridge Construction published by Arizona Department of Transportation (ADOT), Manual on Uniform Traffic Control Devices (MUTCD) published by Federal Highway Administration (FHWA), , and the construction documents (plans and specifications) associated with each Job Order assignment. 2.3 Work Authorization Any Work required under this Contract shall be authorized by issuance of formal, written Job Order Purchase Orders as follows: 2.3.1 As the need exists (as determined by the County) for performance under the terms of this Contract, the County will notify the Contractor of an existing requirement. 2.3.2 Upon the receipt of this notification, Contractor shall respond within two (2) working days, or as otherwise agreed, by: 2.3.2.1 Visiting the proposed site in the company of County staff, or; 2.3.2.2 Establishing contact with the County to further define the scope of the requirement. 2.3.3 After mutual agreement on the scope of the individual requirement, Contractor shall then prepare a proposal for accomplishment of the task unless Contractor, in its sole discretion, elects not to undertake the Work. If the Work is declined, Contractor will so notify the County in a timely manner. 2.3.4 The price matrix shall serve as the basis for establishing the value of the Work to be performed. 2.3.5 Contractor’s proposal shall be submitted within ten (10) working days unless otherwise agreed. 2.3.6 Upon receipt of the Contractor’s proposal, the County will review the proposal for completeness and will reach agreement with Contractor on pricing, schedule and all other terms, prior to issuance of a Job Order Purchase Order. 2.3.7 In the event the County does not issue a Job Order Purchase Order after receipt of the Contractor’s proposal, the County is not obligated to reimburse the Contractor for any costs incurred in the preparation of the proposal, except as noted in §2.4.3 2.4 Scheduling of Work 2.4.1 For each Job Order Purchase Order, the County will issue a Notice to Proceed. The first day of performance under a Job Order shall be the effective date in the Notice to Proceed. Any preliminary work started or material ordered or purchased before receipt of the Notice to Proceed shall be at the risk and expense of the Contractor. Contractor shall diligently prosecute the Work to completion within the time set forth in the Job Order Purchase Order. The period of performance includes allowances for mobilization, holidays, weekend days, normal inclement weather, and cleanup. Therefore, claims for delay based on these elements will not be allowed. When Contractor considers the Work complete and ready for its intended use, Contractor shall request the County to inspect the Work to determine the Statement of Work Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 5 of 37 status of completion. A minimum of 30 days prior to Final Completion the Contractor, in conjunction with the County, shall prepare a comprehensive list of Punch list items, which the County may edit and supplement. The Contractor shall proceed promptly to complete and correct Punch list items. Failure to include an item on the Punch list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Items on the Punch list must be completed or corrected prior to final payment for the Job Order. Contractor shall proceed promptly to complete and correct items on the list. Two year warranties required by the Contract Documents shall not commence until the date of Final Completion unless otherwise provided in the Contract. 2.4.2 Job placement of materials and equipment shall be made with a minimum of interference to County operations and personnel. 2.4.3 Furniture and portable office equipment in the immediate work area will be moved by Contractor and replaced to its original location. If the furniture and portable office equipment cannot be replaced to its original location, the County will designate new locations. If furniture and portable office equipment (or other items) must be moved and/or stored outside the immediate area, the County will compensate the Contractor for any such transportation and storage costs incurred. 2.4.4 Contractor shall take all precautions to ensure that no damage will result from its operations to private or public property. All damages shall be repaired or replaced by Contractor at no cost to the Owner. 2.4.5 Contractor shall be responsible for providing all necessary traffic control, such as street blockages, traffic cones, flagmen, etc., as required for each Job Order Purchase Order. Proposed traffic control methods shall be submitted to the County for approval. 2.5 Quality Assurance/Quality Control Program 2.5.1 Contractor shall submit, for County approval, a Quality Assurance/Quality Control Plan within fifteen (15) calendar days after issuance of the initial Job Order Purchase Order. This plan should address all aspects of quality control including responsibility for surveillance of work, documentation, trend analysis, corrective action and interface with County inspectors. 2.6 Utility Company Coordination 2.6.1 Unless specifically excluded by the individual Job Order Agreement, the Contractor will be responsible for coordinating with utility design work for permanent service to the project and will ensure that the work takes place in a timely manner and does not impact the project schedule. Any utility design fees for permanent services to a project will be paid by the County. 2.7 Temporary Sanitation Facilities 2.7.1 The Contractor shall provide ample toilet facilities with proper enclosures for the use of workmen employed on the work site. Toilet facilities shall be installed and maintained in conformity with all applicable state and local laws, codes, regulations and ordinances. They shall be properly lit and ventilated and kept clean at all times. 2.7.2 Adequate and satisfactory drinking water shall be provided at all times and under no circumstances and under no conditions will the use of common cups be permitted. The Contractor must supply sanitary drinking cups for the benefit of all employees. 2.8 Dust Control and Water 2.8.1 The dust control measures shall be in accordance with the requirements of the Pinal County Air Quality Control District Code of Regulations. Water or other approved dust palliative in sufficient quantities shall be applied during all phases of construction involving open earthwork to prevent unnecessary discharge of dust and dirt into the air. The Contractor shall be responsible for compliance with these regulations. A Notice to Proceed will not be issued until the County has received a copy of the Contractor’s Dust Control Permit and Plan. 2.8.2 The Contractor shall be required to obtain the necessary permit and all pertinent information from the Pinal County Air Quality Department 31 N Pinal St, Bldg. F, Florence, AZ 85132 520-866-6929. Statement of Work Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 6 of 37 2.8.3 The Contractor shall keep suitable equipment on hand at the job site for maintaining dust control on the project streets, and shall employ sufficient labor, materials and equipment for that purpose at all times during the project to the satisfaction of the County. 2.8.4 Watering shall conform to the provisions of Section 225 of the MAG Standard Specifications. The cost of watering will be included in the price bid for the construction operation to which such watering is incidental or appurtenant. 2.9 Work by Owner 2.9.1 The County reserves the right to undertake or award Contracts for the performance of the same or similar type work contemplated herein, and to do so will not breach or otherwise violate the contract. Definitions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 7 of 37 1. DEFINITIONS. For this Contract certain words, phrases and terms shall have special meaning as defined herein. Furthermore, words used in the present tense shall include the future; words used in the singular shall include the plural; words in the plural shall include the singular; and words in the neutral or masculine gender are inclusive and do not in any way connote a specific gender. 1.1 Bid Documents: The whole of the Invitation for Bid packet, which consists of all documents listed in the index of said bid packet and all Addenda thereto. 1.2 Bid Price: Total amount quoted by bidder for performing the Scope of Work described in the Bid Documents 1.3 Bid Form: The approved County form on which the bidder affixes an authorized signature certifying that the bidder has carefully reviewed the Scope of Work and is willing to perform said Scope of Work and furnish all labor, equipment and materials necessary to complete said Work for an amount not to exceed the bid price quoted. 1.4 Bid Security: A cashier’s check, certified check, or surety bond written by a surety holding a certificate of authority to transact surety business in Arizona, in the amount of ten percent (10%) of the total bid price to guarantee the bidder will enter into the contract if the bid is accepted and which is the agreed amount of liquidated damages in case of failure to enter into Contract or provide contract security. 1.5 Bidder: An individual, partnership, firm, corporation, or any acceptable combination thereof, or joint venture responding to an Invitation to Bid by submitting a signed Bid. 1.6 Board: Pinal County Board of Supervisors. 1.7 Calendar Days: A period of time meaning consecutive days including Saturdays, Sundays and holidays. 1.8 Change Order: Amendment of the Contract, Contract Documents or both, which is not effective until after approval by the Contractor and the Pinal County Board of Supervisors. Approval by the Board of Supervisors shall be in accordance with the provisions of paragraph 4 of the General Provisions of this contract. These changes include but are not limited to adding additional streets or roadway segments to the Scope of Work. 1.9 Channel: A natural or artificial watercourse. 1.10 Contract Administrator: Director of the Pinal County Department of Public Works, who reviews and approves recommendations for all contracts, change orders and pay estimates to the Board of Supervisors. 1.11 Contract Bonds/Contract Security (Performance Bond and Labor and Material Payment Bond): The approved forms of security, furnished by the successful bidder/contractor the Contractors surety or sureties, guaranteeing the full and complete performance of the contract and all supplemental agreements pertaining thereto and the payment of all legal debts including the payment of all taxes pertaining to the Scope of Work. 1.12 Contract/Contract Documents: The written instrument between Pinal and the contractor entitled “Contract Agreement” and the Bid Documents, as defined above, constitute the entire Contract/Contract Documents after (a) award of the Contract; (b) the successful bidder has furnished the required security and insurance and executed the Contract Agreement; (c) Pinal has accepted and approved the security; and (d) execution of the Contract Agreement by Pinal. 1.13 Contract Time: The number of calendar days allowed for completion of the Contract, including authorized time extensions. If a specified completion date is shown in lieu of the number of working or calendar days, the contract time expires on that date and the Contract shall be completed on or before that date or the date of any authorized extension. 1.14 Contractor: A bidder in whose favor the Pinal County Board of Supervisors has awarded the Contract and who has provided the necessary Contract security, met the required insurance requirements and entered into a contract agreement with Pinal. 1.15 County Engineer or Engineer: The Pinal County Engineer, acting by and under authority of the laws of the State of Arizona, or the County Engineer’s designee acting under the County Engineer’s supervision, on behalf of the Pinal county Board of Supervisors. 1.16 Culvert: Any structure not classified as a bridge which provides an opening under the roadway. Definitions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 8 of 37 1.17 Days: Calendar days (see above). 1.18 Department: The Pinal County Department of Public Works. 1.19 Director: The Pinal County Department of Public Works, acting in the official capacity as said Director. 1.20 Equipment: All machinery and equipment, together with the necessary supplies for upkeep and maintenance and also tools and apparatus necessary for acceptable completion of the Scope of Work. 1.21 Holidays: The legal holidays as defined in the latest revisions at the time of bidding, of the Arizona Revised Statutes, Title 1, Chapter 3, §1-301. 1.22 Laboratory: A testing laboratory that has been approved by Pinal to perform testing and that has been determined by Pinal to be free from any conflict of interest. 1.23 Labor and Material Payment Bond: A payment bond furnished by Contractor and Contractor’s surety or sureties for the full amount of the Bid Price to guarantee payment to laborers and material supplies. 1.24 Materials: Any substances specified for use in the construction of the Project. 1.25 Material Supplier: O ne who fabricates, or processes an item off the Project Site, and who may or may not delivery this to the Project Site. For purposes of this definition, a supplier shall not include one how establishes a fabricating process or facility expressly for use of the Project, whether on or off the Project Site; or one who performs work on the Project Site that is incorporated into the Project. 1.26 Notice of Award: Written notice to the successful bidder notifying that the bid has been accepted by the Pinal County Board of Supervisors. 1.27 Performance Bond: A bond in the full amount of the total Bid Price furnished by Contractor and Contractor’s surety sureties to protect Pinal by conditioning release of the bond sum upon Contractors full and complete performance of the Contract and all supplemental agreements thereto. 1.28 Plans: The project plans, standard drawings, working drawings and supplemental drawings, or reproductions thereof, approved by the Engineer, which show the location, character, dimensions and details of the Work to be performed. All such documents are to be considered as a part of the plans whether or not they are reproduced in the Invitation for Bid packet. 1.29 Progress Payment: Monthly draw against the contract price based on work completed and determined by the Schedule of Values and approved by the Engineer. 1.30 Project Plans: Specific details and dimensions peculiar to the Work which are supplemented by the Standard Drawings insofar as they may apply. 1.31 Purchase Order: A document which specifies, identifies and/or describes an item, service or supply delivery and/or transportation purchased by Pinal and includes a written note from Pinal to nay contractor or vendor of the start date and the Scope of Work. 1.32 Quality Assurance Inspector/QA Inspectors: The Engineer’s authorized representative assigned to make detailed inspections of contract performance. 1.33 Repetition of Expressions: In order to avoid cumbersome and needless repetition, such phrases as “to the Engineer” and “by the Engineer” shall be understood to mean that when an order, instruction, decision, exercise of judgement or other similar action is indicated, such order, instruction, decision, exercise of judgement or other similar action shall be issued, given, made by or reserved to the County Engineer. 1.34 Responsible Bidder: A person who has the capability to perform the contract requirements and the integrity and reliability which will assure good faith performance. 1.35 Responsive Bid: A bid which conforms to all material respects to the invitation for bid. Definitions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 9 of 37 1.36 Schedule of Performance: A timetable prepared by a bidder given a Notice of Award, to commence running upon Pinal’s issuance of a Notice to Proceed, defining the Bidder’s projection of significant milestones in the course of the performance of the Contract, as well as the number of days elapsed from the issuance of the Notice to Proceed to each such milestone. 1.37 Schedule of Values: Prices set by the Contractor for specified divisions of the Work. These prices shall be used to arrive at the amounts due under the contract on the progress payments. They shall include everything for that particular quantity of work which the Contractor expects to be paid, e.g. labor, material, overhead, profit. Equipment costs or rental, transportation. 1.38 Special Detour: A detour, which requires the contraction of a paved surface and generally does not include any portion of a route utilizing an existing roadway. 1.39 Shop Drawings: Drawings approved for repetitive use, showing details to be used where appropriate. 1.40 Specifications: The compilation of provisions and requirements for the performance of the prescribed Scope of Work, which include general, special and technical specifications. 1.41 Subcontractor: An individual, partnership, firm or corporation or any acceptable combination thereof, or joint venture, which performs any of the prescribed Scope of Work, directly or indirectly for or on behalf of Contractor whether or not in privity of contract with Contractor. 1.42 Superintendent: Contractor’s authorized representative in responsible charge of the Work. 1.43 Surety: The corporate body bound with and for Contractor, for the full and complete performance of the Contract and for payment of all debts pertaining to the Work. 1.44 Working Day: A calendar day, exclusive of Saturdays, Sundays, and County recognized holidays, on which weather and other conditions not under the control of Contractor shall permit Contractor’s operation to proceed for the major part of the day with the normal working force engaged in performing the controlling item or items of work which would be in progress at that time. 1.45 Working and Supplemental Drawings: Supplemental design sheets, shop drawings or similar data which Contractor is required to submit to Pinal. Special Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 10 of 37 1 INQUIRIES 1.1 All questions related to this Request for Proposal shall be directed to the Procurement Officer , Lorina Gillette, CPPB at lorina.gillette@pinalcountyaz.gov. Questions should be submitted in writing when time permits. Any correspondence related to a solicitation should refer to the appropriate solicitation number, page and paragraph number. 1.2 Responders may not contact any County employees other than the Procurement Officer concerning this procurement while the Solicitation and evaluation are in process. 2 OFFER PREPARATION 2.1 Contract. Offers shall include a signed Contract form. The Contract Form shall be signed with an original signature by the person signing the Offer, and shall be submitted no later than the Offer due date and time. Failure to return the Contract Form may result in rejection of the Offer. 2.2 Acknowledgement of Solicitation Addendums. Offers shall include any/all signed Solicitation Addendum(s), as described in section 2.7 of the Uniform Instructions. Solicitation Addendums are posted on the Pinal County website at the following address: http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx. It is the responsibility of the Responder to periodically check this website for any Solicitation Addendum. Solicitation Addendums shall be signed with an original signature by the person signing the Offer, and shall be submitted no later than the Offer due date and time. Failure to return a signed (or acknowledgment for electronic submission, when authorized) copy of a Solicitation Addendum may result in rejection of the Offer. 2.3 Estimated Quantities. The County does not anticipate considerable activity under contract(s) awarded as a result of this solicitation, therefore, no commitment of any kind is made concerning quantities actually acquired. The quantities that may be reflected in the solicitation are estimates only. 2.4 Offer Format. Offers shall follow the following format: The original copy of the Offer shall be clearly labeled “ORIGINAL” and shall contain a Title Page that identifies the solicitation number and provides the Responder Name, Address, Telephone Number as well as the Name and Title of the Solicitation Contact Person. The Offer shall be organized into two (2) sections as follows: 2.4.1 Requested Documents. 2.4.1.1 Section One: shall contain the Title Page as well as the following forms: Statement of Bonding Capacity, Addendum Acknowledgement Form, W9 form and signed Offer and Acceptance Form 2.4.1.2 Section Two: shall contain the Subcontractor Selection Plan 2.4.1.3 Section Three: shall contain scanned copies of the Arizona Registrar of Contractors License Identification Card(s). Multiple ID cards by be placed on the same page. 2.4.1.4 Section Four: shall contain the Pricing Matrix. 2.4.2 Requested Questionnaires. 2.4.2.1 Shall contain the completed questionnaire titled JOC Civil Construction Services. 2.6 Additional Special Instructions. Responders shall see the attachments within the Solicitation for Additional Special Instructions associated with this Solicitation. 2.7 Additional Terms and Conditions. Responders shall see the attachments within the Solicitation for Additional Terms and Conditions. 3 SUBMISSION OF OFFER Special Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 11 of 37 3.1 Electronic Documents. The Solicitation document is provided in an electronic format. Any unidentified alteration or modification to any Solicitation documents, to any attachments, exhibits, forms, charts or illu strations contained herein shall be null and void. In those instances where modifications are identified, the original document published by the County shall take precedence. As provided in the Solicitation Instructions, Responders are responsible for clearly identifying any and all changes or modifications to any Solicitation documents upon submission to the County. 4 EVALUATION 4.1 Evaluation. In accordance with the Pinal County Procurement Code, awards shall be made to the responsible responder(s) whose proposal is determined in writing to be the most advantageous to the County based upon the evaluation criteria listed below. The evaluation factors are listed in their relative order of importance. 1. Method of Approach 2. Experience and Qualifications of the Contractor 3. Experience and Qualifications of Key Personnel 4. Conformance to Terms and Conditions 4.2 Clarifications. Upon receipt and opening of proposals submitted in response to this solicitation, the County may request oral or written clarifications, including demonstrations or questions and answers, for the sole purpose of information gathering or of eliminating minor informalities or correcting nonjudgmental mistakes in proposals. Clarifications shall not otherwise afford the Responders the opportunity to alter or change its proposal. 4.3 Negotiations. County may conduct negotiations with those Responders who’s Offers are determined by the County to be reasonably susceptible of being selected for award. Negotiations may be in writing or in person and may include presentations, site visits or demonstrations. 4.4 Responsibility, Responsiveness and Acceptability. In accordance with Pinal County Procurement Code PC1-328(H), County shall consider the following in determining Responder responsibility as well as the responsiveness and acceptability of their Offer. Responders may not be considered responsible if they have been debarred from the practice of their profession that would otherwise be necessary in the provision of goods and services under any resulting contract. Responders may not be considered responsible if they have had a contract with the County, within the last three-years, that was terminated for cause, due to breach or similar failure to comply with the terms of any such contract. Responders may also not be considered responsible if there is factual evidence of their frequent and reoccurring failure to satisfy the terms of their agreements and contractual relationships, both with the County or other government entities. Factual evidence shall consist of any documented vendor performance reports, customer complaints and/or negative references (including those found outside of the submittal). Other factors that the County may evaluate to determine responsibility include, but are not limited to excessively high or low pricing, compliance with applicable laws, and financial capacity to perform as specified. The County reserves the right to review the qualifications of any key personnel to be assigned to provide services. Offers may not be considered responsive and/or acceptable if they do not contain information sufficient to evaluate the Offer in accordance with the evaluation criteria identified in the Solicitation including (i) a completed Offer and Acceptance Form; (ii) completed Solicitation Addendums acknowledging any/all changes to the Solicitation; (iii) a response to the County’s Statement of Work, (iv) a price proposal; or (iv) other certifications or bond sureties required in the Solicitation. 4.5 Best and Final Offers. If negotiations are conducted, the County shall issue a written request for a Best and Final Offer. The request shall set forth the date, time and place for the submission of the Best and Final Offer. Best and Final Offers shall be requested only once, unless the County makes a determination that it is advantageous to conduct further negotiations or change the solicitation requirements. 5 AWARD 5.1 Contract Document Consolidation. At its sole option, following any contract award(s) the County may consolidate the resulting contract documents. Examples of such consolidation would include (i) reorganizing solicitation documents and components of the Contractor’s Offer only pertaining to the Solicitation; (ii) revising the Statement of Work to incorporate the Contractor’s response, (iii) revising any terms and conditions to incorporate any changes in the Contractor’s Offer; (iv) excluding any Special Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 12 of 37 components of the Contractor’s Offer that were not awarded. Contract document consolidation shall not materially change the Contract. 5.2 Post Award Meeting. The Contractor may be required to attend a post-award meeting with the Using Agency to discuss the terms and conditions of this Contract. This meeting will be coordinated by the Procurement Officer of the Contract. Uniform Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 13 of 37 1 INQUIRIES 1.1 Duty to Examine. It is the responsibility of each Responder to examine the entire Solicitation, seek clarification in writing (inquiries), and examine its’ Offer for accuracy before submitting the Offer. Lack of care in pr eparing an Offer shall not be grounds for modifying or withdrawing the Offer after the Offer due date and time, nor shall it give rise to any Contract claim. 1.2 Solicitation Contact Person. Any inquiry related to a Solicitation, including any requests for or inquiries regarding standards referenced in the Solicitation shall be directed solely to the Solicitation contact person. The Responder shall not contact or direct inquiries concerning this Solicitation to any other County employee unless the Solicitation specifically identifies a person other than the Solicitation contact person as a contact. 1.3 Submission of Inquiries . The Procurement Officer or the person identified in the Solicitation as the contact for inquiries except at the Pre-Offer Conference, require that an inquiry be submitted in writing. Any inquiry related to a Solicitation shall refer to the appropriate Solicitation number, page and paragraph. Do not place the Solicitation number on the outside of the envelope containing that inquiry, since it may then be identified as an Offer and not be opened until after the Offer due date and time. The County shall consider the relevancy of the inquiry but is not required to respond in writing. 1.4 Timeliness. Any inquiry or exception to the solicitation shall be submitted as soon as possible and should be submitted at least seven days before the Offer due date and time for review and determination by the County. Failure to do so may result i n the inquiry not being considered for a Solicitation Addendum. 1.5 No Right to Rely on Verbal Responses. A responder shall not rely on verbal responses to inquiries. A verbal reply to an inquiry does not constitute a modification of the solicitation. 1.6 Solicitation Addendum. The Solicitation shall only be modified by a Solicitation Addendum. 1.7 Pre-Offer Conference. If a pre-Offer conference has been scheduled under this Solicitation, the date, time and location shall appear on the Solicitation cover sheet or elsewhere in the Solicitation. Responders should raise any questions about the Solicitation or the procurement at that time. A Responder may not rely on any verbal responses to questions at the conference. Material issues raised at the conference that result in changes to the Solicitation shall be answered solely through a written Solicitation Addendum. 1.8 Persons with Disabilities. Persons with a disability may request a reasonable accommodation, such as a sign language interpreter, by contacting the Solicitation contact person. Requests shall be made as early as possible to allow time to arrange the accommodation. 2 OFFER PREPARATION 2.1 Forms: No Facsimile, Telegraphic or Electronic Mail Offers. An Offer shall only be submitted through Pinal County’s web portal, Bonfire. Any substitute document for the forms provided in this Solicitation must be legible and contain the same information requested on the forms, unless the solicitation indicates otherwise. A facsimile or electronic mail (e-mail) Offer shall be rejected if submitted in response to requests for proposals or invitations for bids. 2.2 Typed or Ink; Corrections. The Offer shall be typed or in ink. Erasures, interlineations or other modifications in the Offer shall be initialed in ink by the person signing the Offer. Modifications shall not be permitted after Offers have been opened except as otherwise provided under applicable law. 2.3 Evidence of Intent to be Bound. The Offer and Acceptance form within the Solicitation shall be submitted with the Offer and shall include a signature (or acknowledgement for electronic submissions, when authorized) by a person authorized to sign the Offer. The signature shall signify the Responder’s intent to be bound by the Offer and the terms of the Solicitation and that the information provided is true, accurate and complete. Failure to submit verifiable evidence of an intent to be bound, such as an original signature, shall result in rejection of the Offer. 2.4 Exceptions to Terms and Conditions. All exceptions included with the Offer shall be submitted in a clearly identified separate section of the Offer in which the Responder clearly identifies the specific paragraphs of the Solicitation where the exceptio ns occur. Any exceptions not included in such a section shall be without force and effect in any resulting Contract unless such exception is specifically accepted by the Procurement Officer in a written statement. The Responder’s preprinted or standard terms will not be considered by the County as a part of any resulting Contract. 2.4.1 Invitation for Bids. An Offer that takes exception to a material requirement of any part of the Solicitation, including terms and conditions, shall be rejected. Uniform Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 14 of 37 2.4.2 Request for Proposals. All exceptions that are contained in the Offer may negatively affect the County’s proposal evaluation based on the evaluation criteria stated in the Solicitation or result in rejection of the Offer. An offer that takes exception to any material requirement of the solicitation may be rejected. 2.5 Subcontracts. Responder shall clearly list any proposed subcontractors and the subcontractor’s proposed responsibilities in the Offer. 2.6 Cost of Offer Preparation. The County will not reimburse any Responder the cost of responding to a Solicitation. 2.7 Solicitation Addendum. Each Solicitation Addendum shall be signed with an original signature by the person signing the Offer, and shall be submitted no later than the Offer due date and time. Failure to return a signed copy of a Solicitation Addendum may result in rejection of the Offer. 2.8 Federal Excise Tax. The County is exempt from certain Federal Excise Tax on manufactured goods. Exemption Certificates will be provided by the County. 2.9 Provision of Tax Identification Numbers. Responders are required to provide their Arizona Transaction Privilege Tax Number and/or Federal Tax Identification number by attaching a current W-9 Form. 2.9.1 Employee Identification. Responder agrees to provide an employee identification number or social security number to the County for the purposes of reporting to appropriate taxing authorities, monies paid by the Department under this contract. If the federal identifier of the responder is a social security number, this number is being requested solely for tax reporting purposes and will be shared only with appropriate County and federal officials. This submission is mandatory under 26 U.S.C. § 6041A. 2.10 Identification of Taxes in Offer. The County is subject to all applicable state and local transaction privilege taxes. All applicable taxes shall be included in the pricing offered in the solicitation. At all times, payment of taxes and the determination of applicable taxes are the sole responsibility of the contractor. 2.11 Disclosure. If the firm, business or person submitting this Offer has been debarred, suspended or otherwise lawfully precluded from participating in any public procurement activity, including being disapproved as a subcontractor with any Federal, state or local government, or if any such preclusion from participation from any public procurement activity is currently pending, the Responder shall fully explain the circumstances relating to the preclusion or proposed preclusion in the Offer. The Responder shall include a letter with its Offer setting forth the name and address of the governmental unit, the effective date of this suspension or debarment, the duration of the suspension or debarment, and the relevant circumstances relating to the suspension or debarment. If suspension or debarment is currently pending, a detailed description of all relevant circumstances including the details enumerated above shall be provided. 2.12 Solicitation Order of Precedence. In the event of a conflict in the provisions of this Solicitation, the following shall prevail in the order set forth below: 2.12.1 Terms and Conditions; 2.12.2 Statement or Scope of Work; 2.12.3 Specifications; 2.12.4 Attachments; 2.12.5 Exhibits; 2.12.6 Special Instructions to Responders; 2.12.7 Uniform Instructions to Responders; 2.12.8 Other documents referenced or included in the Solicitation; and 2.12.9 Individual Job Order Assignment 2.13 Delivery. Unless stated otherwise in the Solicitation, all prices shall be F.O.B. Destination and shall include all freight, delivery and unloading at the destination(s). 2.14. Federal Immigration and Nationality Act. By signing of the Offer, the Responder warrants that both it and all proposed subcontractors are in compliance with federal immigration laws and regulations (FINA) relating to the immigration status of their employees. The State may, at its sole discretion require evidence of compliance during the evaluation process. Should the State request evidence of compliance, the Responder shall have 5 days from receipt of the request to supply adequate Uniform Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 15 of 37 information. Failure to comply with this instruction or failure to supply requested information within the timeframe specified shall result in the offer not being considered for contract award. 2.15. Offshore Performance of Work Prohibited Any services that are described in the specifications or scope of work that directly serve the State of Arizona or its clients and involve access to secure or sensitive data or personal client data shall be performed within the defined territories of the United States. Unless specifically stated otherwise in the specifications, this paragraph does not apply to indirect or 'overhead' services, redundant back-up services or services that are incidental to the performance of the contract. This provision applies to work performed by subcontractors at all tiers. Responders shall declare all anticipated offshore services in the proposal. 3 SUBMISSION OF OFFER 3.1 Online Offer Submission. Each offer shall be submitted through Pinal County’s web portal, Bonfire. Requested Information Name Type # Files Requirement Instructions Section 1: Cover Sheet, Statement of Bonding Capacity, Addendum Acknowledgement Form, W9, Offer & Acceptance Form File Type: Any Multiple Required Section 2: Subcontractor Selection Plan File Type: Any Multiple Required Section 3: Scanned copies of Arizona Registrar of Contractors License Identification Card(s) File Type: Any Multiple Required JOC Asphalt Maintenance & Repair Services (Q-13MO) Questionnaire: Excel (.xlsx) 1 Required You will need to fill out the provided Response Template for this Questionnaire. The Response Template can be downloaded from the project listing on the Bonfire portal. Asphalt Maintenance & Repair Services (BT-05AQ) BidTable: Excel (.xlsx) 1 Required You will need to fill out the provided Response Template for this BidTable. The Response Template can be downloaded from the project listing on the Bonfire portal. Upload your submission at: https://pinalcountyaz.bonfirehub.com/opportunities/7907 Uniform Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 16 of 37 3.2 Offer Due Date. The exact due date and time that offers are due as stated on the Solicitation cover page. 3.3 Offer Amendment or Withdrawal. An Offer may not be amended or withdrawn after the Offer due date and time except as otherwise provided under applicable law. 3.4 Public Record. All Offers submitted and opened are public records and must be retained by the County. Offers shall be open to public inspection after Contract award, except for such Offers deemed to be confidential by the County. If a Responder believes that information in its Offer should remain confidential, it shall indicate as confidential the specific information and submit a statement with its Offer detailing the reasons that the information should not be disclosed. Such reasons shall include the specific harm or prejudice which may arise. The County shall determine whether the identified information is confidential pursuant to the Pinal County Procurement Code. 3.5 Non-collusion, Employment, and Services (Certification). By signing the Offer and Acceptance Form or other official contract form, the Responder certifies that: 3.5.1 The Responder did not engage in collusion or other anti-competitive practices in connection with the preparation or submission of its Offer; and 3.5.2 The Responder does not discriminate against any employee or applicant for employment or person to whom it provides services because of race, color, religion, sex, national origin, or disability, and that it complies with all applicable Federal, state and local laws and executive orders regarding employment. 3.6 Gratuities Prohibited/Integrity of Offers. The Responder affirms they have not given, nor intend to give at any time hereafter any economic opportunity, future employment, gift, loan gratuity, special discount, trip, favor or service to any employee of Pinal County in connection with the submitted Bid or Proposal. After award, the County may cancel this contract by giving written notice to the Contractor if it is found that any gratuity, gift or other prohibited item were offered or given to any County officer or employee. In the event the County cancels this contract pursuant to this provision, they shall be entitled, in addition to any other rights and remedies, to recover or withhold from the Responder the amount of the gratuity. 3.7 Lobbying Prohibited. Responders are hereby advised that lobbying is not permitted with any County personnel or members of the Board of Supervisors related to or involved with this Solicitation until the recommendation for award has been posted in the Procurement Office. 4 EVALUATION 4.1 Unit Price Prevails. In the case of discrepancy between the unit price or rate and the extension of that unit price or rate, the unit price or rate shall govern. 4.2 Taxes. If the products and/or services specified require transaction privilege or use taxes, they shall be described and itemized separately on the offer. Arizona transaction privilege and use taxes shall not be considered for evaluation. 4.3 Prompt Payment Discount. Prompt payment discounts of thirty (30) days or more set forth in an Offer shall be deducted from the offer for the purposes of evaluating that price. 4.4 Late Offers. An Offer submitted after the exact Offer due date and time shall be rejected. 4.5 Disqualification. A Responder (including each of it’s’ principals) who is currently debarred, suspended or otherwise lawfully prohibited from any public procurement activity shall have its offer rejected. 4.6 Offer Acceptance Period. A Responder submitting an Offer under this Solicitation shall hold its Offer open for the number of days from the Offer due date that is stated in the Solicitation. If the Solicitation does not specifically state a number of days for Offer acceptance, the number of days shall be one hundred-twenty (120). If a Best and Final Offer is requested pursuant to a Request for Proposals, a Responder shall hold its Offer open for one hundred twenty (120) days from the Best and Final Offer due date. 4.7 Waiver and Rejection Rights. Notwithstanding any other provision of the Solicitation, the County reserves the right to: 4.7.1 Waive any minor informality; 4.7.2 Reject any and all Offers or portions thereof; or 4.7.3 Cancel the Solicitation. Uniform Instructions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 17 of 37 5 AWARD 5.1 Number or Types of Awards. The County reserves the right to make multiple awards or to award a Contract by individual line items or alternatives, by group of line items or alternatives, or to make an aggregate award, or regional awards, whichever is most advantageous to the County. If the Procurement Officer determines that an aggregate award to one Responder is not in the County’s best interest, “all or none” Offers shall be rejected. 5.2 Contract Inception. An Offer does not constitute a Contract nor does it confer any rights on the Responder to the award of a Contract. A Contract is not created until the Offer is accepted in writing by the Board of Supervisors, County Manager, Chief Financial Officer, or their designee’s signature on the Offer and Acceptance Form. A notice of award or of the intent to award shall not constitute acceptance of the Offer. 5.3 Effective Date. Th e effective date of this Contract shall be the date that the Board of Supervisors, County Manager, Chief Financial Officer, or their designee signs the Offer and Acceptance form or other official contract form, unless another date is specifically stated in the Contract or Contract Award. 6. Protests 6.1 Protests. A protest shall comply with and be resolved according to the Pinal County Procurement Code Article 9 and rules adopted thereunder. Protests shall be in writing and be filed with both the Procurement Officer of the purchasing agency and with the Finance Director. A protest of a Solicitation shall be received by the Procurement Officer before the Offer due date. A protest of a proposed award or of an award shall be filed within ten (10) days after contract award. A protest shall include: 6.1.1 The name, address and telephone number of the protester; 6.1.2 The signature of the protester or its representative; 6.1.3 Identification of the purchasing agency and the Solicitation or Contract number; 6.1.4 A detailed statement of the legal and factual grounds of the protest including copies of relevant documents; and 6.1.5 The form of relief requested. Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 18 of 37 1. Statement of Work The Contractor, under the general supervision of the County, shall perform services as are necessary for the Work Assignment and according to the directions and designated standards of the County, and in accordance with the Statement of Work. It is understood and agreed that the County’s authorized representative shall be the Department of Public Works Director or his/her duly authorized representative, hereinafter called the “Agent”. For purposes of this contract, the Agent’s duly authorized representative shall be the Project Manager and he/she shall be the sole contact for administering this contract. Contractor shall provide services, and complete in a workmanlike and substantial manner and to the satisfaction of the Department of Public Works Director, Job Order assignments for the County, and furnish at its own cost and expense all necessary machinery, equipment, tools, apparatus, and labor to complete the work in the most substantial and workmanlike manner according to the Specifications and Work Assignment on file with the County and such modifications of the same and other directions that may be made by the County as provided herein. The Contractor shall meet periodically wi th the County Agent so as to keep the County informed of the progress of the work in accordance with each work assignment. 2. Contract Documents: 2.1 The Contract Documents. (Plans, Specifications, Addenda, if any, Affidavits, Performance Bond, Payment Bond, Certificates of Insurance and Change Orders, if any) are by this reference made a part of this Contract and shall have the same effect as though all of the same were fully inserted herein. 2.2 Contract Document Consolidation. At its sole option, following any contract award(s) the County may consolidate the resulting contract documents. Examples of such consolidation would include (i) reorganizing solicitation documents and components of the Contractor’s Offer only pertaining to the Solicitation; (ii) revising the Statement of Work to incorporate the Contractor’s response, (iii) revising any terms and conditions to incorporate any changes in the Contractor’s Offer; (iv) excluding any components of the Contractor’s Offer that were not awarded. Contract document consolidation shall not materially change the Contract. 3. Time of Completion: Contractor further covenants and agrees at its own proper cost and expense, to complete all work for the construction of assigned Job Orders and to completely construct the same and provide the services therein, as called for by this agreement free and clear of all claims, liens, and charges whatsoever, in the manner and under the conditions specified within the time, or times, stated in the Work Assignment. 4. Contract Term, Extension, Price Adjustment: The term of any resultant contract will commence on the date of award and will continue for one year unless canceled, termina ted or extended as otherwise provided herein. The contract shall no bind nor purport to bind, the County for any contractual commitment in excess of the original contract period. The County shall have the sole option to extend the contract for four (4) additional one (1) year periods or a portion thereof. If the County exercises such rights, all terms, conditions and provisions of the original contract shall remain in the same and apply during the extension period. The Procurement Officer may review a fully documented request for a price increase only after the Contract has been in effect for two years. Any requested increase(s) shall be based on an unmitigateble cost increase to the Contractor that was clearly unpredictable at the time of the Offer and is directly correlated the cost of the goods or services contractually covered. A price increase adjustment shall only be considered at the time of a contract extension and shall be a factor in the extension review process. Requests for adjustment must be received by the Procurement Officer 120 days prior to contract renewal. The County shall have the right to request and receive additional information, statistics, financial records etc., and to direct the content, form and format of the presentation as it deems necessary to validate the Contractor’s request for a price adjustment. Failure to respond to the County’s request within the time frame specified shall nullify the Contractor’s request. The County shall determine whether the requested price increase is in its best interest and adjustments shall be subject to availability of monies appro priated. Price reductions may be submitted to or requested by the County for consideration at any time during the Contract period. The County, at its own discretion may accept a price reduction. Price reductions will become effective upon acceptance by the Department. Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 19 of 37 The price increase adjustment, if approved, will be effective upon the date of the contract extension. Price reductions will become effective upon acceptance by the County. 5. Eligible Agencies (Cooperative Usage): This contract shall be for the permissive use by Pinal County. The County has entered into various purchasing agreements with other Arizona government entities in order to conserve resources, reduce overhead and purchase costs and improve delivery time. The contract resulting from this Solicitation may be extended for use by other municipalities, school districts and government agencies in the State of Arizona with the approval of the Contractor. Orders placed by other agencies and payment thereof will be the sole responsibility of that agency. The County shall not be responsible for any disputes arising out of transactions made by others. 6. Payments: 6.1 Compensation. As full consideration for the satisfactory performance by the Contractor of Work prescribed under the Contract, the County shall pay Contractor the amounts specified in the individual Job Orders. 6.2 Invoices. Contractor shall submit invoices to: Pinal County Finance Department PO Box 1348 OR FinanceInvoices@pinalcountyaz.gov Florence, AZ 85132 6.3 Job Order Cost Proposal Structure. For each Job Order, the Contractor shall prepare a Job Order Cost Proposal with the sufficient level of cost detail as required by the County. Cost detail may include, but is not limited to: schedule of values, work schedule, direct labor cost and fringe benefits, direct material costs (supported by quotes), direct equipment costs (supported by quotes), cost of subcontractors (supported by quotes), and allowable indirect costs (includes insurance). The Contractor shall utilize the markups established in the JOC Bid Table to calculate the overhead and profit for all Job Order Cost Proposals, unless otherwise requested by the County. Profit on subcontractors/subconsultants shall not exceed 5 percent. 6.4 Progress Payments. Should an individual Job Order require more than thirty (30) days to complete, The County shall make progress payments monthly as the Work proceeds, or at more frequent intervals as determined by the County, on estimates of Work completed submitted by the Contractor and approved by the County. Contractor shall use an acceptable invoice from and shall include supporting documents to reflect a breakdown of the total price showing the amount included therein for each principal category of the Work, in such detail as requested, to provide a basis for determining progress payments. In the estimation of Work completed, the County will authorize payment for material delivered on the site and preparatory work done if Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform the Work. 6.5 Owner’s Property. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the County. But this provision shall not be construed as: 6.5.1 Relieving the Contractor from the sole responsibility for all material and Work upon which payments have been made or the restoration of any damaged Work; or 6.5.2 Waiving the right of the County to require the fulfillment of all the terms of the Contract. 6.6 Approval and Certification. An estimate of the Work submitted shall be deemed approved and certified for payment after seven days from the date of submission unless before that time the County or the County’s agent prepares and issues a specific written finding setting forth those items in detail in the estimate of the Work that are not approved for payment under this contract. The County may withhold an amount from the progress payment sufficient to pay the expenses the County reasonably expects to incur in correcting the deficiency set forth in the written finding. The progress payment shall be paid on or before thirty days after the estimate of the Work is certified and approved. The estimate of the Work shall be deemed received by the County on submission to any person designated by the County for the submission, review or approval of the estimate of the Work. 6.7 Unpaid Amounts. The County shall pay all unpaid amounts due the Contractor under this Contract within thirty (30) days, after: 6.7.1 Completion and acceptance of the Work; Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 20 of 37 6.7.2 Presentation of a properly executed invoice; 6.7.3 Presentation of a fully executed Certificate of Performance provided by the County; or 6.7.4 Consent of Contractor’s surety, if any. 7. Termination: The County hereby gives notice that pursuant to A.R.S. § 38-511 A, this contract may be canceled without penalty or further obligation within three years after execution if any person significantly involved in initiation, negotiation, securing, drafting or creating the contract on behalf of the County is, at any time while the contract or any extension of the contract is in effect, an employee or agent of any other party to the contract in any capacity or a Contractor to any other party of the contract with respect to the subject matter of the contract. Cancellation under this section shall be effective when written notice from the Public Works Director of the County is received by all of the parties to the contract. In addition, the County may recoup any fee or comm ission paid or due to any person significantly involved in initiation, negotiation, securing, drafting or creating the contract on behalf of the County from any other party to the contract arising as a result of the contract. 8. Negotiation Clause: Recovery of damages related to expenses incurred by Contractor for a delay for which the County is responsible, which is unreasonable under the circumstances and which was not within the contemplation of the parties to the contract, shall be negotiated between Contractor and the County. This provision shall be construed so as to give full effect to any provision in the contract, which requires notice of delays, provides for arbitration or other procedure for settlement or provides for liquidated damages. 9. Compliance with Laws: Contractor is required to comply with all Federal, State and local ordinances and regulations. Contractor’s signature on this contract certifies compliance with the provisions of the I-9 requirements of the Immigration Reform Control Act of 1986 for all personnel that Contractor and any subcontractors employ to complete this project. It is understood that the County shall conduct itself in accordance with the provisions of the Pinal County Procurement Code. 10. Anti -Discrimination Provision: The Contractor shall comply with State of Arizona Executive Order No. 2009-9 and all other applicable Federal and State laws, rules and regulations, including the Americans with Disabilities Act. 11. Indemnification: To the fullest extent permitted by law, Contractor shall indemnify and hold harmless Pinal, its agents, representatives, officers, directors, officials and employees, from any and all liability, demands, proceedings, suits, actions, claims, losses, costs and damages of every kind and description, arising out of, resulting from or alleged to have resulted from the performance of the Work. Contractor’s duty to indemnify and hold harmless Pinal, its agents, representatives, officers, directors, officials an d employees shall arise in connection with all demands, proceedings, suits, actions, claims, workers’ compensation claims, unemployment claims or employee’s liability claims, damages, losses or expenses (including but not limited to attorney’s fees, court costs and/or arbitration costs and the cost of appellate proceedings) that are attributable to personal or bodily injury, sickness, disease, death or injury to, impairment or destruction of property including loss of use resulting there from, caus ed by or contributed to, in whole or in part, by any negligence, recklessness or intentional wrongful conduct, whether active or passive, of Contractor, its employees, agents, representatives, any tier of Contractor’s subcontractors, their employees, agents or representatives or anyone directly or indirectly employed by Contractor or its subcontractors or anyone for whose acts Contractor or its subcontractor’s may be liable. The amount and type of insurance coverage requirements set forth in the Contract Documents or remuneration of any insurance coverage herein provided shall in no way be construed as limiting the scope of the indemnity in this paragraph. Such indemnity shall be required by Contractor from its subcontractors on behalf of Pinal. 12. Insurance Requirements: Contractor, at Contractor’s own expense, shall purchase and maintain the herein stipulated minimum insurance from a company or companies duly licensed by the State of Arizona and possessing a current A.M. Best, Inc. rating of B++6. In lieu of State of Arizona licensing, the stipulated insurance may be purchased from a company or companies, which are authorized to do Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 21 of 37 business in the State of Arizona, provided that said insurance companies meet the approval of County. The form of any insurance policies and forms must be acceptable to County. All insurance required herein shall be maintained in full force and effect until all work or service required to be performed under the terms of the Contract is satisfactorily completed and formally accepted. Failure to do so may, at the sole discretion of County, constitute a material breach of this Contract. Contractor’s insurance shall be primary insurance as respects County, and any insurance or self-insurance maintained by County shall not contribute to it. Any failure to comply with the claim reporting provisions of the insurance policies or any breach of an insurance policy warr anty shall not affect the County’s right to coverage afforded under the insurance policies. The insurance policies may provide coverage that contains deductibles or self-insured retentions. Such deductible and/or self- insured retentions shall not be applicable with respect to the coverage provided to County under such policies. Contractor shall be solely responsible for the deductible and/or self-insured retention and County, at its option, may require Contractor to secure payment of such deductibles or self-insured retentions by a surety bond or an irrevocable and unconditional letter of credit. County reserves the right to request and to receive, within 10 working days, certified copies of any or all of the herein required insurance policies and/or endorsements. County shall not be obligated, however, to review such policies and/or endorsements or to advise Contractor of any deficiencies in such policies and endorsements, and such receipt shall not relieve Contractor from, or be deemed a waiver of County’s right to insist on strict fulfillment of Contractor’s obligations under this Contract. The insurance policies required by this Contract, except Worker’s Compensation, and Errors and Omissions, shall name County, its agents, representatives, officers, directors, officials and employees as Additional Insureds. The policies required hereunder, except Workers’ Compensation, and Errors and Omissions, shall contain a waiver of transfer of rights of recovery (subrogation) against County, its agents, representatives, officers, directors, officials, and employees for any claims arising out of Contractor’s work or service. Contractor is required to procure and maintain the following coverages indicated by a checkmark: Commercial General Liability Commercial General Liability insurance and, if necessary, Commercial Umbrella insurance with a limit of not less than $1,000,000 for each occurrence, $2,000,000 Products/Completed Operations Aggregate and $2,000,000 General Aggregate Limit. The policy shall include coverage for bodily injury, broad form property damage, personal injury, products and completed operations and blanket contractual coverage, and shall not contain any provision which would serve to limit third party action over claims. There shall be no endorsement or modification of the CGL limiting the scope of coverage for liability arising from explosion, collapse or underground property damage. Automobile Liability Commercial/Business Automobile Liability insurance and, if necessary, Commercial Umbrella insurance with a combined single limit for bodily injury and property damage of not less than $1,000,000 each occurrence with respect to any of the Contractor’s owned, hired and non-owned vehicles assigned to or used in performance of the Contractor’s work or services under this Contract. Workers’ Compensation Workers’ Compensation insurance to cover obligations imposed by federal and state statutes having jurisdiction of Contractor’s employees engaged in the performance of the work or services under this Contract; and Employer’s Liability insurance of not less than $1,000,000 for each accident, $1,000,000 disease for each employee, and $1,000,000 disease policy limit. Contractor waives all rights against County and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the Workers’ Compensation and Employer’s Liability or commercial umbrella liability insurance obtained by Contractor pursuant to this agreement. Certificates of Insurance Prior to commencing work or services under this Contract, Contractor shall furnish County with Certificates of Insurance in a form acceptable to County, or formal endorsements as required by the Contract in the form provided by the County, issued by Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 22 of 37 Contractor’s insurer(s), as evidence that policies providing the required coverages, conditions and limits required by this Contract are in full force and effect. Such certificates shall identify this contract number and title. In the event any insurance policy(ies) required by this contract is(are) written on a “claims made” basis, coverage shall extend for two years past completion and acceptance of Contractor’s work or services and as evidenced by annual Certificates of Insurance. If a policy does expire during the life of the Contract, a renewal certificate must be sent to County fifteen (15) days prior to the expiration date. Cancellation and Expiration Notice Insurance required herein shall not expire, be canceled, or materially changed without thirty (30) days prior written notice to County. 13. Israel Boycott Prohibited: Contractor hereby certifies to Pinal County as follows: that it is not currently engaged in, and agrees for the duration of this Contract to not engage in, a boycott of Israel pursuant to A.R.S. § 35-393.01(A). Further that a breach of this Certification shall constitute a material breach of this Contract that is subject to penalties up to and including termination of this Contract and that Pinal County retains the legal right to inspect the records of Contractor to ensure compliance with this Certification. 14. Performance of Work: 14.1 Job Order Agreement . Performance of the Work shall be undertaken only upon the issuance of written Job Order Purchas Orders by the County. Job Orders shall be in accordance with the requirements specified in the Statement of Work and shall set forth, with the necessary particularity, the following: 14.1.1 Contract number along with the Job Order Contractor’s name; 14.1.2 Job Order number and date; 14.1.3 The agreed Work and applicable technical specifications and drawings; 14.1.4 The agreed period of performance and, if required by the County, a work schedule; 14.1.5 The place of performance; 14.1.6 The agreed total price for the Work to be performed; 14.1.7 Submittal requirements; 14.1.8 The County’s authorized representative who will accept the completed Work; 14.1.9 Signatures by parties hereto signifying agreement with the specific terms of the Job Order; and 14.1.10 Such other information as may be necessary to perform the Work. 14.2 Job Order Contractor Duties and Obligations. 14.2.1 Permits & Responsibilities. Job Order Contractor shall be responsible for processing of drawings for approval by appropriate oversight bodies; for obtaining any necessary licenses and permits; and for complying with any Federal, State and municipal laws, codes and regulations applicable to the performance of the Work. The County will reimburse Contractor for the actual, documented costs of construction permits required for the performance of the Work. Contractor shall also be responsible for all damages to persons or property that occur as a result of Contractor’s fault or negligence, and shall take proper safety and health precautions to protect the Work, the workers, the public, and the property of others. Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire Work, except for any completed unit of Work which may have been accepted under the Contract. 14.2.2 Self -Performance by the Job Order Contractor. The Job Order Contractor shall be allowed to bid as a subcontractor for work over $50,000 and if it is the lowest acceptable bidder. Any change orders for self -performed work shall require pre-approval by the County. 14.2.3 Jobsite Superintendent. During performance of a Job Order and until the Work is completed and accepted, Contractor shall directly superintend the Work or assign a competent superintendent who will Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 23 of 37 supervise the performance of Work and is satisfactory to the County and has authority to act for Contractor. Contractor will ensure that the site supervisor for the project is English proficient and that there is at least one English proficient person at the construction site at all times work is being performed in order to communicate with the County’s project manager. 14.2.4 Construction Layout. Contractor shall lay out its work in accordance with the Contract plans and specifications and shall be responsible for all measurements in connection with the layout of the Work. Contractor shall furnish, at its own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to layout any part of the Work. Contractor shall also be responsible for maintaining and preserving all control points established by the County. 14.2.5 Survey Control Points. Existing survey markers (either brass caps or iron pipes) shall be protected by the Contractor or removed and replaced under direct supervision of the County Engineer or his designee. Survey monuments shall be constructed to the requirements of MAG Specifications, Section 405 and Standard Details. Lot corners shall not be disturbed without knowledge and consent of the property owner. The Contractor shall replace benchmarks, monuments or lot corners moved or destroyed during construction at no cost to the County. Contractor and his sureties shall be liable for correct replacement of disturbed survey benchmarks except where the County elects to replace survey benchmarks using their own forces. 14.2.6 Traffic Regulations. All traffic affected by this construction shall be regulated in accordance with City of Phoenix – Traffic Barricade manual, latest edition. At the time of the pre-construction meeting, the Contractor shall designate an employee who is well qualified and experienced in construction traffic control and safety to be responsible for implementing, monitoring and altering traffic control measures as necessary. At the same time the County will designate a representative who will be responsible to see that all traffic control and any alterations are implemented and monitored to the extent that traffic is carried throughout the work area in an effective manner and that motorists, pedestrians, bicyclists and workers are protected from hazards and accidents. All traffic control devices required for this project shall be the responsibility of the Contractor. The Contractor shall place advance warnings; REDUCE SPEED, LOOSE GRAVEL, 25 MPH SPEED LIMIT and DO NOT PASS signs in accordance with the Traffic Barricade Manual. The Contractor shall provide, erect and maintain all necessary flashing arrow boards, barricades, suitable and sufficient warning lights signals and signs, and shall take all necessary precautions for the protection of the work and safety of the public. The Contractor shall provide, erect and maintain acceptable and adequate detour signs at all closures and along detour routes. All barricades and obstructions shall be illuminated at night and all safety lights shall be kept burning from sunset until sunrise. All bar ricades and signs used by the Contractor shall conform to the standard design, generally accepted for such purposes. The Contractor shall insure that all existing traffic signs are erect, clean and in full view of the intended traffic at all times. Street name signs at major street intersections shall be maintained erect at all times. If these signs should interfere with construction, the Contractor shall notify the County at lease forty eight (48) hours in advance for County personnel to temporarily relocate said signs. The County Engineer or designee will re-set all traffic and street name signs to permanent locations when notified by the Engineer that construction is complete unless otherwise stated in the specifications. Payment for this item shall be made at the agreed upon contract allowance price for Traffic Control. When determined necessary by the Contractor, an off-duty Pinal County Sherriff Officer shall be used for traffic control. Contact shall be made through the Pinal County Sherriff’s Officer Representative, Malita Arellano, 520-866-5109. Deputy time, including vehicle and equipment shall be measured by Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 24 of 37 the hour for each hour required to perform traffic control duties. Any time over three (3) hours shall be measured by the hour. The assembly and turnarounds of the Contractor’s equipment shall be accomplished using adjacent local streets when possible. Equipment used and/or directed by the Contractor shall travel with traffic at all times. Supply trucks shall travel with traffic except when being spotted. Provide a flagman or officer to assist with this operation. During construction it may be necessary to alter traffic control. Alterations shall be in accordance with the Traffic Barricade Manual. No street within the project may be closed to through traffic or to local emergency traffic without prior written approval of the County Engineer. Written approval may be given if sufficient time exists to allow for notification of the public at least two (2) days in advance of such closing. Partial closure of streets within the project shall be done in strict conformity with written directions to be obtained from the County Engineer. Caution should be used when excavating near intersections with traffic signal underground cable. Notify the County Engineer twenty four (24) hours in advance of any work at such intersections. The Contractor shall install and maintain temporary overhead traffic signal cable as specified by the County Engineer when underground conduit is to be severed by excavations at intersections. The Contractor shall provide an off-duty uniformed Sheriffs Deputy to direct traffic while the traffic signal is turned off and the wiring is transferred. All damaged or modified traffic signal overhead and underground items shall be repaired and restored to the County Engineers satisfaction. Magnetic detector loops shall under no circumstances be spliced. The Contractor shall address how local access to adjacent properties will be handled in accordance with the specifications herein. Where crossings of existing pavement occur, no open trenches shall be permitted overnight, but plating may be permitted if conditions allow as determined by the County Engineer or his designee. If plates cannot be used, crossings shall be back-filled or the Contractor shall provide a detour. 14.2.7 Operations & Storage. Contractor shall confine all operations (including storage of materials) to areas authorized by the County. 14.2.8 Cleaning Up & Refuse Disposal. Contractor shall at all times keep the site, including storage areas, free from accumulations of waste materials. Before completing the Work, Contractor shall remove from the premises any rubbish, tools, scaffolding, equipment and materials that are not the property of the County. Upon completing the Work, Contractor shall leave the site in a clean and orderly condition satisfactory to the County. Final cleanup of the premises shall be included in the period of performance of the Job Order. Contractor shall be responsible for all construction refuse disposal containers and their removal from the site. Disposal of any hazardous materials not addressed and priced in the Job Order will be segregated for disposal by the County unless the County requires the Contractor to dispose of the materials, in which case, an equitable adjustment in the price will be negotiated and agreed. 14.2.9 Existing Improvements and Utilities. Contractor shall protect from damage all existing improvements and utilities to or near the site and on adjacent property of third parties, the locations of which are made known to or should be known by the Contractor. Contractor shall repair any damage to those facilities, including those that are the property of third parties, resulting from failure to comply with the requirements of the Job Order or failure to exercise reasonable care in performing the Work. If Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 25 of 37 Contractor fails or refuses to repair the damage promptly, the County may have necessary repair work performed and charge the cost to the Contractor. 14.2.10 Safety. Contractor shall be responsible for compliance with all safety rules and regulations of the Federal Occupational Safety and Health Act 1970 (OSHA), all applicable state and local laws, ordinances, and regulations during the performance of the Work. Contractor shall indemnify the County for fines, penalties, and corrective measures that result from the acts of commission or omission of Contractor, its subcontractors, if any, agents, employees and assigns and its failure to comply with such safety rules and regulations. The County reserves the right to approve and monitor the Contractor’s safety policies and program procedures as applied during performance of the Work. Failure to comply with safety policies and program procedures, once approved by Owner, shall be cause for the termination of the Job Order. 14.3 Owner Rights and Obligations. 14.3.1 Suspension of Work. Owner may order Contractor, in writing, to suspend, delay, or interrupt all or any part of the Work for a period of time that the County determines reasonably appropriate. If the performance of all or any part of the Work is suspended, delayed, or interrupted by an act of the County in the administration of a Job Order or by the County’s failure to act within the time specified in the Job Order, an adjustment shall be made for any increase in the cost of performance of the Job Order necessarily caused by the suspension, delay or interruption, and the Job Order will be modified in writing accordingly. A claim under this subparagraph 13.3.1 shall not be allowed for any costs incurred more than thirty (30) calendar days before Contractor shall have notified the County in writing of the act or failure to act (but this requirement shall not apply as to a claim resulting from a suspension order), and unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of such suspension, delay or interruption, but not later than the date of final payment under the Job Order. 14.3.2 County’s Right to Possession. The County shall have the right to take possession of or use any complete or partially completed part of the Work. Before taking possession of or using any Work, the County shall furnish the Contractor a list of items of work remaining to be performed or corrected on those portions of the Work that the County intends to take possession of or use. However, failure of the County to list any item of Work shall not relive the Contractor of responsibility for complying with the terms of this Contract. County possession or use shall not be deemed an acceptance of any Work under this contract. While the County has such possession or use, Contractor shall be relieved of the responsibility for th e loss of or damage of the Work resulting from the County’s possession or use. Notwithstanding the terms of subparagraph 14.2.1. If prior possession or use by the County delays the progress of the Work or causes additional expense to the Contractor, an equitable adjustment shall be made in the Job Order price or the period of performance, and the Job Order shall be modified in writing accordingly. 14.3.3 Other Contracts. The County may undertake or award other Contracts for additional work at or near the site of Work under this contract. Contractor shall fully cooperate with the other Contractors and with the County’s employees and shall carefully adapt scheduling and performing the Work under this contract to accommodate the additional work, heeding any direction that may be provided by the County. Contractor shall not commit or permit any act that will interfere with the performance of its Work by any other contractor or by County employees. 14.3.4 Job Order Amendment. Job Orders may be amended by the County in the same manner as they are issued. 14.3.5 Job Order Value. The maximum Job Order value is One Million Dollars ($1,000,000), except as provided by §17.1. Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 26 of 37 15. Job Order Documents: 15.1 Specifications and Drawings. Anything mentioned in the specifications and not shown in the drawings or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of differences between drawings and specifications, the drawings shall govern. In case of discrepancy either in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the County, who shall promptly make a determination in writing. Any adjustment by Contractor without such a determination shall be at its own risk and expense. The County shall furnish from time to time such detail drawings and other information as considered necessary, unless otherwise provided. 15.2 Show Drawings. Shop drawings include sketches, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by Contractor to explain in detail specific portions of the Work. The County may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under the Contract. Show drawings means drawings submitted to the County by the Contractor showing in detail: 15.2.1 The proposed fabrication and assembly of structural elements; 15.2.2 The installation (i.e. form, fit and attachment details) of materials or equipment, and 15.2.3 The construction and detailing of elements of the Work. 15.3 Shop Drawing Coordination. Contractor shall coordinate all shop drawings, and review them for accuracy, completeness and compliance with Contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the County without evidence of Contractor’s approval may be returned for resubmission. The County will indicate its approval or disapproval of the shop drawings and if not approved as submitted shall indicate County’s reason therefore. Any work done before such approval shall be at the Contractor’s risk. Approval by the County shall not relieve Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of the Contract, except with respect to variations described and approved in accordance with §14.3 below. 15.4 Shop Drawing Modification. If shop drawings show variations from the Job Order requirements, Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If Owner approves any such variation, Owner shall issue an appropriate Contract modification, except that, if the variation is minor and does not involve a change in price or in time of performance, a modification need not be issued. 15.5 Shop Drawing Omissions. Omissions from the drawings or specifications or the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve Contractor from performing such omitted or mis-described details of the Work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications. 15.6 Owner Furnished Drawings. Contractor shall check all County furnished drawings immediately upon receipt and shall promptly no tify the County of any discrepancies. Any errors or omissions in the County furnished drawings are the responsibility of the County to rectify, including associated costs. Figure marked on drawings shall be followed in preference to scale measurements. Large scale drawings shall govern small scale drawings. Contractor shall compare all drawings and verify the figures before laying out the Work and will be responsible for any errors which might have been avoided thereby. 15.7 Show Drawing Submittal. Contractor shall submit to the County for approval an appropriate number of copies of all shop drawings as called for under the various headings of these specifications. Sets of all shop drawings will be retained by the County and one set will be returned to the Contractor with annotation of approval or rejection within one (1) week after submission, unless a longer review period is necessary by mutual agreement between the County and the Contractor. 15.8 Use of Job Order Documents. All drawings (to include as -built drawings), sketches, designs, design data, specifications, note books, technical and scientific data provided to Contractor or developed by Contractor pursuant to the Contract and all photographs, negatives, reports, findings, recommendations, data and memoranda of every description relating thereto, as well as all copies of the foregoing relating to the Work or any part here of, shall be Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 27 of 37 the property of the County and may be used by the County without any claim by the Contractor for additional compensation, unless such material developed by Contractor does not result in an issued Job Order. In such cases, Contractor will receive reasonable reimbursement for the development of such materials before the County uses them in any manner whatsoever. In addition, the County agrees to hold the Contractor harmless to the extent permitted by law from any legal liability arising out of the County’s use of such material. 16. Contract Changes: 16.1 County Changes. The County may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make changes in the Work within the general scope of the Job Orders, including changes: 16.1.1 In the specifications (including drawings and designs); 16.1.2 In County furnished facilities, equipment, materials, services, or site; or 16.1.3 Directing acceleration in the performance of the Work, or otherwise altering the schedule for performance of the Work. 16.2 County Change Orders. Any other written order (which, as used in this paragraph, includes direction, instruction, interpretation, or determination) from the County that causes a change shall be treated as a change order under this section; provided, that the Contractor gives the County timely written notice stating the date, circumstances and source of the order that Contractor regards the order as a change order. 16.3 Contract Adjustments. Except as provided in this section, no order, statement or conduct of t he County shall be treated as a change under this section or entitle Contractor to an equitable adjustment hereunder. 16.4 Modification of the Job Order. If any change under this section causes an increase or decrease in Contractor’s cost of, or the time required for, the performance of any part of the Work under a Job Order, whether or not changed by any such order, the County shall negotiate an equitable adjustment and modify the Job Order in writing. 16.5 Contractor Proposals. Contractor must submit any proposal under this section within thirty (30) calendar days after: 16.5.1 Receipt of a written change order under section 16.1 above; or 16.5.2 The furnishing of a written notice under section 16.2 above by submitting to the County a written statement describing the general nature and amount of the proposal, unless this period is extended by the County. The statement of proposal for adjustment may be included in the notice under section 16.2 above. 16.6 Final Payment Limitation. No proposal by the Contractor for an equitable adjustment shall be allowed if asserted after final payment under the Job Order. 16.7 Contractor Extension Justification. The Contractor shall furnish to the County a written proposal for any proposed extension in the period of performance. The proposal shall contain a price breakdown and period of performance extension justification. 16.8 Contractor Price Breakdown Structure. Contractor, in connection with any proposal it makes for a Job Order change, shall furnish a price breakdown itemized as required by the County and the pricing matrix as required in the awarded contract. 17. ARS Title 34 Provisions: 17.1 The maximum dollar amount of an individual job order shall be One Million Dollars ($1,000,000) or such higher or lower amount prescribed by the County in an action notice pursuant to ARS Title 38, Chapter 3, Article 3.1 or a rule adopted by the County as the maximum amount of an individual job order. Requirements shall not be artificially divided or fragmented in order to constitute a job order that satisfies this requirement. 17.2 If the Contractor subcontracts or intends to subcontract part or all of the work under a job order and if this contract includes descriptions of standard individual tasks, standard unit prices for standard individual tasks and pricing of job orders based on the number of units of standard individual task in the job order, then: Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 28 of 37 17.2.1 The Contractor has a duty to deliver promptly to each subcontractor invited to bid a coefficient to the Contractor to do all or part of the work under one or more job orders: 17.2.1.1 A copy of the description of all standard individual tasks on which the subcontractor is invited to bid. 17.2.1.2 A copy of the standard unit prices for the individual tasks on which the subcontractor is invited to bid. 17.2.2 If not previously delivered to the subcontractor, the Contractor has a duty to delivery promptly the following to each subcontractor invited to or that has agreed to do any of the work included in any job order: 17.2.2.1 A copy of the description of each standard individual task that is included in the job order and that the subcontractor is invited to perform. 17.2.2.2 The number of units of each standard individual task that is included in the job order and that the subcontractor is invited to perform. 17.2.2.3 The standard unit price for each standard individual task that is included in the job order and that the subcontractor is invited to perform. 17.2.3 The County will include the full street or physical address of each separate location at which the construction will be performed for each individual Job Order. The Contractor (and on behalf of each subcontractor at any level) hereby agrees to include in each of its subcontracts the same address information. The Contractor and each subcontractor at any level shall include in each subcontract the full street or physical address of each separate location at which construction work will be performed. 18. Contract Administration and Operation To the extent applicable Contractor shall comply with the following provisions. 18.1 Notice to Proceed/Ordering Authority. The Contractor agrees to render goods or services promptly and diligently upon receipt of a written purchase order or notice to proceed. Prior to receiving this notice, Contractors shall not commence any billable activities in the performance of the Contract. Any attempt to represent any product not specifically awarded under this Contract is a violation of the contract. Any such action is subject to the legal and contractual remedies available to the County, inclusive of, but not limited to, contract termination, suspension and/or debarment of the Contractor. A signed Contract and valid purchase order must be in place prior to the start of any work each year, including renewal periods. 18.2 Records. Under A.R.S. § 35-214 and § 35-215, the Contractor shall retain and shall contractually require each subcontractor to retain all data and other “records” relating to the acquisition and performance of the Contract for a period of five years after the completion of the Contract. All records shall be subject to inspection and audit by the County at reasonable times. Upon request, the Contractor shall produce a legible copy of any or all such records. 18.3 Contractor Business Facilities and Business Practices. The Contractor’s personnel, facilities and equipment shall be in full compliance with all applicable federal, state and local health, environmental and safety laws, regulations, standards, ordinances, privilege license and permit requirements, whether or not they have been referenced by the County. Employee compensation shall meet all applicable requirements of the Fair Labor Standards Act and Federal and Arizona minimum wage laws, in addition to all applicable OSHA regulations. The Contractor bears full responsibility for employee training, safety, and providing necessary equipment to achieve compliance with all such laws and regulations prior to the contract commencement date and to maintain compliance throughout the duration of the contract. Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 29 of 37 18.4 Affirmative Action. Contractor agrees to abide by the provisions of the County Affirmative Action Program. Contractor, their subcontractor(s) and supplier(s) agree to adhere to a policy of equal employment opportunity and demonstrate an affirmative effort to recruit, hire, promote and upgrade the position of employees regardless of race, color, religion, ancestry, sex, age, disability, national origin, sexual orientation, gender identity, familial status, or marital status and who agree and are responsive to the County's goals. Upon request, the Responder/Contractor agrees to submit the following reports to the County's Office of Equal Opportunity Programs: Part A Employment Information Report Part B. Equal Employment Opportunity/Affirmative Action Policy Plan; Part C. Employer Equal Employment Opportunity (EEO) Workforce Profile. All such reports on file with the Equal Employment Opportunity Office will be updated at least annually. The Equal Employment Opportunity Office may for good cause recommend to the County's Chief Financial Officer that failure to comply with the requirements of this subsection be waived and that the submittal be accepted contingent upon receipt of the required reports before a notice to proceed is issued. 18.5 Drug Free Workplace Program. Contractors are hereby advised that Pinal County has adopted a policy establishing a drug free workplace for itself and as a requirement for Contractors doing business with the County, to ensure the safety and health of employees working on its contracts/projects. The Contractor shall require a drug free workplace for all employees working under the contract. Specifically, all Contractor employees who are working under this contract shall be notified in writing by the Contractor that they are prohibited from the manufacture, distribution, dispensation, possession or unlawful use of a controlled substance in the workplace. The Contractor agrees to prohibit the use of intoxicating substances by all employees and shall ensure that employees do not use or possess illegal drugs while in the course of performing their duties. Failure to require a drug free workplace in accordance with the Policy may result in termination of the contract and possible debarment from bidding on future contracts/projects. 18.6 Audit. Pursuant to ARS § 35-214, at any time during the term of this Contract and six (6) years thereafter, the Contractor’s or any subcontractor’s books and records shall be subject to audit by the County and, where applicable, the Federal Government, to the extent that the books and records relate to the performance of the Contract or Subcontract. 18.7 Facilities Inspection and Materials/Service Testing. The Contractor agrees to permit access to its facilities, subcontractor facilities and the Contractor’s processes or services, at reasonable times for inspection of the facilities or materials covered under this Contract. The County shall also have the right to test, at its own cost, the materials to be supplied under this Contract. Neither inspection of the Contractor’s facilities nor materials testing shall constitute final acceptance of the materials or services. If the County determines non-compliance of the materials, the Contractor shall be responsible for the payment of all costs incurred by the County for testing and inspection. All material or service is subject to final inspection and acceptance by the County. Material or service failing to conform to the specifications of this contract shall be held at Contractor’s risk and may be returned. If defective goods are returned or services must be re-performed, all costs are the responsibility of the Contractor. 18.8 Notices. Notices to the Contractor required by this Contract shall be made by the County to the person indicated on the Offer and Acceptance form submitted by the Contractor unless otherwise stated in the Contract. Notices to the County required by the Contract shall be made by the Contractor to the Solicitation Contact Person indicated on the Solicitation cover sheet, unless otherwise stated in the Contract. An authorized Procurement Officer and an authorized Contractor representative may change their respective person to whom notice shall be given by written notice to the other and an amendment to the Contract shall not be necessary. 18.9 Advertising, Publishing and Promotion of Contract. The Contractor shall not use, advertise or promote information for commercial benefit concerning this Contract without the prior written approval of the Procurement Officer. 18.10 Property of the County. Any materials, including reports, computer programs and other deliverables, created under this Contract are the sole property of the County. The Contractor is not entitled to a patent or copyright on those materials and may not transfer the patent or copyright to anyone else. The Contractor shall not use or release these materials without the prior written consent of the County. Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 30 of 37 18.11 Offshore Performance of Work Prohibited . Due to security and identity protection concerns, direct services under this contract shall be performed within the borders of the United States. Any services that are described in the specifications or scope of work that directly serve the Pinal County or its clients and may involve access to secure or sensitive data or personal client data or development or modification of software for the State shall be performed within the borders of the United States. Unless specifically stated otherwise in the specifications, this definition does not apply to indirect or 'overhead' services, redundant back-up services or services that are incidental to the performance of the contract. This provision applies to work performed by subcontractors at all tiers. 18.12 Ownership of Intellectual Property . Any and all intellectual property, including but not limited to copyright, invention, trademark, tradename, service mark, and/or trade secrets created or conceived pursuant to or as a result of this contract and any related subcontract (“Intellectual Property”), shall be work made for hire and the County shall be considered the creator of such Intellectual Property. The Pinal County department requesting the issuance of this contract shall own (for and on behalf of the County) the entire right, title and interest to the Intellectual Property throughout the world. Contractor shall notify the County, within thirty (30) days, of the creation of any Intellectual Property by it or its subcontractor(s). Contractor, on behalf of itself and any subcontractor (s), agrees to execute any and all document(s) necessary to assure ownership of the Intellectual Property vests in the County and shall take no affirmative actions that might have the effect of vesting all or part of the Intellectual Property in any entity other than the County. The Intellectual Property shall not be disclosed by contractor or its subcontractor(s) to any entity not the County without the express written authorization of the Pinal County department requesting the issuance of this contract. 18.13 Confidentiality of Records. The Contractor shall maintain the confidentiality and privilege of any documents that the Contractor has access to which have been designated by the County as confidential or privileged. The Contractor shall establish and maintain procedures and controls that are acceptable to the County for the purpose of assuring that no information contained in its records obtained from the County or from others in carrying out its functions under the contract shall be used by or disclosed by it, its agents, officers, or employees, except as required to efficiently perform duties under the contract. Persons requesting such information should be referred to the County. Contractor also agrees that any information pertaining to individual persons shall not be divulged other than to employees or officers of Contractor as needed for the performance of duties under the contract, unless otherwise agreed to in writing by the County. 18.14 Federal Immigration and Nationality Act. The contractor shall comply with all federal, state and local immigration laws and regulations relating to the immigration status of their employees during the term of the contract. Further, the contractor shall flow down this requirement to all subcontractors utilized during the term of the contract. The County shall retain the right to perform random audits of contractor and subcontractor records or to inspect papers of any employee thereof to ensure compliance. Should the County determin e that the contractor and/or any subcontractors be found noncompliant, the County may pursue all remedies allowed by law, including, but not limited to; suspension of work, termination of the contract for default and suspension and/or debarment of the contractor. 18.15 E-Verify Requirements. In accordance with A.R.S. § 41-4401, Contractor warrants compliance with all Federal immigration laws and regulations relating to employees and warrants its compliance with Section A.R.S. § 23- 214, Subsection A. 19. Price Adjustment for Bituminous Materials 19.1 Description Price adjustment shall be calculated based on price changes of bituminous material occurring between the submittal deadline date for the JOC technical and price proposals and the date that the material is delivered or used. Price adjustment shall be bi-directional, potentially increasing or decreasing contract payments. The term "bituminous material" as used herein shall include asphalt cement, liquid asphalt and emulsified asphalt and shall apply only to specific pay items requiring these materials. The contract unit price for each item of bituminous material shall include all costs for furnishing, hauling, handling, spreading, and mixing of the material required, including the "initial cost" of bituminous material and all applicable taxes, bonds, and insurance premiums; but excluding any difference in the cost of bituminous material that occurs between the Terms & Conditions Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 31 of 37 submittal deadline date for the JOC price proposal and the date that the material is delivered or used and the cost of taxes, bonds and insurance directly attributed to the price adjustment amount for bituminous materials. 19.2 Measurement Emulsified Asphalt The tons of emulsified products to which the adjustment will be applicable will be the tons of the bituminous material within the emulsion. The Contractor shall weigh or measure the truck or trailer tank prior to and after placing the emulsion and will be paid based upon the difference in the weight. 19.3 Payment The "initial cost" of asphalt cement, liquid asphalt and emulsified asphalt will be the quarterly cost determined by the Arizona Department of Transportation (ADOT) based on selling prices of asphalt and all materials published by the ADOT. The bituminous material "initial cost" price is issued each month in memorandum form by ADOT's Contract and Specifications Section of the Intermodal Transportation Division under "Price Adjustment for Bituminous Material" title. The price is the arithmetic average of the high and low selling prices for asphalt cement shown for the previous quarter in the ADOT escalator. This price will be deemed to be the "initial cost" for bituminous material of all types, grades, etc., on projects on which bids are opened during the following month. This price may be obtained from the ADOT website: http://www.azdot.gov/business/ContractsandSpecifications/PriceAdjustmentforBituminousMaterialandDieselFuel For each item of bituminous material for which there is a specific pay item, an adjustment in compensation will be made for either an increase or decrease in the price of asphalt cement as shown in the ADOT memorandum, current for the date of use of the material, as compared to the "initial cost". Adjustments in compensation for emulsified asphalt will be made for the bituminous material prior to dilution. The tons of bituminous materials which are paid for on an invoice basis to which the adjustment will be applicable are the tons which have been delivered to the project and subsequently incorporated into the work. The adjustment will be applicable on the date of use of the bituminous material. Price Adjustment for Bituminous Materials shall include an adjustment for the actual change in cost of premiums on required payment and performance bonds, the actual change in cost of premiums for property damage and/or public liability insurance, and the change in sales tax (identified in Section 109.2.3) liability incurred as a result of the price adjustment for bituminous materials. The Contractor shall provide documentation to determine the adjustment for the actual change in cost of premiums on required payment and performance bonds, property damage and/or public liability insurance, and sales tax. No additional compensation will be made for any additional or increased charges, costs, expenses, etc., which the Contractor may have incurred since the time of the Price proposal submittal which may be the result of any increase in the "initial cost" of bituminous material. The Price Adjustment for Bituminous Materials will be made in the next regular payment following actual use or application of the bituminous material and may cause an increase or decrease in payments. Quarterly billing shall be identified as: Quarter 1; July - September, released end of June Quarter 2; October -December, released end of September Quarter 3; January - March, released end of December Quarter 4; April - June, released end of March Addendum Acknowledgement Form Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 32 of 37 ADDENDUM ACKNOWLEDGEMENT FORM Solicitation Addendums are posted on the Pinal County website at the following address: http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx . It is the responsibility of the Responder to periodically check this website for any Solicitation Addendum. This page is used to acknowledge any and all addendums that might be issued. Any addendum issued within five days of the solicitation due date, will include a new due date to allow for addressing the addendum issues. Your signature indicates that you took the information provided in the addendums into consideration when providing your complete response. Please sign and date: ADDENDUM NO. 1 Acknowledgement Signature Date ADDENDUM NO. 2 Acknowledgement Signature Date ADDENDUM NO. 3 Acknowledgement Signature Date If no addendums were issued, indicate below, sign the form and return with your response. Firm W-9 Form Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 33 of 37 W-9 FORM Download W -9 Form from http://www.irs.gov/pub/irs-pdf/fw9.pdf Responder’s Checklist Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 34 of 37 RESPONDERS CHECKLIST Yes/No Did you include your signed Offer sheet? See Page 34 & 35 of this solicitation. Did you acknowledge all addendums, if any? See page 31. Any addendums would be uploaded in Bonfire. Did you complete and include all required Response Forms? Any Response forms would be available in Bonfire. Did you include your W-9 Form? See page 32 of this solicitation. Did you include any necessary attachments? Did you follow the order for submissions of documents? See Section 2.4 – Offer format in the Special Instructions of this solicitation. Did you include proof of insurance(s) if requested? Offer and Acceptance Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 35 of 37 OFFER AND ACCEPTANCE FORM TO PINAL COUNTY: The undersigned hereby offers and agrees to furnish the material, service, or construction in compliance with all terms, conditions, specifications, and amendments in the Solicitation. Authorized Signature Title ________________________________________________________________________ Printed Name Date ________________________________________________________________________ Company Name Telephone Address City, State, Zip For clarification of this offer, contact: Name:_______________________________________ Phone:_____________________ Fax:___________________ Email: _______________________________________________________ ACCEPTANCE OF OFFER (For Pinal County Use Only) The offer is hereby accepted and the Responder is now bound to sell or provide the materials, services, or construction as indicated by the Purchase Order or Notice of Award and based upon the solicitation, including all terms, conditions, specifications, amendments, etc. and the Offer as accepted by Pinal County. The contract is for: JOC Asphalt Maintenance & Repair Services This contract shall henceforth be referenced to as Contract No. 175923. The Offeror is cautioned not to commence any billable work or to provide any material or service under this contract until Offeror receives an executed purchase order or notice to proceed. Awarded this day of 2018. Name (Print) Title Signature Approved as to form: Pinal County Attorney’s Office Offer and Acceptance Pinal County Finance Department 31 N. Pinal St. Bldg. A P.O. Box 1348 Florence, AZ 85132 Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 36 of 37 OFFER AND ACCEPTANCE FORM – Page 2 By signing the previous page of the Offer and Acceptance Form, Responder certifies: A. The submission of the bid did not involve collusion or other anti-competitive practices. B. The Responder shall not discriminate against any employee or applicant for employment in violation of Federal Executive Order 11246. C. The Responder has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with the Submittal. D. The Responder certifies that it complies with Executive Order 12549 related to Federal Government Debarment and Suspension (see 4-7) E. The Responder certifies that the individual signing the bid is an authorized agent for the Responder and has the authority to bind them to the contract. _____________________________________________ Company Name _____________________________________________ Authorized Signature End of Solicitation Solicitation No: 173923 Available online at http://pinalcountyaz.gov/Purchasing/Pages/CurrentSolicitations.aspx Page 37 of 37 PINAL COUNTY Pinal County Finance Department 31 N. Pinal Street, PO Box 1348 Florence, AZ 85132 520-866-6526 Contract Amendment Contract 175923ROQ Amendment # 3 Procurement Officer: Lorina Gillette Lorina.Gillette@pinal.gov JOC Asphalt Maintenance & Repair Services Contactor Name: Cactus Asphalt Pursuant to Section 4 (Contract Term, Extension, Price Adjustment) the above referenced contract shall be amended as follows: 1.The term of this contract is hereby extended through June 26, 2022. 2.All other Terms, Conditions, and Pricing remain the same. Pinal County hereby executes its right to unilaterally amend the above referenced contract on this date. X 06/09/2021 Date Pinal County Board of Supervisors IFB 175923 – Asphalt Maintenance & Repair Services Page 1 of 18 RESPONDER PROFILE Cactus Transport, Inc. DBA Cactus Asphalt 8211 West Sherman Street Tolleson, AZ 85353 Representative: Jeff Smith, Project Manager (602) 618-7405 jsmith@cactusasphalt.com QUESTION SET – Method of Approach 2.0.1 QUESTION: Describe your experience in the advantages and disadvantages of the JOC alternative delivery method compared to traditional design-bid-build. RESPONSE: Holding multiple Job Order Contracts (JOCs) over the past 14 years has given Cactus Asphalt (Cactus) insight into the world of alternative delivery methods commonly used with JOCs. Overall the experience has been positive for us which is why we’ve had nine JOCs renewed over the past three years with multiple agencies. We believe advantages for the JOC delivery method include the following: Flexibility – Both for the contractor and agency, a JOC gives flexibility for procuring and scheduling work as the two come together early in the stage to determine the proper time and season to perform work. Partnership – The agency and contractor act as partners throughout design, procurement and construction working towards the same ultimate goal of a quality end product. Quality – With the JOC delivery method the contractor and owner can focus on quality products, companies and practices. Cactus has developed a quality control program that includes oversight by our in-house QC manager which allows us to be on the forefront of new and developing technologies and products in construction. We also focus on procuring and keeping quality subcontractors that align with our vision of the project. Open Communication – Early on in the process Cactus will set up a meeting with the agency and all key employees to launch the kick off for the JOC. This happens before work is scheduled or procured so all parties can get to know each other. Scheduling – As Cactus partners with multiple agencies, we have become accustomed to pre- scheduling anticipated work needed in the future seasons when capacity is decreased (this is especially true for paving and chip sealing). We regularly block out dates early in the year in anticipation of JOC projects that can be determined at a later date. IFB 175923 – Asphalt Maintenance & Repair Services Page 2 of 18 End of the Year Funding – Some JOC projects are assigned towards the end of the fiscal year with a hard date to complete so that funds can be expended. This is not typically the case with design- bid-build projects as they are usually funded pre-bid and have an end date that does not constrain to the end of the fiscal year. Though this might sound negative, Cactus has turned this into a positive throughout our years successfully completing JOC projects. With our multiple crews, Cactus can schedule a job properly and complete it within of the fiscal year timeframe. We are also able to price our projects quickly so that the owner can map out their spending throughout the year. With our JOC experience over multiple years, we believe that there is no disadvantage with the JOC alternative delivery method compared to traditional design-bid-build. With a JOC, the contractor and owner come together as a team focused on the best interest of the end users of the product and most often the public. This team can work together for many years developing a professional relationship with trust and respect that no design-bid-build project can; whereas the hard-bid market (design-bid-build) creates an adversarial relationship at the start. The contractor has to bid as low as possible to get the job and will fight over every change to get the most they can through change orders if necessary. All this is avoidable with JOC and alternative delivery methods. 2.0.2 QUESTION: Describe successful processes your company has developed for prior work that specifically parallels the JOC process. Provide specific details and methodology to demonstrate why each process was successful including advantages over commonly utilized processes. Include a description of the software system(s) successfully used by your company for project estimating, planning, scheduling and managing construction and the unique processes you’ve developed for its use in JOC (or comparable) contracts. RESPONSE: Processes that have been developed for JOC and other work include a single point of contact, team involvement from pre-construction to punch-list, a timeline for procurement, and cross- training employees. Single Point of Contact – Cactus will assign a person as the single-point-of-contact for this JOC. Their involvement is from start to finish on all Job Order Assignments (JOAs). They will be with the agency for pre-design and design services, they will assist the Senior Estimator in putting together all pricing. They will help coordinate the pre-construction and assist in scheduling the work. When work is being performed they will be involved in the day to day operations. And finally, they will be there for the punch list walk through and sign off with the agency. We have seen this process improve our communication and production with JOCs as the Single-Point-of-Contact helps guide the JOC from start to finish. Team Involvement – Cactus will not only have the Single-Point-of-Contact involved, but during pre- construction and cost assembly, the Senior Estimator will provide estimates and assist with acquiring subcontractors (if needed). Once the pre-construction is initiated the Division Manager and Project Superintendent will be there to help with construction start-up and close-out. During no point in a project’s life will the agency be without the Cactus team. Procurement Timeline – Over the past few years Cactus has developed a timeline that assists in procuring JOC and alternative delivery work. Once the project is defined and site visits are performed, our team goes into action. Depending on the size and scope of the project, we can provide a price proposal in as little as 72 hours or up to 1 week. This enables the agency to have the information in front of them quicker so they can make an informed decision on how the work will commence, either to go ahead as planned or adjust scope for any reason. IFB 175923 – Asphalt Maintenance & Repair Services Page 3 of 18 Cross Training Employees and Crews – Cactus has established a cross-training program for our various crews so they can perform a variety of services and applications required to keep up with agency demands or schedule. For instance, our concrete crews can provide crack sealing, fog sealing, seal coating, and patching services. The more skills the crews have, the more efficient the project. Systems used for estimating, planning, scheduling, and managing construction include the following: Estimating – Cactus uses various take-off software to determine areas and volumes; including AGTEK Software for digitizing plans and calculating volumes, and Plan Swift for on-screen take- offs f or linear footage and area measurements. Cactus uses Bid 2 Win software for generating accurate cost estimates concerning each phase and scope of work for each JOA. Planning & Scheduling – Cactus utilizes Microsoft Project software for generating a Gantt chart schedule. Cactus has a full-time scheduler that controls the master schedule of our various crews. The Single-Point-of-Contact will work with the project scheduler to make sure time is secured for crews and supervision to perform and manage work. Managing Construction – Timberline and Build 2 Win software are used for tracking construction progress and JOA costs. The crew foreman will enter daily quantities and crew time at the end of each shift. This information ties into Bid 2 Win to compare progress to the budget. Invoices can be created off these imported quantities for easy billing of jobs that can take place weekly or monthly. These systems have been integrated into the Cactus culture and are used on all projects from JOC projects to traditional design-bid-build projects. With these systems, Cactus is able to effectively manage and control work for productivity and quality. 2.0.3 QUESTION: Discuss the key components and advantages of your company’s selection process for subcontractors. Demonstrate your understanding of the County’s requirement that subcontractor selection must be based on qualifications alone or a combination of qualifications and price, not on price alone. Provide a detailed proposed Subcontractor Selection Plan attached as an appendix. RESPONSE: Through JOC involvement, Cactus has learned that a quality subcontractor is invaluable to the process and project. We have developed a subcontractor selection plan that not only takes price into consideration but also five additional criteria as listed below: Previous work performance - the ability to show up on time and deliver quality is valued in a subcontractor despite the number of contracts they perform on. We value a subcontractor that treats each project as important as the rest. Partnering Ability – Cactus chooses subcontractors that can adapt to the “Team” model with a cohesive vision of project goals in mind. Cost control and pricing – The ability to stay within budget is valued as we focus on the best product for the best value. IFB 175923 – Asphalt Maintenance & Repair Services Page 4 of 18 Safety program – Cactus will only choose subcontractors that have qualified safety programs in place and implement the use of them through all phases of work. Overall quality of their work – Cactus considers previous work history and performance as a measuring tool for quality. Quality work is often placed above lower price, due to avoidance of warranty and punch list items that can come up at the end of projects. All of these traits are considered when selecting subcontractors to become part of our team on JOC projects. Sometimes the lowest price is the best; other times quality and safety out-weigh a low price. 2.0.4 QUESTION: Discuss the Contractor’s intention of self-performance for each Job Order Assignment and indicate percentage of self-performance you intend to provide under this contract. Remember that Pinal County requires a minimum of 51% of work be self- performance. RESPONSE: It is the intention of Cactus to self-perform as much of the JOA work as possible acknowledging that there are items of work that will need to be subcontracted. We will absolutely maintain a minimum of 51% per JOA as provided below. The self-performed work is based on Cactus’ capability and the items listed in ROQ Section 2. Based on the scope of services of this JOC, Cactus anticipates performing more than 51% of the services as shown in the Self-Performed vs Subcontracted list below. Self-performed: Obtain all necessary permits, required to complete the JOA, including but not limited to; Engineering Off-site, haul route, stockpile, SWPPP, dust control, traffic control plans, etc. Placing asphalt pavements including full depth sections, overlays, patches and repairs. Pavement maintenance and rehabilitation; including but not limited to; crack sealing and joint sealing, crack routing and large crack repair, applying various types of surface treatments including fog seal, scrub seal, slurry seal, chip seal, other asphalt rejuvenation methods, milling and/or roadway profiling, saw cutting and removing both asphalt and concrete pavements. Minor subgrade preparation including compacting native soil, placing and compacting ABC, millings, soil stabilization and grading. Minor earthwork: site rough and finishing grade. Maintaining shoulders including grading, placement of surface treatment and sealing. Subcontracted: Signing and striping including, survey of existing striping and signing, providing and installing project signs, obliteration of striping, layout and installing striping, symbols, raised pavement markers and signage. Combination of self-performed and subcontracted depending on crew availability and size of work: Preparing traffic control plans, providing traffic set-up in accordance with the approved traffic control plans and barricading work areas. IFB 175923 – Asphalt Maintenance & Repair Services Page 5 of 18 2.0.5 QUESTION: Discuss what efforts the Contractor would initiate to meet the project budget and schedule during the negotiation process. RESPONSE: The Single-Point-of-Contact and Senior Estimator will be involved in the negotiation process. To develop a proper budget, a complete scope of work will be agreed upon by the County and Cactus. If the cost of work falls outside the budget, Cactus will work hand-in-hand with the County on either reducing the scope, cutting unnecessary work out or by partnering with their subs and suppliers to convey the needs of the County. The same efforts will be applied to the schedule. If there is not enough time or days to complete the work as is, Cactus can look at double shifts or weekend work to complete it within the time allotted. This can also be mitigated by early planning and blocking out days ahead of schedule. QUESTION SET – Qualifications and Experience of Contractor 3.0.1 QUESTION: Provide a general description of all services provided by the Contractor or team that is proposing to provide JOC services. Indicate all services provided by each team member. Include information for any specific subcontractor to be utilized for all work of a certain type. RESPONSE: Cactus has been providing 85% of the services requested by the County for over eight years. The Cactus Team will provide the following services: Obtaining all necessary permits; Placing asphalt pavements including full depth sections, overlays, patches and repairs; Pavement maintenance and rehabilitation; minor subgrade preparation; rough and finishing grade. Cactus team members assigned to the County’s JOC and services provided include: Jeff Smith, Project Manager and single-point-of-contact, will be responsible for project oversight, including obtaining all necessary permits and preparing traffic control plans, providing traffic set-up in accordance with the approved traffic control plans and barricading work areas. Jeff Abram, Senior Estimator is responsible for estimating and pre-construction services. Scott McMorine, Chip Seal and Fog Seal Division Manager is responsible for planning, scheduling, mobilization of the equipment and crews, and project management including quality control, timeline management, safety compliance, purchase orders for material and subcontractors for JOAs that include chip seal and fog seal applications. Kyle Gooding, Crack Seal and Seal Coat Division Manager is responsible for project planning including scheduling, mobilization of the equipment and crews, and project management including quality control, timeline management, safety compliance, purchase orders for material and subcontractors for JOAs that include crack seal and seal coat applications. Oscar Gonzales, Field Operations Manager is responsible for planning, scheduling, project management and safety for these asphalt paving services including: placing asphalt pavements IFB 175923 – Asphalt Maintenance & Repair Services Page 6 of 18 including full depth sections, overlays, patches and repairs; pavement maintenance and rehabilitation; minor subgrade preparation; rough and finishing grade. Along with our professional and qualified staff, Cactus has the ability to produce the materials called for in this JOC. Cactus continues to diversify and we have come to specialize in the application of Polymer Modified Asphalt Rubber, Asphalt Rubber, Rubberized Asphalt Binder and Scrub Seal. Cactus has developed recycled tire rubber/polymer blending and application equipment with our partners, D & H Manufacturing and Bearcat Manufacturing. All of this equipment is state-of-the-art and is well maintained at our shop in Tolleson, Arizona. Our employees have been highly trained not only to operate this equipment efficiently but to have a deep understanding of the component materials and the final binder products being utilized. Cactus has also established blending and construction procedures that have led to Value Engineering opportunities that have revolutionized how agencies look at utilizing these highly modified and quality materials. Cactus has developed a family of materials that have been utilized for many years in various pavement repair, maintenance and preservation applications. These materials and systems are recommended to be utilized based on a number of variables, particularly and most importantly existing pavement condition. All materials are highly modified with tire rubber and SBS polymer, and have been specifically formulated and custom blended for specific use in all aspects of pavement rehabilitation focusing on best practice criteria. • Crack Seal Material • Scrub Seal Material • Trackless Tack • Low Volume Fractured Aggregate Surface Treatment (SAM and SAMI) • High Volume Fractured Aggregate Surface Treatment (SAM and SAMI) • Modified Cape Seal • Durable Hot Mix Overlay Each of these uses can be applied to parking lot and street applications and each has proven to extend the life of deteriorated pavements which result in life cycle cost benefit while recycling scrap tires from Arizona landfills. We consider this a benefit to Pinal County as their pavement preservation program will be on the forefront of new materials and services provided by Cactus, a leader in the pavement preservation industry. 3.0.2 QUESTION: Describe the Contractor’s management and organizational abilities. RESPONSE: Cactus Asphalt is a division of Cactus Transport Inc. The company has three entities each overseen by a managing partner. Bryan Glazer oversees the estimating and sales division. Reporting to him is Jeff Abram (Senior Estimator) and Jeff Smith (Project Manager) as well as other individuals involved in sales for the private and non-government agencies. Jason Hoffman oversees the transport division. Cactus’s transportation is the largest asphalt liquid hauler in the southwest and has two rubber blending units that can blend custom Asphalt Rubber along with Chip Seal Binder. James Gallegos oversees the operations division of Cactus. This division is split into four sub- categories depending on the work involved. Oscar Gonzales is the division manager of the paving, grading and concrete division. Kyle Gooding is the division manager of the crack seal and seal coat division. Scott McMorine is the division manager of the Chip Seal and Fog Seal Division. Dave IFB 175923 – Asphalt Maintenance & Repair Services Page 7 of 18 Troyanek is the division manager of the traffic control and striping division. Additionally, Sherry Gillespie is the safety officer who makes sure Cactus is compliant and safe on all projects. She assists all three managing partners in day-to-day safety and corporate safety issues. All divisions and employees work hand-in-hand to ensure success in all endeavors no matter how small or large the project is. 3.0.3 QUESTION: List the Arizona professional and contractor license(s) held by the Contractor. Provide the license number and explain if held by an individual or the Contractor. RESPONSE: 194430 Class A General Engineering held by Contractor 3.0.4 QUESTION: Provide project information where the Contractor provided construction services similar to those listed in Section 2 of the Statement of Work. The County may take into consideration the number of Job Order Contracts a company may have, the resource investment of the contractor in current County work, and the amount of pervious work recently performed for the County as part of the selection process. RESPONSE: Cactus currently provides construction services similar to those listed in Section 2 of the Statement of work for nine JOCs, including a JOC for Pavement Preservation and Repair Services with Pinal County. Cactus has worked with Pinal County for over eight years providing paving, chip seal, crack seal, fog seal and scrub seal, and has dedicated resources available to meet the requirements and expectations of this JOC, including 50+ employees representing eight crews. JOAs completed by Cactus for Pinal County and other JOCs include: Pinal County JOA List Project Title - Pinal County Fall 2016 Chip Seal Dollar Amount - $923,521.00 Project Scope - Chip Seal, Fog Seal and Striping Project Title - Pinal County Crack Seal FY 16-17 County Wide Dollar Amount - $359,236.00 Project Scope - Crack Seal and Crack Mastic. Project Title - Pinal County Crack Seal FY 17-18 Dollar Amount $154,920.00 Project Scope - Crack Seal Project Title - Pinal County Spring 2018 Chip Seal Dollar Amount - $555,079.00 Project Scope - Chip Seal, Fog Seal and Striping Project Title - Pinal County Fog Seal FY 17-18 Dollar Amount - $484,039.00 Project Scope - Fog Seal and Striping Project Title - Pinal County Chip Seal; FY 17-18 Dollar Amount - $673,845.00 IFB 175923 – Asphalt Maintenance & Repair Services Page 8 of 18 Project Scope - Chip Seal, Fog Seal and Striping Project Title - Pinal County San Manuel Airport TRMSS Dollar Amount - $11,698.00 Project Scope - Fog Seal and Striping Project Title - Pinal County ARDP Chip Seal FY 15-16 Dollar Amount - $525,318.00 Project Scope - Chip Seal and Fog Seal Project Title - Pinal County Crack Seal FY 15-16 Dollar Amount - $316,104.00 Project Scope - Crack Seal Project Title - Pinal County Pavement Preservation FY 15-16 Dollar Amount - $1,293,020.00 Project Scope - Chip Seal, Fog Seal and Striping Project Title - Pinal County PASS Fog Seal FY 15-16 Dollar Amount - $61,536.00 Project Scope - Fog Seal Project Title - Pinal County Ironwood Road Pot Hole Patching and Crack Sealing - 2015 Dollar Amount - $223,781.00 Project Scope - AC Patching and Crack Sealing Project Title - Pinal County Ironwood Fog Seal - 2015 Dollar Amount - $116,660.00 Project Scope - PASS Fog Seal Project Title - Pinal County Spring Chip and Fog Seal FY 2014 Dollar Amount - $496,710.00 Project Scope - Chip Seal, Fog Seal and Striping Project Title - Pinal County Fog Seal FY 15-16 Dollar Amount - $100,116.00 Project Scope - Fog Seal Project Title - Pinal County Pavement Preservation Spring FY 15 Dollar Amount - $58,125.00 Project Scope - Scrub Seal Project Title - Pinal County Pavement Preservation FY 14-15 Dollar Amount - $474,204.00 Project Scope - Chip Seal, Fog Seal and Striping Project Title - Pinal County Pavement Preservation FY 13-14 Dollar Amount - $317,635.00 Project Scope - Chip Seal and Fog Seal Project Title - Pinal County Pavement Preservation FY 12-13 Dollar Amount - $362,665.00 IFB 175923 – Asphalt Maintenance & Repair Services Page 9 of 18 Project Scope - Chip Seal and Fog Seal Project Title - Pinal County Pavement Preservation 2014 Dollar Amount - $605,120.00 Project Scope - Chip Seal, Fog Seal and Striping Additional JOCs under contract with Cactus include: MCDOT JOA List Project Title - Maricopa County - Anthem Unit 21-B Dollar Amount - $34,460.00 Project Scope - Mastic Crack Fill Project Title - Maricopa County - Green "T" Intersection Dollar Amount - $163,864.00 Project Scope - Demo, Grading, Concrete, Paving, Striping and Landscaping Project Title - Maricopa County - 99th Avenue Channel Dollar Amount - $525,235.00 Project Scope - Pulverization, Grading, Shot-Crete Project Title - Maricopa County - 253rd Avenue and Rockaway Hills Dollar Amount - $33,497.00 Project Scope - Earthwork Project Title - Maricopa County - Litchfield Railroad Crossing Dollar Amount - $61,870.00 Project Scope - Milling, Grading and Paving Project Title - Maricopa County - Northwest Maintenance Yard Driveway Dollar Amount - $130,986.00 Project Scope - Milling, Grading, Paving and Concrete Project Title - Maricopa County - Cross River Unit 8 Dollar Amount - $245,403.00 Project Scope - Milling, Paving, Utility Adjustments and Survey Markers Project Title - Maricopa County - 126th Drive and Cercado Lane Dollar Amount - $30,444.00 Project Scope - Asphalt Patching and Utility Adjustments Project Title - Maricopa County - 10th Street Reconstruction Dollar Amount - $449,314.00 Project Scope - Earthwork, Clear & Grub, Grading, Paving, Milling, Concrete Structures, Seeding and Waterline Project Title - Maricopa County - Patton Road and Alma School Road Hot in Place Recycle Dollar Amount - $1,407,171.00 Project Scope - Milling, Hot in Place Recycling, Paving, Striping, Utility Adjustments and Traffic Loops Project Title - Maricopa County - 165th Avenue Dollar Amount - $136,681.00 IFB 175923 – Asphalt Maintenance & Repair Services Page 10 of 18 Project Scope - Earthwork, Paving, Concrete, Drainage Ditch and Dust Palliative Project Title - Maricopa County - Indian School Road & 191st Avenue Dollar Amount - $20,120.00 Project Scope - Earthwork Project Title - Maricopa County - Avondale Blvd. & Jackrabbit Trail Overlay Dollar Amount - $626,196.00 Project Scope - Milling, Grading, Paving and Striping Project Title - Maricopa County - Recker Road and San Tan Road Overlay Dollar Amount - $781,358.00 Project Scope - Milling, Grading Paving and Striping Project Title - Maricopa County - Peoria Avenue & 107th Avenue Dollar Amount - $23,882.00 Project Scope - Concrete, Signage and Striping Project Title - Maricopa County - PM-10 Rainbow Valley Improvements Dollar Amount - $558,572.00 Project Scope - Excavation, Grading, Tree Removal, Paving Fencing, Landscaping, Signage and Concrete Project Title - Maricopa County - Southwest PM-10 Project Dollar Amount - $554,395.00 Project Scope - Excavation, Grading, Tree Removal, Paving, Fencing, Landscaping, Signage and Concrete Project Title - Maricopa County - 51st Avenue and Estrella Shoulder Build -up Dollar Amount - $35,100.00 Project Scope - Earthwork Mohave County JOA List Project Title - Mohave County PMAR FAST Spring Chip Seal 2018 Dollar Amount - $501,354.00 Project Scope - Chip Seal and Fog Seal Project Title - Mohave County MC-250 Chip Seal 2017 Dollar Amount - $226,432.00 Project Scope - Chip Seal Project Title - Mohave County PMAR FAST Pierce Ferry Road Chip Seal 2015 Dollar Amount - $477,620.00 Project Scope - Chip Seal Project Title - Mohave County PMAR FAST Chip Seal Mohave Valley 2016 Dollar Amount - $551,794.00 Project Scope - Chip Seal and Fog Seal City of Sedona JOA List Project Title - City of Sedona Chapel Hill Crack Seal IFB 175923 – Asphalt Maintenance & Repair Services Page 11 of 18 Dollar Amount - $44,433.00 Project Scope - Crack Seal Project Title - City of Sedona - Posse Grounds Park, Parking Lot Dollar Amount - $16,807.00 Project Scope - Crack Seal, Fog Seal and Striping Job Title - City of Sedona - Fall 2017/Spring 2018 Work Dollar Amount - $719,785.00 Title - Milling, Paving, Patching, Grading, Fog Seal, Crack Seal, Striping and Chip Seal Project Title - City of Sedona - Spring 2017 Work Dollar Amount - $821,297.00 Project Scope - Milling, Grading, Paving, Patching, Fog Seal, Crack Seal, Chip Seal and Striping Project Title - City of Sedona - Sunset Drive and Mountain Shadows Drive Paving Dollar Amount - $523,869.00 Project Scope - Milling, Crack Sealing, SAMI, Paving, Grading, and Striping Project Title - City of Sedona - Jordan Road Overlay Dollar Amount - $223,762.00 Project Scope - Milling, Paving, Utility Adjustments and Striping Project Title - City of Sedona - Jordan Road Sidewalk Construction Dollar Amount - $134,520.00 Project Scope - Demolition, Grading, Paving, Concrete and Landscaping Project Title - City of Sedona - Palisades Overlay Dollar Amount - $263,256.00 Project Scope - Milling, Paving, Utility Adjustments and Striping Project Title - City of Sedona - Fog Seal and Crack Seal Spring 2016 Dollar Amount - $56,278.00 Project Scope - Fog Seal and Crack Seal Project Title - City of Sedona - Seal Coat Spring 2018 Dollar Amount - $103,752.00 Project Scope - Seal Coat Project Title - City of Sedona - Chapel Hill Modified Seal Coat 2018 Dollar Amount - $211,252.00 Project Scope - Modified Seal Coat Project Title - City of Sedona - Waste Water Treatment Plant Crack Seal Dollar Amount - $21,337.00 Project Scope - Crack Seal City of Phoenix JOA List Project Title - City of Phoenix - Spring 2018 Job Order 1 Dollar Amount - $853,645.00 Project Scope - Crack Seal, Patching, Fog Seal, Chip Seal, Slurry Seal, Utility Adjustments and Grading IFB 175923 – Asphalt Maintenance & Repair Services Page 12 of 18 City of Glendale JOA List Project Title – 2017/2018 City of Glendale Crack Seal Dollar Amount - $1,023,670.00 Project Scope – Crack Sealing, and Crack Mastic Applications (First Year of 5 year renewable contract, just renewed for 2018/2019) City of Goodyear JOA List Project Title – FAST High Volume Spring 2018 Dollar Amount - $569,688.00 Project Scope – Double Layer FAST PMAR Chip Seal, Striping (First JOA of 5 year renewable contract) City of Casa Grande JOA List Project Title – Main Ave Cap Seal Dollar Amount - $125,843.00 Project Scope – FAST PMAR for the city of Casa Grande (Part of 3 year renewable contract) Project Title – FY 2018 PMAR Chip Seal Dollar Amount - $758,144.00 Project Scope – Neighborhood and Down Town Casa Grande PMAR Chip Seal, Striping, Traffic Control (Part of 3 year renewable contract) City of Chandler JOA List Project Title – TRMSS 2016 Dollar Amount - $1,117,809.00 Project Scope – TRMSS Fog Seal various locations throughout Chandler AZ Project Title – TRMSS 2017 Dollar Amount - $827,208.00 Project Scope – TRMSS Fog Seal various locations throughout Chandler AZ Project Title – TRMSS 2018 Dollar Amount - $1,089,249.00 Project Scope – TRMSS Fog Seal various locations throughout Chandler AZ City of Mesa JOA List Project Title – Mesa Crack Seal 2016 Dollar Amount - $969,300.00 Project Scope – Crack Sealing Services throughout Mesa AZ Project Title – Mesa Crack Seal 2017 Dollar Amount - $316,182.00 Project Scope – Crack Sealing Services throughout Mesa AZ Project Title – Mesa FY 17/18 Fall Fog Seal Dollar Amount - $406,933.00 Project Scope – CQS-TR fog seal throughout Mesa AZ Project Title – Mesa Spring 2017 Fog Seal Dollar Amount - $710,892.00 Project Scope – CQS-TR and TRMSS fog seal throughout Mesa AZ IFB 175923 – Asphalt Maintenance & Repair Services Page 13 of 18 In addition to the multiple projects Cactus successfully completed for Pinal County with the previous Pavement Preservation and Repair Services JOC, we were also involved with various surrounding agencies who took advantage of cooperative purchasing agreements for asphalt maintenance and repairs. Projects ranged from simple asphalt patching work orders to large scale chip seal and paving projects. The agencies and total dollar value over the last three years are listed below: Florence - $1,065,763 Globe - $1,005,193 Coolidge - $55,817 Apache Junction - $106,213 Wickenburg - $218,569 Tolleson - $78,971 Avondale - $662,987 Glendale - $598,093 QUESTION SET – Qualifications and Experience of Key Personnel 4.0.1 QUESTION: Identify and list the qualifications and experience of the key people who will be responsible for performing the work under the resulting contract. RESPONSE: Jeff Smith – Project Manager/Single-Point-of-Contact Jeff Smith will not only be your Single-Point-of-Contact, he will also be the Project Manager for the construction phase of the JOC. Jeff has been an industry professional for over 41 years specializing in pavement preservation system applications and construction management. Jeff has spent much of his career managing asphalt rubber technology transfer throughout the western United States and has consulted worldwide. Jeff Abram – Senior Estimator Jeff Abram will be the Senior Estimator who will coordinate pre-construction and estimating. Jeff has over 12 years of experience in the construction management industry. He is proficient in estimating and project supervision as well as accounting, finance, management, logistics, production, and manufacturing. He has been involved in projects including asphalt paving, chip sealing, crack sealing, fog sealing, Portland Cement Concrete Pavement, paving, bridge construction, pipe and box culvert installation, earthwork, mining, demolition, and all other aspects of the pavement maintenance and heavy civil construction industry. Scott McMorine – Chip Seal and Fog Seal Division Manager Scott McMorine will be the Chip Seal and Fog Seal Division Manager for this JOC. Scott has over 10 years of experience in the paving, chip seal, crack seal and fog seal industry, specializing in JOC work. As division manager, Scott will work with Jim Pulice and Oscar Gonzales on production, logistics and other tasks associated with the day-to-day operations. Scott has worked with multiple cities and counties throughout the state of Arizona on JOC and cooperative purchasing contracts as a Project Manager and Division Manager. Kyle Gooding – Crack Seal and Seal Coat Division Manager Kyle Gooding will be the Crack Seal and Seal Coat Division Manager for this JOC. Kyle has over 8 years of experience in the paving industry as a laborer, crack seal and seal coat foreman, and IFB 175923 – Asphalt Maintenance & Repair Services Page 14 of 18 division manager. He currently supervises four crews on projects for municipalities, airports, private corporations, state/county agencies, schools, and management companies. Oscar Gonzales – Field Operations Manager Oscar Gonzales is the Field Operations Manager for Cactus Asphalt. Oscar has 21 years of experience in the construction industry working from laborer, operator, paving foreman, to division manager and now Operations Manager. He currently oversees the production and employees of all our crews in the field, monitoring budgets and material quantities and creating and maintaining processes and procedures for job set-ups. 4.0.2 QUESTION: Discuss key personnel and their perspective and experience on the partnering, quality control, project scheduling, claims, dispute resolution, changes in Scope of Work, construction safety, value engineering, balancing workloads and ways to reduce costs to the County. RESPONSE: Cactus has over 14 years of experience successfully procuring and completing various types of JOCs. Cactus’s key personnel team will be the following group of highly experienced people. Jeff Smith will be Project Manager and the Single-Point-of-Contact concerning JOAs associated with this JOC. Jeff has 41 years of experience concerning all aspects of Pavement Preservation Applications and Services. Scott McMorine – Chip Seal and Fog Seal Division Manager (10 years of experience), Jeff Abram - Senior Estimator (12 years of experience), Kyle Gooding - Crack Seal and Seal Coat Division Manager (8 years of experience) and Oscar Gonzales – Field Operations Manager (21 years of experience) will round out the Cactus personnel that will be assigned to Pinal County JOAs. As a team, these individuals will draw from over 90 years of pavement preservation rehabilitation and maintenance services to partner with Pinal County. The following is the perspective and experience of our group and how we will collectively focus on: Partnering - is the primary advantage of the JOC delivery method. The Cactus team considers partnering a very important aspect concerning our future relationship with Pinal County. Through our experience, partnering and value engineering will take place in every aspect of project delivery from pre-construction through project closeout. Every item of work in a JOA should be discussed and an approach agreed upon during pre-construction meetings. As variables arise during construction, the partnering process is even more important as Cactus and Pinal County work to construct projects in a timely manner and at a very high level of quality. Quality Control - is key to state of the art construction practice, superior materials application and project longevity. As partners, Pinal County and Cactus will confirm through pre-testing and product certification the quality of all materials that have been specified for use on a specific JOA. Construction practice along with sampling and testing protocol will be identified through partnering meetings and utilized as a starting point for JOA implementation. JOA variables will be handled in the field or escalated through proper channels established in the pre-construction meeting. Project Scheduling - is very important regarding timely JOA completion. As with past JOCs that Cactus has had with Pinal County, we will strive to have pre-construction meetings early in the spring to determine the scope of the JOA(s) that have been assigned to Cactus. Projects concerning these JOAs will be scheduled immediately to confirm dates of construction, time frame of the JOA and to IFB 175923 – Asphalt Maintenance & Repair Services Page 15 of 18 procure materials supply when needed. At all times, JOAs awarded to Cactus will receive high priority concerning scheduling taking fiscal year end into consideration. Claims - are always a concern, however Cactus will strive to avoid them. This is done through good communication and meeting the expectations of Pinal County on every JOA. Of course variables do occur, and depending on the scope of work could require a change in plan. As partners, Pinal County and Cactus should be able to work out individual project variables to the satisfaction of each entity, avoiding claims and additional cost to the County. Over the past eight years, Cactus has never had a claim on a Pinal County JOC JOA. Dispute Resolution - goes hand in hand with the issue of claims. It is critical in a partnering atmosphere that each partner be willing to recognize variables either before or after construction begins and to negotiate a "means to an end". We believe that this will help to avoid a high percentage of potential disputes that could arise on a JOA. If a dispute were to arise, there needs to be a dispute resolution ladder in place, which is normally formulated at the pre-construction meeting. With the proper resolution channels in place, we can move to get issues settled quickly so as not to negatively affect the production schedule of the project. Over the past eight years working with Pinal County on previous JOCs, Pinal County and Cactus have been able to solve issues immediately in the field and have avoided project down time. Balancing Workloads - is critical to successfully complete JOA work at the appropriate time and on budget. Cactus is a highly diversified company with multiple crews that perform various types of work from crack sealing to hot mix overlay and concrete. Our crews are made up of highly qualified individuals that have been cross trained to work in all aspects of our pavement preservation and construction disciplines. Over the past eight years working with Pinal County on previous JOAs, Cactus has been able to schedule all required work including additional work that needed to be done quickly due to fiscal year end issues. Ways to Reduce Cost - are always paramount in a JOC. Of course Value Engineering is the primary way to evaluate construction procedure choice and what makes sense for Pinal County on specific JOAs. Concerning JOAs with set specifications, streamlining procedures and timeframe of construction will certainly reduce cost. As we look at cost savings, it is important to confirm where these savings can be realized and that Pinal County and Cactus can work together to minimize cost wherever possible. 4.0.3 QUESTION: Provide project information for up to 5 key personnel expected to be assigned to this JOC where the Contractor provided construction services similar to those listed in Section 2 of the Statement of Work. RESPONSE: Jeff Smith – Project Manager Pinal County Fall 2016 Chip Seal Pinal County Crack Seal FY 16-17 County Wide Pinal County Crack Seal FY 17-18 Pinal County Spring 2018 Chip Seal Pinal County Fog Seal FY 17-18 Pinal County Chip Seal FY 17-18 Pinal County San Manuel Airport TRMSS Pinal County ARDP Chip Seal FY 15-16 Pinal County Crack Seal FY 15-16 IFB 175923 – Asphalt Maintenance & Repair Services Page 16 of 18 Pinal County Pavement Preservation FY 15-16 Pinal County PASS Fog Seal - 2015 Pinal County Ironwood Road Pot Hole Patching and Crack Sealing – 2015 Pinal County Ironwood Fog Seal – 2015 Pinal County Fog Seal FY 15-16 Pinal County Pavement Preservation Spring FY 15 Mohave County PMAR FAST Spring Chip Seal 2018 Mohave County MC-250 Chip Seal 2017 Mohave County PMAR FAST Pierce Ferry Road Chip Seal 2015 Mohave County PMAR FAST Chip Seal Mohave Valley 2016 City of Sedona Chapel Hill Crack Seal City of Sedona – Posse Grounds Park, Parking Lot City of Sedona – Fall 2017/Spring 2018 Work City of Sedona – Spring 2017 Work City of Sedona – Sunset Drive and Mountain Shadows Drive Paving City of Sedona – Jordan Road Overlay City of Sedona – Jordan Road Sidewalk Construction City of Sedona – Palisades Overlay City of Sedona – Fog Seal and Crack Seal Spring 2016 City of Sedona – Seal Coat Spring 2018 City of Sedona – Chapel Hill Modified Seal Coat 2018 City of Sedona – Waste Water Treatment Plant Crack Seal City of Phoenix – Spring 2018 Job Order 1 Reference 3.0.4 for project information Jeff Abram – Senior Estimator Pinal County Fall 2016 Chip Seal Pinal County Crack Seal FY 16-17 County Wide Pinal County Crack Seal FY 17-18 Pinal County Spring 2018 Chip Seal Pinal County Fog Seal FY 17-18 Pinal County Chip Seal FY 17-18 Pinal County San Manuel Airport TRMSS Pinal County ARDP Chip Seal FY 15-16 Pinal County Crack Seal FY 15-16 Pinal County Pavement Preservation FY 15-16 Pinal County PASS Fog Seal - 2015 Pinal County Ironwood Road Pot Hole Patching and Crack Sealing – 2015 Pinal County Ironwood Fog Seal – 2015 Pinal County Fog Seal FY 15-16 Pinal County Pavement Preservation Spring FY 15 Maricopa County – Anthem Unit 21-B Maricopa County – Green “T” Intersection Maricopa County – 99th Avenue Channel Maricopa County – 253rd Avenue and Rockaway Hills Maricopa County – Litchfield Railroad Crossing Maricopa County – Northwest Maintenance Yard Driveway Maricopa County – Cross River Unit 8 Maricopa County – 126th Drive and Cercado Lane Maricopa County – 10th Street Reconstruction Maricopa County – Patton Road and Alma School Road Hot in Place Recycle Maricopa County – 165th Avenue IFB 175923 – Asphalt Maintenance & Repair Services Page 17 of 18 Maricopa County – Indian School Road and 191st Avenue Maricopa County – Avondale Blvd. & Jackrabbit Trail Overlay Maricopa County – Recker Road and San Tan Road Overlay Mohave County PMAR FAST Spring Chip Seal 2018 Mohave County MC-250 Chip Seal 2017 Mohave County PMAR FAST Pierce Ferry Road Chip Seal 2015 Mohave County PMAR FAST Chip Seal Mohave Valley 2016 City of Sedona Chapel Hill Crack Seal City of Sedona – Posse Grounds Park, Parking Lot City of Sedona – Fall 2017/Spring 2018 Work City of Sedona – Spring 2017 Work City of Sedona – Sunset Drive and Mountain Shadows Drive Paving City of Sedona – Jordan Road Overlay City of Sedona – Jordan Road Sidewalk Construction City of Sedona – Palisades Overlay City of Sedona – Fog Seal and Crack Seal Spring 2016 City of Sedona – Seal Coat Spring 2018 City of Sedona – Chapel Hill Modified Seal Coat 2018 City of Sedona – Waste Water Treatment Plant Crack Seal City of Phoenix – Spring 2018 Job Order 1 City of Glendale – 2017/2018 Crack Seal City of Goodyear – FAST High Volume Spring 2018 City of Casa Grande – Main Avenue Cap Seal City of Casa Grande – FY 2018 PMAR Chip Seal City of Chandler – TRMSS 2016 City of Chandler – TRMSS 2017 City of Chandler – TRMSS 2018 City of Mesa – Crack Seal 2016 City of Mesa – Crack Seal 2017 City of Mesa – FY 17/18 Fall Fog Seal City of Mesa – Spring 2017 Fog Seal Reference 3.0.4 for project information Scott McMorine – Chip Seal and Fog Seal Division Manager Pinal County Spring 2018 Chip Seal Pinal County Fog Seal FY 17-18 Pinal County Chip Seal FY 17-18 Mohave County PMAR FAST Spring Chip Seal 2018 City of Sedona – Fall 2017/Spring 2018 Work City of Phoenix – Spring 2018 Job Order 1 City of Goodyear – FAST High Volume Spring 2018 City of Casa Grande – Main Avenue Cap Seal City of Casa Grande – FY 2018 PMAR Chip Seal City of Chandler – TRMSS 2018 Reference 3.0.4 for project information Kyle Gooding – Crack Seal and Seal Coat Division Manager Pinal County Crack Seal FY 16-17 County Wide Pinal County Crack Seal FY 17-18 Pinal County San Manuel Airport TRMSS Pinal County Crack Seal FY 15-16 Maricopa County – Anthem Unit 21-B IFB 175923 – Asphalt Maintenance & Repair Services Page 18 of 18 City of Sedona Chapel Hill Crack Seal City of Sedona – Posse Grounds Park, Parking Lot City of Sedona – Fall 2017/Spring 2018 Work City of Sedona – Spring 2017 Work City of Sedona – Fog Seal and Crack Seal Spring 2016 City of Sedona – Seal Coat Spring 2018 City of Sedona – Chapel Hill Modified Seal Coat 2018 City of Sedona – Waste Water Treatment Plant Crack Seal City of Phoenix – Spring 2018 Job Order 1 City of Glendale – 2017/2018 Crack Seal City of Chandler – TRMSS 2016 City of Chandler – TRMSS 2017 City of Mesa – Crack Seal 2016 City of Mesa – Crack Seal 2017 City of Mesa – FY 17/18 Fall Fog Seal City of Mesa – Spring 2017 Fog Seal Reference 3.0.4 for project information Oscar Gonzales – Field Operations Manager Pinal County Ironwood Road Pot Hole Patching and Crack Sealing – 2015 Maricopa County – Green “T” Intersection Maricopa County – 99th Avenue Channel Maricopa County – 253rd Avenue and Rockaway Hills Maricopa County – Litchfield Railroad Crossing Maricopa County – Northwest Maintenance Yard Driveway Maricopa County – Cross River Unit 8 Maricopa County – 126th Drive and Cercado Lane Maricopa County – 10th Street Reconstruction Maricopa County – Patton Road and Alma School Road Hot in Place Recycle Maricopa County – 165th Avenue Maricopa County – Indian School Road and 191st Avenue Maricopa County – Avondale Blvd. & Jackrabbit Trail Overlay Maricopa County – Recker Road and San Tan Road Overlay City of Sedona – Fall 2017/Spring 2018 Work City of Sedona – Spring 2017 Work City of Sedona – Sunset Drive and Mountain Shadows Drive Paving City of Sedona – Jordan Road Overlay City of Sedona – Jordan Road Sidewalk Construction City of Sedona – Palisades Overlay City of Phoenix – Spring 2018 Job Order 1 Reference 3.0.4 for project information This information (responder’s profile and responses to questions for IFB175923) has been captured and copied from the Bonfire portal spreadsheet, in its entirety, to this Word document as to not lose information in the conversion from an Excel document to a PDF or TIF format (for posting to the Pinal County website and for OnBase retention). DEVELOPMENT SERVICESPHOTO MAPAll that is Ari z o na FO U NTAIN HILLST O W N OF INC. 19892020 AERIALCHAMA DRIVE(FOUNTAIN HILLS BLVD TOGUNSIGHT DR)GUNSIGHT DRCH AM A D RFOUNTAIN HILLS BLVDARROYO VISTA DRMONACO DRCOLONY WASHDESERT SAGE DRLA M O N T A N A D R DESERT SAGE DRSEGUNDO DRS U L L I V AN D R DEVELOPMENT SERVICESPHOTO MAPAll that is Ari z o na FO U NTAIN HILLST O W N OF INC. 19892020 AERIALPRIMROSE DRIVE(TUMBLEWEED DR TOLOST HILLS DR)P R IM R O S E D R S U N F L OW E R D R BITTERSWEET WAYPONDER O S A D R TUMBLEWEED DR PALISADES BLVD LOS T H I L LS DR PONDEROSA DR ITEM 8. F. TOWN OF FOUNTAIN HILLS STAFF REPORT    Meeting Date: 03/15/2022 Meeting Type: Town Council Regular Meeting Agenda Type: Regular Agenda                  Submitting Department: Administration Prepared by: Elizabeth A. Klein, Town Clerk Staff Contact Information: Request to Town Council Regular Meeting (Agenda Language):  DISCUSSION WITH POSSIBLE DIRECTION relating to any item included in the League of Arizona Cities and Towns’ weekly Legislative Bulletin(s) or relating to any action proposed or pending before the State Legislature. Staff Summary (Background) This is a regularly recurring agenda item on the Town Council agenda during the legislative session.  The goal of this agenda item is to obtain consensus from the Mayor and Council on legislative bills and to provide direction, if any, to staff to communicate the Town's position on the bills.  Each Council meeting the Legislative Bulletin will be attached to the Town Council agenda which will include legislative analyses of the bills and their impacts on municipalities.  The Mayor and Council will have an opportunity to review the bills that are under consideration in the Arizona State Legislature and provide direction on supporting or opposing the bills.  The Mayor and Council may also bring up other bills of interest to the Town of Fountain Hills for discussion that are not listed in the Legislative Bulletin.   Last November the Town Council approved the 2022 Legislative Policy Agenda which identified the major legislative priorities of the Town Council. The 2022 Legislative Policy Agenda document and the most recent Legislative Bulletins will also be included during the 2022 Legislative Session. Related Ordinance, Policy or Guiding Principle Council adopted 2022 Legislative Policy Agenda Risk Analysis N/A Recommendation(s) by Board(s) or Commission(s) N/A Staff Recommendation(s) N/A SUGGESTED MOTION MOVE to provide staff direction on one or more bills being considered by the State Legislature. Attachments 2022 Legislative Policy Agenda  Bulletin - Issue 7  Bulletin - Issue 8  Form Review Inbox Reviewed By Date Town Manager Grady E. Miller 03/03/2022 04:20 PM Form Started By: Elizabeth A. Klein Started On: 03/03/2022 04:04 PM Final Approval Date: 03/03/2022  1 2022 State Legislative Agenda The Town Council of Fountain Hills Prepared by Jack W Lunsford The Lunsford Group 2 Mission To enrich and provide an active quality of life for all residents and visitors through proactive community engagement, resolute stewardship of amenities and open spaces, and the enhancement of the overall health and well-being of our town. Strategic Priorities The Fountain Hills Strategic Plan is based on the following key goals or strategic priorities: Maximizing Economic Development Opportunities in Fountain Hills o Ensuring that Infrastructure in Fountain Hills is Well-Maintained and Safe o Attracting Families and Working Professionals o Ensuring that Fountain Hills Finances are Stable and Sustainable o Focusing on Strengthening the Community and Improving the Town’s Quality of Life 2022 Legislative Resolutions League of Arizona Cities and Towns (Endorsed and Supported)  AMEND state statute to specify a period when cities and towns may prohibit the use of permissible fireworks and modify definitions of illegal and permissible fireworks.  AMEND statute to allow cities and towns to amend their budgets after the initial budget has passes while following notice and hearing statutes and with strong oversight and approval requirements.  SEEK legislative and/or non-legislative solutions, working with housing and homeless advocates, the Department of Housing, and state legislators, to provide local governments, regional partners, and continuum of care providers additional resources to combat street homelessness in our communities.  SIMPLIFY the statutory mechanisms to dissolve water and wastewater districts once an area incorporates or gets annexed to relieve the tax burden on the citizens, if the town or town provides the same service that had been performed by the district, or the district service is no longer needed. 3 Town of Fountain Hills 2022 State Legislative Agenda CORE PRINCIPLES Preserve Local Funding PROTECT State-Shared Revenues – Arizona voters have prohibited municipalities from collecting a local income tax and luxury taxes and, in exchange, have authorized the establishment of an urban revenue-sharing distribution of state income taxes to municipal governments. Currently that percentage is 15%, however in 2021 the Legislature passed SB1828 which increased revenue-share percentage to 18%, effective in fiscal year 2023-2024. SB1828 is now on hold pending a final ruling from the Arizona Supreme Court as to the constitutionality of this and other 2021 legislative actions and, depending on the outcome, this could put pressure on the Arizona Legislature to revisit the provisions of the new law. Preserve Local Control OPPOSE Preemption of Local Authority – The Town strives to preserve local control so that its citizens can self-govern in their best interest. Every legislative session legislation is proposed that creates unfunded mandates on cities and towns and/or preempts the ability of municipal councils to set policy through ordinances and regulations at the local level which are in the best interest of their citizens and taxpayers. Often times this is a “one-size-fits-all” legislative approach that doesn’t consider the differences in municipalities or the priorities of the residents. Such efforts should be opposed. 2021 Key Positions  PRESERVE the current minimum urban revenue sharing percentage for cities and towns at 15%.  OPPOSE legislation to modify or expand legislative authority to seek SB1487 investigations by legislators pertinent to municipal authorities and to expand any applicable penalties.  SUPPORT legislation addressing the negative impacts short-term rental properties can have on adjacent properties and neighborhoods.  SUPPORT legislation that at a minimum will prohibit, on all days, the use of permissible consumer fireworks between the hours of 10:00 PM and 8:00 AM. 4 LEGISLATIVE POLICY STATEMENTS LOCAL GOVERNMENT  OPPOSE legislation to modify or expand legislative authority to seek SB1487 investigations by legislators pertinent to municipal authorit y and to expand any penalties.  SUPPORT legislation that further limits SB1487 provisions.  OPPOSE legislation that creates unfunded mandates for municipalities.  SUPPORT legislation on political signs to comply with Reed v. Town of Gilbert U.S. Supreme Court decision. LOCAL GOVERNMENT FINANCE  OPPOSE legislation that reduces or negatively impacts the collection of transaction privilege tax (TPT), State Shared Revenues, or other local revenues.  OPPOSE changing the imposition of construction sales taxes to “materials only” or other methods that do not equitably return those revenues to where the construction activity occurs. NEIGHBORHOODS and QUALITY OF LIFE ISSUES  SUPPORT legislation providing additional tools and remedies for municipalities to regulate short-term rentals in their communities.  OPPOSE legislation that would limit or curtail the Town’s current zoning authority, particularly in residential areas.  OPPOSE legislation that would prohibit or eliminate the transaction privilege tax on the renting or leasing of real property for residential purposes.  OPPOSE legislation that preempts a city or town from establishing or enforcing its ordinances regulating tobacco, vapor, or alternative nicotine products. 5 PUBLIC SAFETY  OPPOSE legislation that negatively impacts the Town’s Fire Code or its ability to enforce its Fire Code provisions.  OPPOSE legalizing additional fireworks or other changes that would increase the risk of fires to businesses, neighborhoods, residents and the McDowell Mountain Preserve.  PRESERVE local control authority that allows cities and towns to regulate the use and discharge of firearms within municipal boundaries. TRANSPORTATION  SUPPORT extension of ½-cent sales tax to support regional transportation projects in Maricopa County.  SUPPORT the continued viability of Highway Users Revenue Fund (HURF) funding to cities and towns. AZ League Legislative Bulletin: Issue 7 – February 25, 2022 Legislative Update: Today is day 47 of the legislative session. Lawmakers spent long days in the House and Senate chambers considering and voting on hundreds of bills this week. Each chamber’s Appropriations committee also held lengthy hearings to consider bills and last-minute strikers. The Senate and House will begin hearings to consider the opposite chamber’s bills starting next week. On Monday, the Senate followed the House’s lead in approving a raise to the aggregate expenditure limit for education spending. HCR 2039 re quired approval from two-thirds of legislators in both the House and Senate. While the raise is a temporary one-year exemption to the constitutional limit, lawmakers expressed a willingness to address the limit in a bi-partisan way permanently. Deferred Retirement Option Plan (DROP) Two measures related to DROP worked through the legislature this week. HB2337 deferred retirement optional plan; reinstatement, sponsored by Representative Payne (R-Peoria) expands the DROP to Tier 2 and 3 members in PSPRS and allows Tier 1 participants to extend their DROP period for 24 months. In the expanded 24 months, Tier 1 members will accrue interest at the smoothed rate of return in the plan. Representative Payne’s bill passed the House 31 -28-1. In the Senate, SB1268 PSPRS; deferred retirement option plan, sponsored by Senator David Livingston (R-Peoria) expands the DROP for 24 months for Tier 1 members allowing them to accrue interest at the smoothed rate of return for the final 24 months. This item went through the Committee of the Whole but failed to obtain a full chamber vote. The League opposes both DROP bills because of the historical negative impact DROP has had on the plan’s unfunded status. We do not believe it is prudent to expand constitutionally guaranteed benefits through DROP because of the potential negative impact that could have on compounding account balances that are underfunded. Additionally, cities and towns across the state are implementing efforts tailored to one-time retention, referral, and hiring bonuses to public safety personnel. We believe one-time front-end stipends are preferred to a guaranteed constitutional benefit that can create unfunded liabilities. Minimum Public Safety Expenditures A pair of measures proposes asking vote rs in the next general election whether to amend the constitution to require the Economic Estimates Commission (EEC) to 2 determine and inform all counties, cities, and towns of their minimum law enforcement expenditures. HB 2624 and its partner HCR 2028 minimum law enforcement expenditure amount, if passed, would penalize cities and towns by directing the State Treasurer to withhold funds in the amount a municipality failed to dedicate to public safety from a municipality's transaction privilege and excise tax revenue and redistribute the withheld sum to other cities and towns. The League opposes both measures because they infringe on local authority to make budget decisions limiting local government's ability to adjust to changing economic conditions. HCR 2028 fails to contemplate situations where municipalities make a lump sum payment towards their PSPRS unfunded liabilities. This payment would be represented as a public safety expense, even though it was one time. In this scenario, under HCR 2028, the municipality would be penalized because this would technically reduce their overall public safety funding, making them subject to withholding local funds by the State Treasurer. Local budgeting is an essential function of a city council that understands local obligations and the community's needs. HCR 2028 is pending Third Read in the House, while HB 2624 awaits House Committee of the Whole. Prime Contracting (HB 2701, HB 2749) A pair of measures that propose changes to state and local TPT under the construction contracting classifications, these bills will have significant negative revenue impacts on cities and towns. HB2701, TPT; prime contracting; tax base, increases the standard contracting deduction which represents direct labor from 35% to 40% in FY24 and to 45% in FY25 and beyond. Per the JLBC fiscal note, when fully implemented this change will reduce city and town revenues by $98.6 million per year. Proponents are saying this change is needed due to inflation and to move the Contra cting classification closer to being a tax on materials only. The League is opposed based on the revenue loss. There is no readily available data to support the fact that the deduction needs to be increased to address increased labor costs. The philosophical argument is that contracting should only be taxed on the materials used rather than the gross receipts from contracting activity with an exemption for direct labor. However, TPT imposed on every classification is based on gross receipts from the business activity, less allowed deductions. In the 1980s, the current built-in deduction of 35% replaced the prior deduction for actual direct labor expenses, which was the source of numerous audits and considerable controversy. To simplify the deduction, the Legislature and stakeholders negotiated the 35% value, despite abundant evidence and audit information that the true value of direct labor rarely reached 30%. More recently, an examination of U.S. Census Bureau data from 2012 confirmed that 35% was still mo re than the labor amounts reported by Arizona contractors across all disciplines. 3 HB2749, TPT; prime contracting; exemption; alterations , attempts to simplify the definition of “Alteration” for contracts involving residential property. Under the MRRA exemption, projects that meet the limitations to be considered an “alteration” are taxed on the materials only instead of on the full contract price under Prime Contracting. Under the bill, the current limitation for a residential project to be deemed an “alteration” (25% of full cash value) would be removed. In its place, any residential construction contract that did not cause an increase in the square footage of the property would be deemed “alteration.” The League is opposed to this change because there is a negative revenue impact that cannot be determined, it potentially pulls some small contractors currently covered by MRRA back into Prime Contracting, will only create different issues of controversy due to the ambiguity of “increased square footage,” and this proposal will not provide contractors with their primary goal: a bright -line test that ensures everyone is bidding jobs on the same basis. When this idea was proposed last year, it was discussed at length amongst the large group of stakeholders (ADOR, cities, and a wide variety of construction interests) that has been working through ongoing MRRA issues since its implementation. Despite many knowledgeable and experienced participants, that grou p failed to reach a consensus on the meaning of “increased square footage.” This challenge was further evident in committee when proponents offered at least three conflicting definitions, some of which seemed reliant on their personal interpretation of the phrase (“under one same roof”) or a reading of the proposed language that is not included in the text or clearly indicated by the context. Vehicle License Tax SB 1148 vehicle sale price; VLT , sponsored by Senator Michelle Ugenti-Rita (R- Scottsdale), proposes to base vehicle license taxes on the purchase price rather than the MSRP, which is the current practice. The bill's fiscal impact cannot be calculated since there is no way to gauge the difference between MSRP and the actual sale price on the purchase of new vehicles. The intent of this measure will undoubtedly reduce VLT collections overall. It also raises extensive practical questions about the reporting mechanism required and creates tax liabil ity inequities for all vehicle owners by moving away from the current uniform system. The measure passed out of the Senate Appropriations Committee this week on a party-line vote. The League opposes the effort because it will decrease state and local HURF revenues allocated for road and highway maintenance and repairs. The measure will additionally reduce the general fund revenues of county and city governments, which will ultimately necessitate reduced road maintenance, or tax increases on other goods or property to make up for the shortfall. 4 2022 Session Timeline Every session has deadlines pertaining to bill submissions and hearings. This year, the schedule is as follows: January 1/10 – First day of session 1/13 – House 7-bill Introduction Limit Begins (5 p.m.) 1/31 - Senate bill introduction deadline (5 p.m.) February 2/7 – House Bill Introduction Deadline (5 p.m.) 2/14 - 2/18 – Last week to hear bills in the chamber of origin March 3/21 – 3/25 – Last week to hear bills in the opposing chamber April 4/15 – Last Day for Conference Committees 4/19 – 100th Day of Session Legislative Bill Monitoring All bills being actively monitored by the League can be found by clicking the link below. Legislative Bill Monitoring AZ League Legislative Bulletin: Issue 8 – March 4, 2022 Legislative Update: Today is day 54 of the legislative session. This was the first week committees began considering bills from the opposite chamber. Lawmakers have until March 25th for all bills to be heard in committees, except for the Appropriations committee. With the legislative session at the halfway mark, there are rumors of special sessions to form an Arizona Water Authority, to repeal and replace tax cuts enacted in the previous legislative session, and to address election-related matters. SB1487 Expansion An effort to expand 1487 claims failed on the House floor this week. HB 2009 violations of state law; schools would have expanded the existing 1487 statute to include school districts. Under existing law, a legislator can file a 1487 complaint with the Attorney General if they allege that the governing body of a municipality or county took an action that violates state law or the constitution. The League was concerned about the measure because it expanded the 1487 statute to include written policies or regulations adopted by an agency or department within a municipality. This expansion would have placed civil servants in the middle of a political battleground and could have resulted in local governments being in a state of perpetual litigation simply f or doing their jobs. The measure failed on House Third Read on Wednesday by a vote of 26-32. A similar effort, HB 2276 state law; violation; schools; universities which expands the 1487 complaint process for universities, community colleges and school districts is pending House Committee of the Whole. The measure also includes provisions expanding complaints to apply to municipal department policies or regulations. The League opposes the measure. Guns in Public Places The Senate Judiciary Committee considered HB 2316 misconduct involving weapons; public places sponsored by Representative John Kavanagh (R- Fountain Hills) on Thursday morning. The measure would allow persons with valid concealed carry weapons (CCW) permit to carry a deadly weapon in a public establishment or at a public event unless the public building has security personnel and electronic weapons screening devices. If passed, the measure would have significant fiscal implications for jurisdictions wanting to keep concealed carry firearms out of public buildings, both in terms of the screening equipment that would be required and the ongoing costs of personnel to staff those entrances. For communities unable to meet the costs associated with screening devices, the measure essentially removes their local decision-making authority over policies affecting public buildings. HB 2316 makes a number of exemptions for other public entities like education institutions or prosecutorial agencies. The League opposes the measure and believes that the same logic used to justify these exemptions applies to city and town governments. The measure passed the committee on a party -line vote and is scheduled for the Rules Committee on Monday. . Fireworks Two League-supported measures related to fireworks passed out of Senate and House committees this week. SB 1275 and HB 2226 were sponsored by Senator J.D. Mesnard (R-Chandler) and Representative Amish Shah (D-Phoenix). The mirror bills would allow municipalities to regulate the use of permissible fireworks from 11 p.m. to 8 a.m. every day, except for New Year's Eve and Independence Day, in which fireworks can be regulated between 1 a.m. to 8 a.m. The measure has garnered bipartisan support in both chambers. The League believes the bills are a reasonable approach to peeling back the preemption under current law concerning fireworks. The overnight hours outlined in the bill set a reasonable expectation for when constituents can expect the noise associated with fireworks to subside. Street Homelessness - Sanctioned Campsites SB 1581 housing; grants; homelessness; camping; appropriation passed the Senate on Thursday. The measure would offer grants to municipalities and counties to develop “sanctioned camping sites” for homeless encampments. The League is deeply committed to working with lawmakers, housing organizations, advocates for individuals experiencing homelessness, counties, state agencies, and stakeholders to seek legislative and non -legislative solutions to address homelessness and housing affordability. However, cities and towns have serious concerns with implementing SB1581 in its current form. One problem is that the sanctioned camping sites are not a proven effective solution to ending homelessness. Additionally, we are concerned about the potential litigation that would result if municipalities were required to enforce urban camping bans to receive grant funding. Enforcing street camping bans would violate the Ninth Circuit decision in Martin v. Boise. California cities have already been subject to these lawsuits and have lost court battles for enforcing portions of their street camping bans. Instead of expending public dollars in litigation, these funds could be allocated for proven programs to address homelessness, including housing and outreach programs, health and support services for mental illness, drug addiction treatment, as well as job placement training programs. As it stands, SB1581 needs further amending if it is to effectively addr ess the homelessness problem and not just push those in need further out of sight of the help they need. The measure is awaiting committee assignment in the House. 2022 Session Timeline Every session has deadlines pertaining to bill submissions and hearings. This year, the schedule is as follows: January 1/10 – First day of session 1/13 – House 7-bill Introduction Limit Begins (5 p.m.) 1/31 - Senate bill introduction deadline (5 p.m.) February 2/7 – House Bill Introduction Deadline (5 p.m.) 2/14 - 2/18 – Last week to hear bills in the chamber of origin March 3/21 – 3/25 – Last week to hear bills in the opposing chamber April 4/15 – Last Day for Conference Committees 4/19 – 100th Day of Session