Loading...
HomeMy WebLinkAboutOrd 1998-28 ORDINANCE 98-28 AN ORDINANCE OF THE MAYOR AND COMMON COUNCIL OF THE TOWN OF FOUNTAIN HILLS, AMENDING THE TOWN CODE, CHAPTER 7, BUILDINGS AND BUILDING REGULATIONS, ARTICLES 7-2, FEES, AND 7-8, COMMUNITY DEVELOPMENT AND ENGINEERING FEE SCHEDULE,BY INCREASING CERTAIN FEES IN EACH ARTICLE. BE IT ORDAINED, BY THE MAYOR AND COMMON COUNCIL OF THE TOWN OF FOUNTAIN HILLS, AS FOLLOWS: Section 1. That the Town Code, Chapter 7, Buildings and Building Regulations, Article 7-2, Fees, is hereby amended to read as follows: ARTICLE 7-2 FEES A. The Uniform Building Code, 1991. 1997 Edition, Volume 1, Section 107, Table 1-A Building Permit Fees shall be adopted, except that the permit fee for new single-family and two-family dwellings shall be a single fee, containing structural, architectural, electrical, mechanical and plumbing systems, and shall be $0.26 $0.41 per square foot or major fraction thereof of the total floor area under roof, including covered patios, basement and all area enclosed within the building walls and roof overhangs. %,,, B. The permit fee for new structures, except for new single-family and two-family dwellings, and for all renovation,remodeling and repairs, shall be based upon the valuation of the construction for which the permit is issued based on Table 1-A. C. The determination of value or valuation under a provision of this code shall be made by the building official. Unless otherwise provided, in all cases in which the building permit fee is based upon the value of construction work, the value to be used in computing the building permit shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems and any other permanent equipment; provided, however, that the minimum valuation for the type of construction for which the permit is issued shall be the cost for such construction as listed in that issue of the publication entitled Building Standards (or equivalent publication of the International Conference of Building Officials) published immediately preceding the date of the issuance of the permit, with adjustment for regional variations. D. Plan Review Fees. When a plan or other data is required to be submitted by Section 106.3.2, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be as follows: (1) For single family and two family dwellings $0.11 $0.26 per square foot; and(2) for all structures other than single family or two family dwellings - sixty-five (65%)percent of the permit fee. E. All other fees shall be computed from applicable codes. 0112m0ASSI0FAIL 3 A N mat r Ordinance 98-28 SECOND W ` . 1 of 4 COUNY . ..• Section 2. That the Town Code, Chapter 7, Buildings and Building Regulations, Article 7-8, Community Development and Engineering Fees, is hereby amended to read as follows: ARTICLE 7-8 COMMUNITY DEVELOPMENT AND ENGINEERING FEE SCHEDULE PLANNING AND ENGINEERING DEPARTMENTS FEE SCHEDULE ALL APPLICATION FEES ARE NON-REFUNDABLE PERMIT FEE Area Specific Plans: $ 3,000.00 plus $10 a lot or unit, whichever is greater Area Specific Plan Amendments: $ 2,000.00 plus $5 a lot or unit, whichever is greater General Plan Amendments: $ 3,000.00 plus $15 an acre. Preliminary Plats: $ 100.00 per lot,unit or tract up to $700.00 2,500.00+ $ 10.00 per lot,unit or tract over 7 25 Cut& Fill Waiver: $ 300.00 Final Plats and Plat Abandonments: $ 100.00 per lot, unit or tract, $500:A0 700.00 maximum charge PLUS $10.00 PER LOT, UNIT, OR TRACT OVER 7 WITH $1,000.00 MAXIMUM CHARGE. Final Plat Improvement Plan Checking: $ 200.00 250.00 per sheet (includes 2nd & 3rd reviews) except water and sewer plans. $ 100.00 125.00 per sheet (includes 2nd & 3rd reviews) water and sewer plans only. $ 50.00 75.00 per sheet with corrections (4th + reviews) Subdivision Recording : $ 30.00 per page for plat filed for record, + $ 3.00 per page for each additional copy, and; $ 7.00 for each instrument, + $ 1.00 for each additional page over 5 pages. Rezones(Map or Text Amendments): $ 450.00 1,000.00 + mailing label costs* i sign depesit# Planned Unit Developments: $ 7-50,00 1,000.00 + mailing label costs* i sign L Ordinance 98-28 2 of 4 Li Special Use Permits: (and Amendments) $ 450.00 750.00 + mailing label costs* + sig r Temporary Use Permits: $ 200.00+mailing label costs* Comprehensive Sign Plans: (and Amendments) $ 200.00 Grand Opening Sign Permit: $ 25.00 Sign Permit: <32 SQ. FT.: $ 25-00 50.00 PER SIGN (Excludes Building Permit) >32 SQ. FT. $ 100.00 PER SIGN $ 1.00 per sq. ft. proposed over 25 sq. ft. Variances: $ 450.00+mailing label cost* + sign deposit# Appeal of a Decision by the $ 7--5440 200.00 Zoning Administrator Easement or Right-of-Way Abandonment: $ 200.00+mailing label cost* ZONING VERIFICATION LETTER $ 50.00 CONTINUANCE AT APPLICANT $ 100.00 PLUS ADDITIONAL REQUEST PUBLIC NOTICE COST NOTES: * Plus a charge of$5.00 per mailing label. # Plus a$25.00 per sign,refundable deposit for on-site posting of public notice(s). The subdivision recording fees are per the Maricopa County Recorder's fee schedule and are therefore subject to change. Section 3. That all Town Code provisions and all ordinances in conflict herewith are hereby repealed. Section 4. That this Ordinance shall become effective at 12:01 a.m. on January 1, 1999. L Ordinance 98-28 3 of 4 PASSED AND ADOPTED,by the Mayor and Common Council of the Town of Fountain Hills this 3rd day of September, 1998. FOR THE TOWN OF FOUNT N HILLS: ATTESTED TO: 61-4-d-,- C#6 ILL/A—) Sharon Morgan, M yo Cassie B. Hansen, Town Clerk REVIEWED BY: APPROVED AS TO FORM: Paul L. ordin, Town Manager William E. Farrell, Town Attorney L L Ordinance 98-28 4 of 4