Loading...
HomeMy WebLinkAboutOrd 1997-07 ORDINANCE 97-07 AN ORDINANCE OF THE MAYOR AND COMMON COUNCIL OF THE TOWN OF FOUNTAIN HILLS, ARIZONA, AMENDING THE TOWN CODE, CHAPTER 16, STREETS AND SIDEWALKS, ARTICLE 16-1, ENCROACHMENTS, SECTION 16-1-1, DEFINITIONS, 16-1-2, PERMIT REQUIRED, 16-1-12, REVOCATION OF PERMIT, 16- 1-16, EXISTING AND EMERGENCY WORK, AND 16-1-18, EXCAVATION OF NEWLY PAVED STREETS, BY ADDING A DEFINITION OF "URGENT NECESSITY" AND BY ADDING PENALTIES FOR FAILING TO IMMEDIATELY RESTORE THE ROAD SURFACE AND FOR EMERGENCY EXCAVATION OF NEWLY CONSTRUCTED OR RESURFACED STREETS. BE IT ORDAINED BY THE MAYOR AND COMMON COUNCIL OF THE TOWN OF FOUNTAIN HILLS AS FOLLOWS: Section 1. That the Town Code Chapter 16, Streets and Sidewalks, Article 16-1, Encroachments, Section 16-1-1, Definitions, is hereby amended to read as follows: F. "URGENT NECESSITY" MEANS DAMAGE TO ANY PIPE OR CONDUIT THAT POSES AN IMMEDIATE THREAT TO LIFE, PROPERTY, OR LOSS OF UTILITY SERVICE, THE REPAIR OF WHICH MAY NOT BE POSTPONED UNTIL AN ENCROACHMENT PERMIT IS ISSUED WITHOUT INJURY TO PERSONS OR SUBSTANTIAL DAMAGE TO SUCH PROPERTY. Section 2. That the Town Code Chapter 16, Streets and Sidewalks, Article 16-1, Encroachments, Section 16-1-2, Permit Required, is hereby amended to read as follows: Section 16-1-2 Permit Required D. No permit is required for a continuing use or maintenance of encroachments lawfully installed by public utilities, for changes therein or thereto where such CONTINUING USE, MAINTENANCE, changes or additions require no excavation of the right-of-way. Section 3. That the Town Code Chapter 16, Streets and Sidewalks, Article 16-1, Encroachments, Section 16-1-12, Revocation of Permit, is hereby amended as follows: Section 16-1-12 Revocation of Permit PUBLISHED FOUNT :N HILLS TiM Cj /FAIL Sfi519 MOTION IL D 6 SECOND ('1 res Page 1 of 4 COUNT .- .. ..5 - a + DIOriCn 1.0.wry __ 10c,\) B. If at any time the Town Engineer finds, IN WRITING, that the delay in the Liv completion of the work authorized by the encroachment permit is due to lack of diligence on the part of the permittee, he MAY cancel the permit and restore the right-of-way or water course to its former condition. ALL COSTS AND FEES FOR ANY RESTORATION PLUS A THREE HUNDRED DOLLAR ($300) ADMINISTRATIVE FEE SHALL BE CHARGED TO THE PERMITTEE. IF A PERMITTEE FAILS TO PAY ANY FEES CHARGED IN CONNECTION WITH A PERMIT UNDER THIS ARTICLE WITHIN FIFTEEN DAYS OF RECEIPT OF NOTICE SUCH PAYMENT IS DUE, THE TOWN ENGINEER MAY REVOKE ALL OF THE PERMITTEE'S EXISTING PERMITS AND MAY DENY ANY FURTHER PERMITS TO THE PERMITTEE UNTIL PAYMENT IS RECEIVED FOR ALL FEES DUE. THE DETERMINATION OF THE TOWN ENGINEER SHALL BE FINAL AND UNAPPEALABLE. C. UNLESS SPECIFICALLY MODIFIED IN THE ENCROACHMENT PERMIT CONDITIONS, FAILURE TO PERFORM THE FOLLOWING SHALL CONSTITUTE A LACK OF DILIGENCE ON THE PART OF THE PERMITTEE: 1. STOP THE SEEP OR FLOW OF A LIQUID ONTO OR UPON A STREET WITHIN FIVE (5) DAYS OF RECEIPT OF NOTICE FROM THE TOWN. 2. PROVIDE AND MAINTAIN REQUIRED BARRICADING AND OTHER NECESSARY TRAFFIC CONTROL MEASURES, AS DETERMINED BY THE TOWN ENGINEER, FOR THE ENTIRE PERIOD OF THE ENCROACHMENT. 3. CLOSE OR BACKFILL AN EXCAVATED AREA WHERE NO WORK IS OCCURRING FOR A PERIOD OF THREE (3)CONSECUTIVE DAYS. THE TOWN ENGINEER MAY REQUIRE THE PERMITTEE TO BACKFILL DAILY, INSTALL PLATES, OR TAKE OTHER SUCH ACTIONS THE ENGINEER DEEMS NECESSARY FOR TRAFFIC SAFETY, ACCESS, CIRCULATION, OR PROPER DRAINAGE. 4. PROVIDE A TEMPORARY PAVEMENT SURFACE (COLD PATCH) WITHIN THREE (3) DAYS AFTER BACKFILLING; ADEQUATELY MAINTAIN THE TEMPORARY PAVEMENT SURFACE; AND INSTALL THE PERMANENT PAVEMENT SURFACE WITHIN THIRTY (30) DAYS AFTER BACKFILLING. 5. RESTORE IMPROVED LANDSCAPE AREAS WITHIN SEVEN (7) DAYS AFTER BACKFILLING. 6. RESTORE NATIVE DESERT AREAS BY PLANTINGS, SPRIGGINGS, AND SEEDING WITHIN SIXTY (60) DAYS AFTER BACKFILLING. 7. REMOVE STEEL PLATES WITHIN THREE (3) DAYS AFTER PLACEMENT ON ROADWAYS WITH A POSTED SPEED LIMIT OF 35 MPH OR HIGHER. REMOVE STEEL PLATES WITHIN TWENTY (20) DAYS FOR ANY OTHER ROADWAY UNLESS SUCH STEEL PLATES ARE INSTALLED FLUSH WITH THE TOP OF THE SURROUNDING ASPHALT. D. ANY PERMIT HOLDER THAT HAS BEEN DETERMINED, BY THE TOWN ENGINEER, TO HAVE SHOWN A LACK OF DILIGENCE, AS SET FORTH IN SUBPARAGRAPH C ABOVE, TWO (2) OR MORE TIMES WITHIN TWELVE (12) CONSECUTIVE MONTHS, SHALL BE GUILTY OF A CLASS 1 MISDEMEANOR. Page 2 of 4 Section 4. That the Town Code Chapter 16, Streets and Sidewalks, Article 16-1, Encroachments, Section 16-1-16, Existing and Emergency Work, is hereby amended as follows: Section 16-1-16 Existing-end Emergency Work This article does not prevent any person from maintaining any pipo or conduit lawfully on or undor any public stroot, or for making excavations necessary for a preservation of life or property when an urgent necessity therefore arises while the town offices are closed. A person making an emergency use or encroachment on a public street shall apply for a permit therefor within one calendar day after the offices of the town are open. Section 5. That the Town Code Chapter 16, Streets and Sidewalks, Article 16-1, Encroachments Section 16-1-18, Excavations and Newly Paved Streets, is hereby amended as follows: Section 16-1-18 Excavations and Newly Paved Streets C. NOTWITHSTANDING PARAGRAPH B OF THIS SECTION, ANY PERSON WHO CAUSES EXCAVATION AS PRESCRIBED IN PARAGRAPH A OF THIS SECTION SHALL BE SUBJECT TO A BASE FEE OF $100 PER EXCAVATION PLUS THE FOLLOWING FEE PER LINEAL FOOT OF PAVEMENT REPLACEMENT: SURFACE AGE (YEARS) FEE(PER LINEAL FOOT) NEWLY PAVED OR OVERLAYED 0-2 $10 NEWLY PAVED OR OVERLAYED 2-4 $ 5 SLURRY OR CHIP SEALED 0-2 $ 2 THESE FEES MAY BE WAIVED BY THE TOWN ENGINEER WHEN THE EXCAVATION IS AN APPROVED PART OF A COMPREHENSIVE PROACTIVE, SCHEDULED, REBUILD PROGRAM OR AN EXTENSION OF SERVICE TO AREAS EXISTING AS OF 1991 IN ADDITION TO ALL OTHER TERMS AND CONDITIONS OF THIS ARTICLE. Page 3 of 4 Section 6. That Town Code Chapter 16, Streets and Sidewalks, Article 16-1, Encroachments, is hereby amended as follows: ARTICLE 16-1 ENCROACHMENTS 16-1-1 Definitions 16-1-2 Permit Required 16-1-3 Other exceptions to Permit Requirements 16-1-4 Application for Permit 16-1-5 Issuance of Permit 16-1-6 Assignment 16-1-7 Fees 16-1-8 Insurance; Holding Town Harmless 16-1-9 Term of Permit 16-1-10 Display 16-1-11 Supervision and Inspection of Work 16-1-12 Revocation of Permit 16-1-13 Manner of Giving Notice 16-1-14 Standards and Specifications 16-1-15 Appeal 16-1-16 Existing and Emergency Work 16-1-17 Authority of Council to Prohibit Specific Excavations 16-1-18 Excavations of Newly Paved Streets 16-1-19 Compliance with Other Laws 16-1-20 Cost of Work 16-1-21 Article Not Applicable to Town Work 16-1-22 Liability of Town PASSED AND ADOPTED by the Mayor and Common Council of the Town of Fountain Hills, Arizona this 15th day of May, 1997. FOR THE TOWN OF FOUNTAIN HILLS: ATTESTED TO: ,-,• 6/14-kl-L6 /114t4/-J Jer d L. Iles, iVeeori Cassie B. Hansen, Town Clerk REVIEWED BY: APPROVED AS TO FORM: r /7// 4.. 1-64.P Paul L. ordin, Town Manager William E. Farrell, Town Attorney L G:\ENCROACHI.ORD Page 4 of 4